Html Construction Inc.

Contractor license
1009168
State license record
Based in
Sunnyvale
On San Francisco permits
Jan 2016 to Jul 2017
Last 24 months
0 permits filed

5 permits since 2000: 4 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 2

2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 251 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 1, 2016Completed
final sign-off Nov 2016
676 09th Avreplace (1) kitchen window, not visible from street, u<0.32, size approx. 36" x 60", same size, same location, replace in-kind.
Details
Permit
201603010858
Status
complete
Filed
Mar 1, 2016
Permit issued
Mar 1, 2016
Final sign-off
Nov 7, 2016
Declared cost
$500
Address
676 09th Av

replace (1) kitchen window, not visible from street, u<0.32, size approx. 36" x 60", same size, same location, replace in-kind.

Open the permit page

$500
Jan 27, 2016Never finaled
issued Jan 2016, no final
676 09th Avkitchen remodeling, swapping old cabinet with new one, no change on wall and opening, upgrading the electrical main, 50% wattage minimum, lighting has to be high efficacy, replacement 1 kitchen window not visible from street, add vent to roof from residential hood to minimum 3 ft. from property line
Details
Permit
201601278105
Status
issued
Filed
Jan 27, 2016
Permit issued
Jan 27, 2016
Declared cost
$22,000
Address
676 09th Av

kitchen remodeling, swapping old cabinet with new one, no change on wall and opening, upgrading the electrical main, 50% wattage minimum, lighting has to be high efficacy, replacement 1 kitchen window not visible from street, add vent to roof from residential hood to minimum 3 ft. from property line

Open the permit page

$22,000