Back to bathroom remodel contractors
Houseworks Enterprises Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Sep 2026
- Last 24 months
- 19 permits filed
327 permits since 2000: 267 completed, 10 in progress, 29 never finaled, 21 expired or cancelled.
Of the 29 never-finaled permits, 4 are 3 to 5 years old, 7 are 5 to 10 years old, 18 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
83 bathroom remodel permits: 68 completed, 3 in progress, 7 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 3219 Rivera St | remodel of g/f to connect the downstairs space to the main house with a new hallway between the foyer and bedroom. reconfigure the existing downstairs space to accomodate a bedrooom with closet and enlarge an existing bathroom. some structural work and relocation of mep equipment required per plans.Details
remodel of g/f to connect the downstairs space to the main house with a new hallway between the foyer and bedroom. reconfigure the existing downstairs space to accomodate a bedrooom with closet and enlarge an existing bathroom. some structural work and relocation of mep equipment required per plans. | $25,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 1 Newburg St | remodel kitchen w/ all new cabinets,fixtures,finishes,electrical & appliances. kitchen to have the same footprint but with expanded openings to the living room an breakfast room. expand/remodel a bathroom with new electricl, fixtures and finishes.Details
remodel kitchen w/ all new cabinets,fixtures,finishes,electrical & appliances. kitchen to have the same footprint but with expanded openings to the living room an breakfast room. expand/remodel a bathroom with new electricl, fixtures and finishes. | $25,000 |
| May 19, 2026 | In progress issued May 2026 | 1 Newburg St | demolish the interior fixture, finishes of the kitchen, & bathroom. defer submittal for renovation permit will be submitted following the analysis of the exposed structure.Details
demolish the interior fixture, finishes of the kitchen, & bathroom. defer submittal for renovation permit will be submitted following the analysis of the exposed structure. | $2,500 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 518 Church St | replace existing plumbing fixtures and finishes in main bathroom, powder room.Details
replace existing plumbing fixtures and finishes in main bathroom, powder room. | $25,000 |
| Mar 7, 2025 | Completed final sign-off Jun 2025 | 24 Costa St | renovations to include a new tub in the primary bathroom; removal of existing wll between 2nd floor bedroom and den; modification to existing storage loft accessDetails
renovations to include a new tub in the primary bathroom; removal of existing wll between 2nd floor bedroom and den; modification to existing storage loft access | $20,000 |
| Dec 13, 2024 | Completed final sign-off Dec 2025 | 2627 Turk Bl | enclosure of a center atrium space and incorporation of that space into a kitchen renovation. remodel 3 bathrooms, relocation of laundry w/d. replacement of 4 street facing windows in kind. replacement of 10 rear facing windows in kind. replacement of 3 (e) skylights. add 2 skylights in kitchenDetails
enclosure of a center atrium space and incorporation of that space into a kitchen renovation. remodel 3 bathrooms, relocation of laundry w/d. replacement of 4 street facing windows in kind. replacement of 10 rear facing windows in kind. replacement of 3 (e) skylights. add 2 skylights in kitchen | $100,000 |
| Aug 28, 2023 | Completed final sign-off May 2025 | 326 Lexington St | residential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work.Details
residential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work. | $100,000 |
| Jul 17, 2023 | Completed final sign-off Feb 2024 | 2177 09th Av | full primary bathroom and guest bathroom remodel. install new exhaust fan in both bathroomsDetails
full primary bathroom and guest bathroom remodel. install new exhaust fan in both bathrooms | $50,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2025 | 565 Arkansas St | interior remodel of 2 story sfr to convert 3 bedroom 2 bath to a 4 bedroom 3 bath home inclding full foundation replacement at the front of the house. new door and window at the side and the rear of the house and kitchen remodel. all work to be done under (e) bldg envelope.Details
interior remodel of 2 story sfr to convert 3 bedroom 2 bath to a 4 bedroom 3 bath home inclding full foundation replacement at the front of the house. new door and window at the side and the rear of the house and kitchen remodel. all work to be done under (e) bldg envelope. | $250,000 |
| Jun 8, 2023 | Completed final sign-off Dec 2023 | 2 Edgehill Wy | remodel (e) bathroom on the second floor. replace finishes and fixtures with in kind.Details
remodel (e) bathroom on the second floor. replace finishes and fixtures with in kind. | $25,000 |
| Dec 22, 2022 | Completed final sign-off Apr 2024 | 51 28th St | 1)revision bpa#200607075941 & 202210144414. 2)renovation of extg garage on 1st lvl to add nw master bedrm, guest bedrm, nw office, nw bathroom & nw laundry rm. 3)demo extg stair to the rear yard & provide nw enclosed stair connecting lvl 1 & lvl 2 within envelope of the previously approvedDetails
1)revision bpa#200607075941 & 202210144414. 2)renovation of extg garage on 1st lvl to add nw master bedrm, guest bedrm, nw office, nw bathroom & nw laundry rm. 3)demo extg stair to the rear yard & provide nw enclosed stair connecting lvl 1 & lvl 2 within envelope of the previously approved | $150,000 |
| Nov 14, 2022 | Completed final sign-off Nov 2022 | 118 Brewster St | rev to pa# 202108186616 the closet is to be on the left side of the bathroom instead of the right side of the bathroomDetails
rev to pa# 202108186616 the closet is to be on the left side of the bathroom instead of the right side of the bathroom | $71,000 |
| Oct 11, 2022 | Expired or cancelled cancelled Jan 2026 | 170 King St | in kind kitchen and two bathrooms remodel. replacement of cabinets, finishes, fixtures with in kind like materials. no structural work or removal of walls. no change in openings.Details
in kind kitchen and two bathrooms remodel. replacement of cabinets, finishes, fixtures with in kind like materials. no structural work or removal of walls. no change in openings. | $110,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2023 | 3035 22nd Av | replace kitchen, primary bathroom, and guest bathroom in kind. new cabinets, counter, flooring, plumbing fixtures.Details
replace kitchen, primary bathroom, and guest bathroom in kind. new cabinets, counter, flooring, plumbing fixtures. | $50,000 |
| Mar 14, 2022 | Never finaled issued Mar 2022, no final | 90 Wawona St | minor changes to 1st fl foyer closet to reduce width. change door & add seating. minor changes to 2nd fl family room closet to remove a wetbar. widen closet, & change swinging door into pocket door. add a door to (e) opening between 2nd fl primary bedroom & bathroom.Details
minor changes to 1st fl foyer closet to reduce width. change door & add seating. minor changes to 2nd fl family room closet to remove a wetbar. widen closet, & change swinging door into pocket door. add a door to (e) opening between 2nd fl primary bedroom & bathroom. | $5,000 |
| Dec 15, 2021 | Completed final sign-off Mar 2023 | 360 Steiner St | in kind interior remodel of kitchen, bathrooms, no wall removal and alterationDetails
in kind interior remodel of kitchen, bathrooms, no wall removal and alteration | $10,000 |
| Nov 3, 2021 | Completed final sign-off Apr 2022 | 2642 40th Av | add an en-suite bathroom and closet to an (e) bedroom and replace the window with a new emergency egress compliant bay windowDetails
add an en-suite bathroom and closet to an (e) bedroom and replace the window with a new emergency egress compliant bay window | $30,000 |
| Aug 18, 2021 | Completed final sign-off Nov 2022 | 118 Brewster St | remodel (e) master bath, hall bath & powder room. convert (e) storage room into bedroom with en-suite bathroom.Details
remodel (e) master bath, hall bath & powder room. convert (e) storage room into bedroom with en-suite bathroom. | $60,000 |
| Apr 13, 2021 | Never finaled issued Apr 2021, no final | 170 King St | unit #201: kitchen and 2 bathrooms remodel in kind. replace cabinets, finishes, fixtures. no structural work or wall removal/openings.Details
unit #201: kitchen and 2 bathrooms remodel in kind. replace cabinets, finishes, fixtures. no structural work or wall removal/openings. | $110,000 |
| Mar 17, 2021 | Completed final sign-off Feb 2023 | 2272 17th Av | expand kitchen & breakfast room into (e) lightwell at 2nd fl & remodel. remodel half bath & full bath. replace windows in kind with double glazed custom wood windows or marvin clad exterior + wood interior windows.Details
expand kitchen & breakfast room into (e) lightwell at 2nd fl & remodel. remodel half bath & full bath. replace windows in kind with double glazed custom wood windows or marvin clad exterior + wood interior windows. | $200,000 |
| Mar 1, 2021 | Never finaled issued Mar 2021, no final | 1696 09th Av | in kind bathroom remodel: the remodel of (2) existing (e) bathrooms. replacement of cabinets, finishes, fixtures with in-kind like materials; no removal of wallsDetails
in kind bathroom remodel: the remodel of (2) existing (e) bathrooms. replacement of cabinets, finishes, fixtures with in-kind like materials; no removal of walls | $60,000 |
| Dec 21, 2020 | Completed final sign-off Jul 2021 | 743 04th Av | add new office & new bathroom at ground floor only. ref pa# 202005127422.Details
add new office & new bathroom at ground floor only. ref pa# 202005127422. | |
| Nov 3, 2020 | Completed final sign-off Jun 2021 | 21 Nahua Av | renovate (e) den at ground fl. add (n) bathroom within existing building envelope at ground fl. replace (e) garage door with 20-min fire rated door.Details
renovate (e) den at ground fl. add (n) bathroom within existing building envelope at ground fl. replace (e) garage door with 20-min fire rated door. | $50,000 |
| May 12, 2020 | Completed final sign-off Feb 2021 | 354 Moultrie St | remodeling of (e) kitchen, enclose portion of light well at 2/f to enlarge and convert (e) 1/2 bathroom to full bathroom, convert breakfast room and study into office.Details
remodeling of (e) kitchen, enclose portion of light well at 2/f to enlarge and convert (e) 1/2 bathroom to full bathroom, convert breakfast room and study into office. | $75,000 |
| Oct 24, 2019 | Completed final sign-off Aug 2020 | 483 Molimo Dr | replace 9 windows w/ new of like kind (marvin ultimate clad) at front and back of house. replace in-kind, alum wood clad. remodel and kitchen and powder room at main level and bathroom at 2nd level. new finishes and fixtures of like kind to existing.Details
replace 9 windows w/ new of like kind (marvin ultimate clad) at front and back of house. replace in-kind, alum wood clad. remodel and kitchen and powder room at main level and bathroom at 2nd level. new finishes and fixtures of like kind to existing. | $35,000 |
| Sep 13, 2019 | Completed final sign-off Dec 2019 | 71 Garcia Av | install new rear patio door - replace (e), like for like. make repairs to water damage at ceiling. relocate laundry from ground floor to 2nd floor bathroom closetDetails
install new rear patio door - replace (e), like for like. make repairs to water damage at ceiling. relocate laundry from ground floor to 2nd floor bathroom closet | $15,000 |
| Jun 19, 2019 | Completed final sign-off Jul 2020 | 760 Darien Wy | remodel master bedroom, bathroom and closet @ 1st level. replace 1 rear door and window, same size & configuration. perform voluntary seismic upgrade @ ground levelDetails
remodel master bedroom, bathroom and closet @ 1st level. replace 1 rear door and window, same size & configuration. perform voluntary seismic upgrade @ ground level | $50,000 |
| Jun 12, 2019 | Completed final sign-off Oct 2019 | 3236 Broderick St | remodel 2 bathrooms at 1st floor. replace all finishes and fixtures in kind.Details
remodel 2 bathrooms at 1st floor. replace all finishes and fixtures in kind. | $15,000 |
| Jun 12, 2019 | Completed final sign-off Nov 2019 | 20 Agnon Av | remodel 1 bathrooms at 1st floor. replace all finishes and fixtures in kind.Details
remodel 1 bathrooms at 1st floor. replace all finishes and fixtures in kind. | $10,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 655 Hampshire St | remodel kitchen & bathroom. replce finishes & fixtures in-kind.Details
remodel kitchen & bathroom. replce finishes & fixtures in-kind. | $35,000 |
| Sep 4, 2018 | Completed final sign-off Aug 2019 | 174 Staples Av | remodel 2nd level bathroom-replace finishes and fixtures in like kind. renovate lower level - convert storage into 2 bedrooms, laundry, bath, relocate connecting stairDetails
remodel 2nd level bathroom-replace finishes and fixtures in like kind. renovate lower level - convert storage into 2 bedrooms, laundry, bath, relocate connecting stair | $150,000 |
| Jul 18, 2018 | Completed final sign-off Jun 2020 | 428 Gold Mine Dr | modify pa 2018-0425-7398 to include: dry rot repair and structural reinforcement to rear 1st story and spa deck. add bathtub to ground level bathroom, convert family room to bedroom. relocate fireplace at 1st fl. voluntary seismic improvements & replacement of non street facing windowDetails
modify pa 2018-0425-7398 to include: dry rot repair and structural reinforcement to rear 1st story and spa deck. add bathtub to ground level bathroom, convert family room to bedroom. relocate fireplace at 1st fl. voluntary seismic improvements & replacement of non street facing window | $15,000 |
| Apr 25, 2018 | Completed final sign-off Jun 2020 | 428 Gold Mine Dr | bathroom & kitchen remodel. replace all finishes & fixtures in-kind. new floors & wall finishes. no structural work or walls removed.Details
bathroom & kitchen remodel. replace all finishes & fixtures in-kind. new floors & wall finishes. no structural work or walls removed. | $38,837 |
| Nov 13, 2017 | Completed final sign-off Apr 2018 | 1500 Quesada Av | remodel existing bathroom - replace finishes & fixtures in like kind. add 1 new bathroom at master bedroom.Details
remodel existing bathroom - replace finishes & fixtures in like kind. add 1 new bathroom at master bedroom. | $80,000 |
| Oct 27, 2017 | Completed final sign-off Nov 2018 | 264 Yerba Buena Av | remodel home with replacement of finishes and fixtures in like kind; kitchen and 2 bathrooms & 3 bedrooms & main floor. repair dry rot at south wall (siding/trim) at rear yard.Details
remodel home with replacement of finishes and fixtures in like kind; kitchen and 2 bathrooms & 3 bedrooms & main floor. repair dry rot at south wall (siding/trim) at rear yard. | $100,000 |
| Jan 5, 2017 | Completed final sign-off Jan 2018 | 9 Massasoit St | remodel lower level bathroom - replace finishes and fixtures with like kind. one bathroom remodel. replace kitchen countersDetails
remodel lower level bathroom - replace finishes and fixtures with like kind. one bathroom remodel. replace kitchen counters | $15,000 |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 640 Davis St | unit 41: remodel (e) kitchen & bathroom, replace finish & fixtures in-like-kind; no walls added or removed. n/a maher ordinanceDetails
unit 41: remodel (e) kitchen & bathroom, replace finish & fixtures in-like-kind; no walls added or removed. n/a maher ordinance | $50,000 |
| Sep 26, 2016 | Completed final sign-off Jun 2017 | 862 47th Av | remodel existing bathroom, replace all finishes and fixtures in same location with like kind.Details
remodel existing bathroom, replace all finishes and fixtures in same location with like kind. | $15,000 |
| Sep 15, 2016 | Completed final sign-off Aug 2017 | 8 Juri St | remodel bathroom at ground level, replace all finishes and fixtures in like kind.Details
remodel bathroom at ground level, replace all finishes and fixtures in like kind. | $30,000 |
| May 31, 2016 | Completed final sign-off Oct 2016 | 4279 22nd St | remodel existing kitchen and bathroom, replace all finishes and fixtures in like kind.Details
remodel existing kitchen and bathroom, replace all finishes and fixtures in like kind. | $50,000 |
| Mar 24, 2016 | Completed final sign-off Oct 2016 | 334 11th Av | remodel kitchen and bathroom. replace all finishes and fixtures, in kind. replace aluminum windows with marvin ultimate aluminum-clad wood - 3 on front facade (casement-fixed-casement) and 11 on other facades (no non-original grid or mullion patterns)Details
remodel kitchen and bathroom. replace all finishes and fixtures, in kind. replace aluminum windows with marvin ultimate aluminum-clad wood - 3 on front facade (casement-fixed-casement) and 11 on other facades (no non-original grid or mullion patterns) | $80,000 |
| Dec 11, 2015 | Completed final sign-off Apr 2016 | 143 20th Av | remodel finishes of master bathroom in-kind. remodel finishes of hall bathroom in-kind. replace kitchen backsplash in-kind.Details
remodel finishes of master bathroom in-kind. remodel finishes of hall bathroom in-kind. replace kitchen backsplash in-kind. | $25,000 |
| Jun 18, 2015 | Completed final sign-off Feb 2016 | 197 Lower Tr | remodel kitchen & 2 bathrooms - replace all finishes and fixutres in-like kind.Details
remodel kitchen & 2 bathrooms - replace all finishes and fixutres in-like kind. | $50,000 |
| Jun 2, 2015 | Completed final sign-off Nov 2015 | 1950 10th Av | remodel (e) kitchen & bathroom in main living level of house. replace all finishes & fixtures in kind.Details
remodel (e) kitchen & bathroom in main living level of house. replace all finishes & fixtures in kind. | $50,000 |
| Dec 10, 2014 | Never finaled issued Dec 2014, no final | 1461 06th Av | remodel 2nd level bathroom. replace tub, toilet, lavatory finishes and fixtures with new in same kind. replace interior finishes, trim, casing, hardwood floors, stair tread and risers. replace 9 windows and 1 door with wood clad windows and doors. replace siding at front inside, replace frontDetails
remodel 2nd level bathroom. replace tub, toilet, lavatory finishes and fixtures with new in same kind. replace interior finishes, trim, casing, hardwood floors, stair tread and risers. replace 9 windows and 1 door with wood clad windows and doors. replace siding at front inside, replace front | $50,000 |
| Sep 30, 2014 | Completed final sign-off Jan 2015 | 690 Market St | unit #1404: replace countertop at kitchen and bathrooms. remove non bearing partition walls. add recess lights.Details
unit #1404: replace countertop at kitchen and bathrooms. remove non bearing partition walls. add recess lights. | $5,000 |
| Jan 27, 2014 | Completed final sign-off May 2014 | 1685 Oak St | unit 4: remodel one bathroom. replace existing fixtures and finishes in kind.Details
unit 4: remodel one bathroom. replace existing fixtures and finishes in kind. | $10,000 |
| Jan 27, 2014 | Completed final sign-off Sep 2014 | 360 Church St | unit k: remodel (1) kitchen - new fixtures, finishes, appliances; remodel (1) full bath - new fixtures and finishes; remodel (1) 1/2 bath - new fixtures and fixtures; replace guardrail at stair (42" high)Details
unit k: remodel (1) kitchen - new fixtures, finishes, appliances; remodel (1) full bath - new fixtures and finishes; remodel (1) 1/2 bath - new fixtures and fixtures; replace guardrail at stair (42" high) | $75,000 |
| Nov 14, 2013 | Completed final sign-off May 2014 | 520 06th St | unit 21 - remodel bathroom , master closet, and laundry; to comply with cec150(k) 10Details
unit 21 - remodel bathroom , master closet, and laundry; to comply with cec150(k) 10 | $30,000 |
| Aug 13, 2013 | Completed final sign-off Nov 2013 | 115 Santa Ana Av | kitchen remodel, replace all fixtures, finishes. bathroom remodel: replace all fixtures, finishes, lighting shall comply with title 24, family room, add lightingDetails
kitchen remodel, replace all fixtures, finishes. bathroom remodel: replace all fixtures, finishes, lighting shall comply with title 24, family room, add lighting | $50,000 |
| Jul 19, 2013 | Completed final sign-off Dec 2013 | 3911 19th St | remodel (2) bathrooms with new fixtures in (e) locations. install(6) recessed light fixtures in 2nd floor bedroom. no structuralDetails
remodel (2) bathrooms with new fixtures in (e) locations. install(6) recessed light fixtures in 2nd floor bedroom. no structural | $25,000 |
| Jun 24, 2013 | Completed final sign-off Aug 2013 | 700 Illinois St | remodel bathroom, fixtures, in (e) locations, no structural no alteration of partition wall.Details
remodel bathroom, fixtures, in (e) locations, no structural no alteration of partition wall. | $18,000 |
| Dec 24, 2012 | Completed final sign-off Jan 2013 | 128 Jersey St | bathroom remodel. enlarge bathroom by reducing closet.additonal work beyond permit 2012 1129 5114.Details
bathroom remodel. enlarge bathroom by reducing closet.additonal work beyond permit 2012 1129 5114. | |
| Nov 29, 2012 | Completed final sign-off Jan 2013 | 128 Jersey St | remodel hall bathroom, replace toilet, tub/shower, sink medicine cabinet, door, light fixtures, comply with t-24; move closet wallDetails
remodel hall bathroom, replace toilet, tub/shower, sink medicine cabinet, door, light fixtures, comply with t-24; move closet wall | $15,000 |
| Oct 29, 2012 | Completed final sign-off Aug 2013 | 152 Eureka St | remodel existing bathroom by replacing toilet sink, shower tile and wall finishes with material in kind. master bathroom.Details
remodel existing bathroom by replacing toilet sink, shower tile and wall finishes with material in kind. master bathroom. | $15,000 |
| Aug 30, 2012 | Completed final sign-off Nov 2012 | 3720 Broderick St | remodel (e) bathroom 2nd floor. replace plumbing fixtures in kind. re-tile shower stall, new shower pan. new shower valve. install combo exhaust fan. *no structural. * replace (2) wall sconces with (n) flourescent fixtures. remove bath tub - cap off. tile over.Details
remodel (e) bathroom 2nd floor. replace plumbing fixtures in kind. re-tile shower stall, new shower pan. new shower valve. install combo exhaust fan. *no structural. * replace (2) wall sconces with (n) flourescent fixtures. remove bath tub - cap off. tile over. | $27,000 |
| Jun 28, 2012 | Completed final sign-off Oct 2012 | 1536 08th Av | legalize & remodel existing bedroom/office , full bathroom & laundry room @ ground floor, make exterior repairs to fence & 18" fence wall at south rear property line, add 1/2" plywood to 1 side garage wall, bolt sill plate to foundation at 1 side garage wall & remodeled room 4' o.c. using 5/8" boltDetails
legalize & remodel existing bedroom/office , full bathroom & laundry room @ ground floor, make exterior repairs to fence & 18" fence wall at south rear property line, add 1/2" plywood to 1 side garage wall, bolt sill plate to foundation at 1 side garage wall & remodeled room 4' o.c. using 5/8" bolt | $60,000 |
| Apr 10, 2012 | Completed final sign-off Jul 2012 | 345 10th Av | remodel bathroom - remove tub and vanity. install new tub shower, pedestal sink and (e) toilet at (e) locations. install exhaust vent fan. no structural.Details
remodel bathroom - remove tub and vanity. install new tub shower, pedestal sink and (e) toilet at (e) locations. install exhaust vent fan. no structural. | $16,000 |
| Dec 20, 2011 | Expired or cancelled cancelled Jun 2016 | 3451 Jackson St | 1)renovate 4 bathrooms on 3/f. 2)add 5 new curb mounted skylights.3)add 3 new windows. 4)add wardrobe closets at bedroom #1 and master. 5) repair service stair. 6)add gas log lighter.7)plumbing, electrical and mechanical work as required.Details
1)renovate 4 bathrooms on 3/f. 2)add 5 new curb mounted skylights.3)add 3 new windows. 4)add wardrobe closets at bedroom #1 and master. 5) repair service stair. 6)add gas log lighter.7)plumbing, electrical and mechanical work as required. | $55,000 |
| Dec 6, 2011 | Completed final sign-off Jul 2012 | 319 Montcalm St | interior remodel of (e) 2nd level bedroom & bathroom creating 2 bedrooms where there was 1, add 1 shear wall at the 2nd level, replace 2/f window sash in kind.Details
interior remodel of (e) 2nd level bedroom & bathroom creating 2 bedrooms where there was 1, add 1 shear wall at the 2nd level, replace 2/f window sash in kind. | $55,000 |
| Sep 14, 2011 | Completed final sign-off Feb 2012 | 1594 16th Av | interior remodel to create a new bathroom & renovate (e) family room. new furnace & water heater. exterior dry rot repairs & paintingDetails
interior remodel to create a new bathroom & renovate (e) family room. new furnace & water heater. exterior dry rot repairs & painting | $75,000 |
| Sep 2, 2011 | Completed final sign-off Dec 2011 | 150 Lombard St | repair bathroom & new vanity, new floor tile, new toilet, sink, all replaced in kind. add 1 gfci outlet, replace light fixtures, install engineer hardwood in entry to living room. no structural wor, no walls relocation, no new lighting.Details
repair bathroom & new vanity, new floor tile, new toilet, sink, all replaced in kind. add 1 gfci outlet, replace light fixtures, install engineer hardwood in entry to living room. no structural wor, no walls relocation, no new lighting. | $15,000 |
| Jul 7, 2011 | Completed final sign-off Sep 2011 | 734 45th Av | replace cabinets, counter, bar sink in entertainment room, replace existing rear lower level window, all in kind material and location. replace finishes + fixtures in lower level bath to include tub/vanity, sink, toilet, faucet, tile all in kind. u factor: 0.4 max. lighting changes comply cec 150(k)Details
replace cabinets, counter, bar sink in entertainment room, replace existing rear lower level window, all in kind material and location. replace finishes + fixtures in lower level bath to include tub/vanity, sink, toilet, faucet, tile all in kind. u factor: 0.4 max. lighting changes comply cec 150(k) | $20,000 |
| Apr 5, 2011 | Completed final sign-off Sep 2011 | 111 30th Av | master bath- replace toilet, tub, vanity, sink, toilet, shower controls, add tile on walls, replace tile @ shower and floor, upgrade electric to code, add exhaust fan powder room- replace faucet and toiletDetails
master bath- replace toilet, tub, vanity, sink, toilet, shower controls, add tile on walls, replace tile @ shower and floor, upgrade electric to code, add exhaust fan powder room- replace faucet and toilet | $44,000 |
| Feb 28, 2011 | Completed final sign-off Jun 2011 | 131 Molimo Dr | remodel 2 baths in kind. no change wall, window, doors. voluantary seismic improvement to garage area as described below. not adding any habitable space to garage, one 4x8-1/2" plywood sheet nailed 6edge x12 field at center west wall of garage, 1/2 between garage door and entry door.Details
remodel 2 baths in kind. no change wall, window, doors. voluantary seismic improvement to garage area as described below. not adding any habitable space to garage, one 4x8-1/2" plywood sheet nailed 6edge x12 field at center west wall of garage, 1/2 between garage door and entry door. | $30,000 |
| Feb 28, 2011 | Completed final sign-off Apr 2011 | 3425 16th St | remodel 1 bath in kind and replace 2 existing sky lights in kind in bath. lighting to comply with cec 150k. no change to window, wall & door. all work in kind.Details
remodel 1 bath in kind and replace 2 existing sky lights in kind in bath. lighting to comply with cec 150k. no change to window, wall & door. all work in kind. | $15,000 |
| Jun 24, 2010 | Completed final sign-off Sep 2010 | 356 Winding Wy | remove rear windows, repair dry rot, reinstall windows. remove 2 side windowa at bath and bedroom. repair dryrot,install 2 new construction windows in (e) openings, no structural work. all work in (e) openings.Details
remove rear windows, repair dry rot, reinstall windows. remove 2 side windowa at bath and bedroom. repair dryrot,install 2 new construction windows in (e) openings, no structural work. all work in (e) openings. | $10,000 |
| Jun 1, 2010 | Completed final sign-off Nov 2010 | 398 Eureka St | 1)remve and replace kitchen countertops and bath vanity 2)install awood flooring on ground floor.3)refinish extg hardwood floors. 4)furr walls in lower bedroom for flush sheetrock insall. 5)elect:add utlet in closet, add 3-way switch at stairs. no structural work.Details
1)remve and replace kitchen countertops and bath vanity 2)install awood flooring on ground floor.3)refinish extg hardwood floors. 4)furr walls in lower bedroom for flush sheetrock insall. 5)elect:add utlet in closet, add 3-way switch at stairs. no structural work. | $25,000 |
| May 21, 2010 | Completed final sign-off Feb 2011 | 1351 31st Av | interior remodel of existing kitchen & baths. enclose atrium within bldg foot print. add laundry room at ground level. replace windows add stair near grade at rear of house.Details
interior remodel of existing kitchen & baths. enclose atrium within bldg foot print. add laundry room at ground level. replace windows add stair near grade at rear of house. | $140,000 |
| Dec 18, 2009 | Never finaled issued Jun 2010, no final | 952 Capp St | interior remodel of existing master bathroom at second floor. reconfigure existing walls to combine 2 room, and new relocated at 2nd floorDetails
interior remodel of existing master bathroom at second floor. reconfigure existing walls to combine 2 room, and new relocated at 2nd floor | $40,000 |
| Dec 7, 2009 | Completed final sign-off Apr 2010 | 369 Niagara Av | (1)kitchen:replace cabinets and countertops.install new sink same location. add 240 circuit for warming drawer. replace exist'g skylight with velux-no structural (2)bathroom: remove tub; build new shower pan and stall.relocate tub drain;relocate toilet waste line to comply w/code;no structuralDetails
(1)kitchen:replace cabinets and countertops.install new sink same location. add 240 circuit for warming drawer. replace exist'g skylight with velux-no structural (2)bathroom: remove tub; build new shower pan and stall.relocate tub drain;relocate toilet waste line to comply w/code;no structural | $54,000 |
| Sep 29, 2009 | Completed final sign-off Apr 2011 | 1345 Masonic Av | re-build existing sun porch at rear, add roof deck above. remodel kitchen & add 1/2 bath at garage level.Details
re-build existing sun porch at rear, add roof deck above. remodel kitchen & add 1/2 bath at garage level. | $125,000 |
| Aug 5, 2008 | Expired or cancelled expired Mar 2010 | 782 Bay St | expand scope of work to replace fire damage framing discovered during demolition. repair in kind outside corner of bathroom from inside. minor repair to exterior post at rear stairs due to dryrot. revision to permit app#200805272943.Details
expand scope of work to replace fire damage framing discovered during demolition. repair in kind outside corner of bathroom from inside. minor repair to exterior post at rear stairs due to dryrot. revision to permit app#200805272943. | $7,500 |
| Jun 16, 2008 | Completed final sign-off Sep 2008 | 1050 Chestnut St | bathroom remodel replace in kind, toilet, sink, shower. no walls/doors/windows under this permit.Details
bathroom remodel replace in kind, toilet, sink, shower. no walls/doors/windows under this permit. | $15,000 |
| May 27, 2008 | Completed final sign-off Oct 2008 | 2048 Wawona St | replace in kind- damaged drywall. subfloor, hardwood flooring in downstairs bedroom/bath/family room. no structural. remodel downstairs bath.Details
replace in kind- damaged drywall. subfloor, hardwood flooring in downstairs bedroom/bath/family room. no structural. remodel downstairs bath. | $15,000 |
| May 27, 2008 | Expired or cancelled expired Mar 2010 | 782 Bay St | bathroom remodel-demo shower stall 1 cap off plumbing. replace bathtub. install shower mixer. repair furnace room ceiling in basement. no structural. lighting to remain.Details
bathroom remodel-demo shower stall 1 cap off plumbing. replace bathtub. install shower mixer. repair furnace room ceiling in basement. no structural. lighting to remain. | $15,000 |
| Jan 25, 2008 | Completed final sign-off Apr 2008 | 2200 16th Av | bathroom improvements and repairs to garage ceiling, re-grout, patch and paint, new light fixtures, ventilation fan, lighting to meet title 24. replace windows and exterior door (rear of house), replace (e) in kind. not visable from street. u factor less than 0.67.Details
bathroom improvements and repairs to garage ceiling, re-grout, patch and paint, new light fixtures, ventilation fan, lighting to meet title 24. replace windows and exterior door (rear of house), replace (e) in kind. not visable from street. u factor less than 0.67. | $10,247 |
| Nov 14, 2007 | Completed final sign-off Mar 2008 | 290 Santa Clara Av | 2 bathroom remodels in kind. master bath replace shower tub, toilet and lights. add occupancy sensor switches, retaile, hall bath. replace sink and retile, move mirror light to side sensor. both bathrooms.replace shower + tub controls. other plumbing/electrical change as needed during demo inspectiDetails
2 bathroom remodels in kind. master bath replace shower tub, toilet and lights. add occupancy sensor switches, retaile, hall bath. replace sink and retile, move mirror light to side sensor. both bathrooms.replace shower + tub controls. other plumbing/electrical change as needed during demo inspecti | $40,000 |
| May 10, 2007 | Never finaled issued May 2007, no final | 67 Cotter St | remodel 2 bathrooms. non structural. all work in kindDetails
remodel 2 bathrooms. non structural. all work in kind | $8,000 |
| Nov 1, 2006 | Expired or cancelled expired Aug 2010 | 219 Cumberland St | work on unit#5. bedroom window (1), bathroom window (1) sliding door window (1) . replace afforementhoned 3 windows, install flashing and threshold, repair stucco around windows.not visable from street in kind.Details
work on unit#5. bedroom window (1), bathroom window (1) sliding door window (1) . replace afforementhoned 3 windows, install flashing and threshold, repair stucco around windows.not visable from street in kind. | $9,362 |
| Jul 28, 2006 | Completed final sign-off Nov 2006 | 484 Day St | exploratory work in bathroom to determine source of water leak and resulting damage. repair dry rot & water leak. all work in kind.Details
exploratory work in bathroom to determine source of water leak and resulting damage. repair dry rot & water leak. all work in kind. | $3,750 |
| Jul 28, 2006 | Never finaled issued Jul 2006, no final | 2510 16th Av | repair stucco, dry rot, front steps, replace side yard gates. (front) 8' x 10'. remodel / repair bathroom. replace in kind. lighting all flouresent / occupancy control sensor. exhaust fan vent termination 3' from property line. (sfmc 504.5)Details
repair stucco, dry rot, front steps, replace side yard gates. (front) 8' x 10'. remodel / repair bathroom. replace in kind. lighting all flouresent / occupancy control sensor. exhaust fan vent termination 3' from property line. (sfmc 504.5) | $33,000 |
| Apr 17, 2006 | Completed final sign-off Aug 2006 | 714 Gates St | remodel bath in current footprint no changes to partitions or windowsDetails
remodel bath in current footprint no changes to partitions or windows | $11,500 |