Back to kitchen remodel contractors
Horizon Building
- Based in
- San Ramon
- On San Francisco permits
- Jun 2009 to Apr 2016
- Last 24 months
- 0 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2014 | Completed final sign-off Jun 2015 | 3380 22nd St | remodel interior space of (e) residence incl (n) kitchen, remodel bathroom & replacing windows, (rear cottage)Details
remodel interior space of (e) residence incl (n) kitchen, remodel bathroom & replacing windows, (rear cottage) | $200,000 |
| Jun 27, 2013 | Completed final sign-off Jun 2014 | 437 Prentiss St | extg kitchen remodel, addition of new office laundry and full bath at ground floor. partial ground floor concrete slab replacement.Details
extg kitchen remodel, addition of new office laundry and full bath at ground floor. partial ground floor concrete slab replacement. | $100,000 |
| Oct 26, 2012 | Completed final sign-off Nov 2012 | 4145 Ocean Av | patch wall at ironing board, sister one floor joist, 4' of plumbing to shorten distance from boiler to sink, replace flooring in kitchenDetails
patch wall at ironing board, sister one floor joist, 4' of plumbing to shorten distance from boiler to sink, replace flooring in kitchen | $3,000 |
| May 24, 2010 | Completed final sign-off Dec 2010 | 227 Masonic Av | kitchen & bathrm remodel, gas line added for new oven & leave existing for gas dryer, breakers added for panel for kitchen & batht o code (bath fan added) redo plumbing for faucets, shower, tub, repl existing 2 window not visible from street, take away part of wall & garbage away, all works on 3rd fDetails
kitchen & bathrm remodel, gas line added for new oven & leave existing for gas dryer, breakers added for panel for kitchen & batht o code (bath fan added) redo plumbing for faucets, shower, tub, repl existing 2 window not visible from street, take away part of wall & garbage away, all works on 3rd f | $30,000 |
| Jun 3, 2009 | Completed final sign-off Jul 2009 | 3945 20th St | work on unit#4. new kitchen cabinet, new shower, toilet and sink. new updated electrical panel. add s lights (can light in kitchen) plumbing toilet + sink (bathroom). new tile floor + carpet.Details
work on unit#4. new kitchen cabinet, new shower, toilet and sink. new updated electrical panel. add s lights (can light in kitchen) plumbing toilet + sink (bathroom). new tile floor + carpet. | $26,000 |