Back to kitchen remodel contractors
House To Home Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jun 2026
- Last 24 months
- 1 permit filed
167 permits since 2000: 138 completed, 10 never finaled, 19 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
43 kitchen remodel permits: 36 completed, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 19, 2020 | Completed final sign-off Mar 2021 | 175 Francisco St | 3rd floor: 5ft interior wall removal between kitchen and dining area wall infill between kitchen and foyerDetails
3rd floor: 5ft interior wall removal between kitchen and dining area wall infill between kitchen and foyer | $20,000 |
| Jan 16, 2020 | Completed final sign-off Mar 2021 | 175 Francisco St | unit 18: remodel kitchen & 3 bathrooms. new appliances & fixtures. refinish existing flooring & install new carpet. paint throughout. no structural workDetails
unit 18: remodel kitchen & 3 bathrooms. new appliances & fixtures. refinish existing flooring & install new carpet. paint throughout. no structural work | $95,000 |
| Jun 25, 2019 | Completed final sign-off Jun 2020 | 490 Guerrero St | unit 4: remodel kitchen, bathroom & laundry closet, install new cabinets, counter top, appliances, r-13 installed in open walls, r-19 in all open ceiling, no structural work, remove sheetrock for electrical lighting.Details
unit 4: remodel kitchen, bathroom & laundry closet, install new cabinets, counter top, appliances, r-13 installed in open walls, r-19 in all open ceiling, no structural work, remove sheetrock for electrical lighting. | $40,000 |
| Dec 18, 2018 | Completed final sign-off May 2019 | 490 Guerrero St | unit#6 remodel kitchen, bathroom & laundry, closet, new lighting, install new cabinets, counter top & appliances. r-13 install open walls, r-19 in all open ceiling. no structural work. remove sheetrock for electrical light fixts.Details
unit#6 remodel kitchen, bathroom & laundry, closet, new lighting, install new cabinets, counter top & appliances. r-13 install open walls, r-19 in all open ceiling. no structural work. remove sheetrock for electrical light fixts. | $40,000 |
| Apr 13, 2018 | Never finaled issued Apr 2018, no final | 2430 47th Av | kitchen remodel - new cabinets, countertops, appliances, tile, and paint . no structural. work.Details
kitchen remodel - new cabinets, countertops, appliances, tile, and paint . no structural. work. | $30,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 490 Guerrero St | unit #3: kitchen & bath remodel with new lighting, painting & flooring. no structural changes. cabinets, countertops, laundry hook up and paint. in-kind remodel.Details
unit #3: kitchen & bath remodel with new lighting, painting & flooring. no structural changes. cabinets, countertops, laundry hook up and paint. in-kind remodel. | $85,000 |
| Oct 31, 2017 | Completed final sign-off May 2018 | 490 Guerrero St | unit #5: remodel kitchen and bathroom, laundry closet. new lighting, cabinets, countertops and appliances. r-13 in all open walls, r-19 inall open cabinets blown insulation in all plaster walls and ceilings. no structural workDetails
unit #5: remodel kitchen and bathroom, laundry closet. new lighting, cabinets, countertops and appliances. r-13 in all open walls, r-19 inall open cabinets blown insulation in all plaster walls and ceilings. no structural work | $70,000 |
| Sep 13, 2017 | Completed final sign-off Oct 2018 | 1457 Florida St | remodel kitchen: new cabinets, appliances,electrical.Details
remodel kitchen: new cabinets, appliances,electrical. | $20,000 |
| Mar 30, 2017 | Completed final sign-off May 2017 | 3100 Washington St | replace kitchen cabinets & countertops; retile tub surround; new vanity counter, sinks & faucets; provide new subpanel; no structural work; work to comply with title 24 lighting.Details
replace kitchen cabinets & countertops; retile tub surround; new vanity counter, sinks & faucets; provide new subpanel; no structural work; work to comply with title 24 lighting. | $25,000 |
| Aug 24, 2016 | Completed final sign-off Nov 2016 | 734 Arkansas St | kitchen remodel, new cabinets, countertop, & flooring; replace in-kind (2) existing skylights. no structural work.Details
kitchen remodel, new cabinets, countertop, & flooring; replace in-kind (2) existing skylights. no structural work. | $28,000 |
| Jul 8, 2016 | Completed final sign-off Apr 2017 | 142 Newman St | remove load bearing wall and remodel e kitchen of 2nd fl. provide new posts and beamsDetails
remove load bearing wall and remodel e kitchen of 2nd fl. provide new posts and beams | $30,000 |
| Mar 15, 2016 | Completed final sign-off May 2016 | 579 27th Av | apt 3: kitchen remodel: new cabs, counters, tile floor. sink connected to (e) supply and waste. lighting to meet current title 24. replace 2 toilets and 2 vanities connected to (e) supply and waste lines. all plumbing fixtures to be code compliance. no structural changes.Details
apt 3: kitchen remodel: new cabs, counters, tile floor. sink connected to (e) supply and waste. lighting to meet current title 24. replace 2 toilets and 2 vanities connected to (e) supply and waste lines. all plumbing fixtures to be code compliance. no structural changes. | $25,000 |
| Feb 26, 2015 | Completed final sign-off Jun 2015 | 363 Prospect Av | kitchen remodel - new cabinets, counters, lighting, flooring and appliances. no structural change. lighting to be title 24 compliant.Details
kitchen remodel - new cabinets, counters, lighting, flooring and appliances. no structural change. lighting to be title 24 compliant. | $75,000 |
| Jan 21, 2015 | Completed final sign-off Jul 2015 | 200 Bennington St | remodel kitchen, new led lighting throughout house, remodel laundry area, new windows inserted into (e) opening marvin integrity double hung with o.g. lugs to be compliant with planning code where visible from the street. no structural change 9 total all to be wood clad.Details
remodel kitchen, new led lighting throughout house, remodel laundry area, new windows inserted into (e) opening marvin integrity double hung with o.g. lugs to be compliant with planning code where visible from the street. no structural change 9 total all to be wood clad. | $95,000 |
| Aug 18, 2014 | Completed final sign-off Jan 2015 | 1980 Grant Av | #7- remodel of 1 kitchen, 1 bathroom & 1/2 bath, (e) exhaust fan to remain. provide new lighting and new hearth mantle to surround the 2 new gas insert to (e) fireplace, refinish floors, paint. lighting shall comply with cec 150(k)3 & 150(k)5. no structural work. no new wall & wall reloationDetails
#7- remodel of 1 kitchen, 1 bathroom & 1/2 bath, (e) exhaust fan to remain. provide new lighting and new hearth mantle to surround the 2 new gas insert to (e) fireplace, refinish floors, paint. lighting shall comply with cec 150(k)3 & 150(k)5. no structural work. no new wall & wall reloation | $180,000 |
| Mar 31, 2014 | Completed final sign-off Jul 2014 | 528 Hugo St | kitchen remodel, new cabinets, counter top, tile, backsplash, new circuits for kitchen. new appliances, no structural work. lighting to comply with cec 150(k),Details
kitchen remodel, new cabinets, counter top, tile, backsplash, new circuits for kitchen. new appliances, no structural work. lighting to comply with cec 150(k), | $30,000 |
| Jan 2, 2014 | Completed final sign-off Apr 2014 | 30 Albion St | remodel kitchen. site builcabinets, new counter tops, new flooring. no structural work. no change on walls.Details
remodel kitchen. site builcabinets, new counter tops, new flooring. no structural work. no change on walls. | $20,000 |
| Nov 20, 2013 | Completed final sign-off Jan 2014 | 1216 05th Av | unit a: kitchen remodel to repair fire damage new tile bath floor, no structural work, cabinets, counter tops, appliances, flooring, paint; no structural damage replace in kindDetails
unit a: kitchen remodel to repair fire damage new tile bath floor, no structural work, cabinets, counter tops, appliances, flooring, paint; no structural damage replace in kind | $20,000 |
| Oct 2, 2013 | Completed final sign-off Jan 2014 | 561 Rhode Island St | kitchen and laundry room remodel. new plumbing & electrical, new cabinets and counter tops, new lighting. replace rear door and windows (not visible from street) with fiberglass door and window into existing opening. insulate all open walls with r-13 ceiling with r-30 new on-demand water heater, newDetails
kitchen and laundry room remodel. new plumbing & electrical, new cabinets and counter tops, new lighting. replace rear door and windows (not visible from street) with fiberglass door and window into existing opening. insulate all open walls with r-13 ceiling with r-30 new on-demand water heater, new | $40,000 |
| Jul 2, 2013 | Expired or cancelled expired May 2017 | 237 22nd Av | 2nd floor-remodel kitchen & remove a portion of wall between kitchen & dining roomDetails
2nd floor-remodel kitchen & remove a portion of wall between kitchen & dining room | $13,000 |
| Mar 28, 2013 | Completed final sign-off May 2013 | 1327 42nd Av | kitchen remodel, plumbing upgrade kitchen & bath, electrical upgrade kitchen, 4 vinyl block frame windows not visible from the street, carper and paint throughout new cabinets, coutertops & appliances.Details
kitchen remodel, plumbing upgrade kitchen & bath, electrical upgrade kitchen, 4 vinyl block frame windows not visible from the street, carper and paint throughout new cabinets, coutertops & appliances. | $25,000 |
| Dec 13, 2012 | Completed final sign-off Aug 2013 | 1243 Masonic Av | remodel interior of unit kitchen upgrade, remodel extg bath, add new bath & upgrade gas furnace. replace three windows visible from street with matching marvin ultimate double hung. replace 12 windows not visible from street with symonton vinyl block frame. all egress required windows to meet code.Details
remodel interior of unit kitchen upgrade, remodel extg bath, add new bath & upgrade gas furnace. replace three windows visible from street with matching marvin ultimate double hung. replace 12 windows not visible from street with symonton vinyl block frame. all egress required windows to meet code. | $165,000 |
| Apr 13, 2012 | Completed final sign-off May 2012 | 775 Lawton St | kitchen remodel, cosmetic upgrade two bathrooms, replace aluminum windows with vinyl stucco fin, (7) total, replace two garage door openers, replace one garage door with sectional door. carpet and paint throughout. (n) lighting comply with cec 150(k). no structural work. no windows visible from.Details
kitchen remodel, cosmetic upgrade two bathrooms, replace aluminum windows with vinyl stucco fin, (7) total, replace two garage door openers, replace one garage door with sectional door. carpet and paint throughout. (n) lighting comply with cec 150(k). no structural work. no windows visible from. | $50,000 |
| Oct 20, 2010 | Completed final sign-off Jun 2011 | 623 35th Av | full kitchen remodel-moving interior walls to remodel powder room, new windows, changing door to window & window to door. remove rear (e) stairs. new exterior siding.Details
full kitchen remodel-moving interior walls to remodel powder room, new windows, changing door to window & window to door. remove rear (e) stairs. new exterior siding. | $60,000 |
| Nov 4, 2009 | Completed final sign-off Mar 2010 | 1050 North Point St | remodel master bath, new kitchen counters, new lighting new flooring. no structural changes. bathrooms have existing exhaust fan and will have occupancy sensors. provide height efficency lighting per t24.Details
remodel master bath, new kitchen counters, new lighting new flooring. no structural changes. bathrooms have existing exhaust fan and will have occupancy sensors. provide height efficency lighting per t24. | $75,000 |
| Oct 10, 2008 | Expired or cancelled expired Mar 2010 | 990 Bay St | #104 (2nd flr) & #203 (3rd flr) - change floor plan to convert dining rooms to bedrooms, remodel kitchens with new cabients, countertops & appliances. install new shower valves. no structural work required.Details
#104 (2nd flr) & #203 (3rd flr) - change floor plan to convert dining rooms to bedrooms, remodel kitchens with new cabients, countertops & appliances. install new shower valves. no structural work required. | $140,000 |
| Oct 10, 2008 | Expired or cancelled expired Mar 2010 | 990 Bay St | install new kitchen cabinets, counter tops, shower valve, kitchen sink, appliances, install new subpanel in unit. paint & misc repairs as require. min 50% of kitchen light wattage should be of h.e. lights. all h.e light in bathroom or controlled by t-24 0.5.Details
install new kitchen cabinets, counter tops, shower valve, kitchen sink, appliances, install new subpanel in unit. paint & misc repairs as require. min 50% of kitchen light wattage should be of h.e. lights. all h.e light in bathroom or controlled by t-24 0.5. | $70,000 |
| Aug 6, 2008 | Completed final sign-off Apr 2009 | 990 Bay St | apt 603: change floor plan to convert dining room to bedroom. remodel kitchen, combine living rm/dining rm, change shower valve, new cabinets and counters. no structural. all partition walls. bedroom window meets egress requirementsDetails
apt 603: change floor plan to convert dining room to bedroom. remodel kitchen, combine living rm/dining rm, change shower valve, new cabinets and counters. no structural. all partition walls. bedroom window meets egress requirements | $50,000 |
| Jul 30, 2008 | Completed final sign-off Apr 2009 | 990 Bay St | remodel apartment kitchens & change shower valve in shower, new cabinet, counters, & appliances (non structural) replacement in kindDetails
remodel apartment kitchens & change shower valve in shower, new cabinet, counters, & appliances (non structural) replacement in kind | $120,000 |
| Sep 14, 2007 | Completed final sign-off Nov 2007 | 12 Newton St | remodel kitchen: new cabinets, counters, (3) vinyl block frame windows in rear (not visible from street) hardwood floors paint. 50% lumers to be flourescent in kitchen. u-factor for windows max 0.67.Details
remodel kitchen: new cabinets, counters, (3) vinyl block frame windows in rear (not visible from street) hardwood floors paint. 50% lumers to be flourescent in kitchen. u-factor for windows max 0.67. | $50,000 |
| Apr 17, 2007 | Completed final sign-off Jul 2007 | 145 Laurel St | remodel 1 kitchen, new cabinets, flooring change light fixtuares refinish floors, paint and repair plaster.Details
remodel 1 kitchen, new cabinets, flooring change light fixtuares refinish floors, paint and repair plaster. | $50,000 |
| Oct 20, 2006 | Completed final sign-off Jan 2007 | 1330 Plymouth Av | remodel 1 kitchen-new cabinets & countertops new exhaust fan over stove. non structural.Details
remodel 1 kitchen-new cabinets & countertops new exhaust fan over stove. non structural. | $35,000 |
| Oct 20, 2006 | Completed final sign-off Jul 2007 | 145 Laurel St | remodel 1 kitchen and cosmetic upgrade to unit#10, paint floor finnish, repair (e) windows & doors. non structural work.Details
remodel 1 kitchen and cosmetic upgrade to unit#10, paint floor finnish, repair (e) windows & doors. non structural work. | $30,000 |
| Sep 11, 2006 | Never finaled issued Sep 2006, no final | 937 Scott St | replace kitchen window with new archtop window unit. no structural work. window restored to original size. not visible from the street. at rear.Details
replace kitchen window with new archtop window unit. no structural work. window restored to original size. not visible from the street. at rear. | $5,000 |
| Apr 28, 2006 | Completed final sign-off Jun 2006 | 18 Harper St | revise permit 200503097158 to eliminate installation of 2 windows in 18-b harper. scope of work to include plywood siding replacement in lightwell and install of kitchen window in 18-a harper window 5' from property line no structural changes.Details
revise permit 200503097158 to eliminate installation of 2 windows in 18-b harper. scope of work to include plywood siding replacement in lightwell and install of kitchen window in 18-a harper window 5' from property line no structural changes. | |
| Feb 2, 2006 | Completed final sign-off Sep 2006 | 425 Lyon St | remodel 2 bathrooms & kitchen, new doors (interior) and windows. sheetrock, paint, carpet & flooring. facade to remain intact. wood windows visible from street to be in kind replacement. windows to be replaced in kind or better. door to main entry to be in kind or better.Details
remodel 2 bathrooms & kitchen, new doors (interior) and windows. sheetrock, paint, carpet & flooring. facade to remain intact. wood windows visible from street to be in kind replacement. windows to be replaced in kind or better. door to main entry to be in kind or better. | $175,000 |
| Dec 2, 2005 | Completed final sign-off Sep 2006 | 937 Scott St | remodel 1 bathroom & 1 kitchen,add lighting in upstairs bedroom.no structural changes.no work visible from street or exterior.new cabinets,counters,plumbing & electrical upgrade.drywall,paint and tile,1 window in upstairs bathroom vinyl insert.not visible from street.u-factor .67Details
remodel 1 bathroom & 1 kitchen,add lighting in upstairs bedroom.no structural changes.no work visible from street or exterior.new cabinets,counters,plumbing & electrical upgrade.drywall,paint and tile,1 window in upstairs bathroom vinyl insert.not visible from street.u-factor .67 | $75,000 |
| Nov 9, 2005 | Completed final sign-off Mar 2006 | 145 Laurel St | remodel kitchen, new cabinets, countertops, appliances/refinish floors and paintDetails
remodel kitchen, new cabinets, countertops, appliances/refinish floors and paint | $32,000 |
| Sep 26, 2005 | Expired or cancelled expired Nov 2006 | 174 Pope St | remodel kitchen,new cntrtops,fl liting,kit sink,appliances,replc e window w/vinyl slider,replc e fr door with new outswing unit, repair dryrot at door,replace 2x6 deck on ex grade landing at rear door. no struc,not visible from street. less than 50% for deckDetails
remodel kitchen,new cntrtops,fl liting,kit sink,appliances,replc e window w/vinyl slider,replc e fr door with new outswing unit, repair dryrot at door,replace 2x6 deck on ex grade landing at rear door. no struc,not visible from street. less than 50% for deck | $20,000 |
| May 13, 2005 | Completed final sign-off Mar 2006 | 2735 22nd St | remodel two bathrooms, kitchen counters, 3 windows replaced w/vinyl, rescue window as req'd, no windDetails
remodel two bathrooms, kitchen counters, 3 windows replaced w/vinyl, rescue window as req'd, no wind | $65,000 |
| Dec 31, 2004 | Completed final sign-off Feb 2005 | 2836 Golden Gate Av | remodel kitchen, lighting fixtures.Details
remodel kitchen, lighting fixtures. | $21,000 |
| Jul 24, 2002 | Completed final sign-off Nov 2002 | 145 Laurel St | apt.#1- replace kitchen cabinets & countertop, new appliancesDetails
apt.#1- replace kitchen cabinets & countertop, new appliances | $30,000 |
| Aug 4, 2001 | Completed final sign-off Nov 2001 | 4239 24th St | cosmetic remodel kitchen, new cabinets, appliances, flooring & paint (no structural change)Details
cosmetic remodel kitchen, new cabinets, appliances, flooring & paint (no structural change) | $38,000 |