Block 2749, lot 059
398 Eureka St
- City’s use
- Single Family Residential
- Built
- 2001
- Stories
- 3
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,477 sq ft
- Lot
- 1,863 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 13, 2017 | Completed final sign-off Sep 2017 | 398 Eureka St | Houseworks Enterprises Inc. | replace section of stucco at rear of houseDetails
replace section of stucco at rear of house | $5,000 |
| Apr 10, 2012 | Completed final sign-off Jul 2012 | 398 Eureka St | Houseworks Enterprises Inc. | repair dry rot - replace in kind 2x6 jack stud, bottom plate, sheathing at corner between 1st floor and 2nd floor balcony. apply flashing, building paper. patch stucco to match.Details
repair dry rot - replace in kind 2x6 jack stud, bottom plate, sheathing at corner between 1st floor and 2nd floor balcony. apply flashing, building paper. patch stucco to match. | $5,000 |
| Jun 4, 2010 | Completed final sign-off Nov 2010 | 398 Eureka St | Houseworks Enterprises Inc. | rev. to pa# 2010.06.01.2010 ( no plans) . install pocket door at laundry room at 2nd floor. install door from master bedroom to catwalk at 3rd floor.Details
rev. to pa# 2010.06.01.2010 ( no plans) . install pocket door at laundry room at 2nd floor. install door from master bedroom to catwalk at 3rd floor. | $3,500 |
| Jun 1, 2010 | Completed final sign-off Nov 2010 | 398 Eureka St | Houseworks Enterprises Inc. | 1)remve and replace kitchen countertops and bath vanity 2)install awood flooring on ground floor.3)refinish extg hardwood floors. 4)furr walls in lower bedroom for flush sheetrock insall. 5)elect:add utlet in closet, add 3-way switch at stairs. no structural work.Details
1)remve and replace kitchen countertops and bath vanity 2)install awood flooring on ground floor.3)refinish extg hardwood floors. 4)furr walls in lower bedroom for flush sheetrock insall. 5)elect:add utlet in closet, add 3-way switch at stairs. no structural work. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Houseworks Enterprises Inc. (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.