Back to bathroom remodel contractors
Hoover Brindmore Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Feb 2026
- Last 24 months
- 2 permits filed
28 permits since 2000: 26 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 12 completed, 1 never finaled. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2024 | Completed final sign-off Jul 2026 | 1020 Union St | unit #8 - remodel (4) bathrooms and wet bars: remove all existing finishes. update any exposed plumbing and electrical as needed. correct any deficiencies. all new lighting to be title 24 complaint.Details
unit #8 - remodel (4) bathrooms and wet bars: remove all existing finishes. update any exposed plumbing and electrical as needed. correct any deficiencies. all new lighting to be title 24 complaint. | $200,000 |
| Mar 19, 2024 | Completed final sign-off Aug 2026 | 2539 32nd Av | comply with nov 202316224 kitchen and bath remodel upgade plumbingn and electrical, replace finishes (cabinets & countr tops) remove (e) wall between kitchen/dinning room and living room new windows and skylights (vinyl windows approved of front of house per cp)Details
comply with nov 202316224 kitchen and bath remodel upgade plumbingn and electrical, replace finishes (cabinets & countr tops) remove (e) wall between kitchen/dinning room and living room new windows and skylights (vinyl windows approved of front of house per cp) | $75,000 |
| Apr 11, 2022 | Completed final sign-off Nov 2022 | 630 Rhode Island St | 1 kitchen, 2 bathroom remodel: remove and replace (e) finishes, cabinets, countertops, tile and fixtures. update electrical and plumbing to meet code (all lighting to be title 24 compliant). replace (e) windows in 2nd floor (top--located in light well: not visible from street) shower with .. .Details
1 kitchen, 2 bathroom remodel: remove and replace (e) finishes, cabinets, countertops, tile and fixtures. update electrical and plumbing to meet code (all lighting to be title 24 compliant). replace (e) windows in 2nd floor (top--located in light well: not visible from street) shower with .. . | $150,000 |
| Aug 31, 2021 | Completed final sign-off Nov 2021 | 178 Hancock St | remove existing bathtub and surrounding tile, replace with shower includeing new 1 piece shower pan. replace e bath window with new tempered glass window.u-factor less than or equal to 0.30Details
remove existing bathtub and surrounding tile, replace with shower includeing new 1 piece shower pan. replace e bath window with new tempered glass window.u-factor less than or equal to 0.30 | $10,000 |
| Aug 5, 2019 | Completed final sign-off Dec 2019 | 935 14th St | kitchen remodel: remove/replace (e) cabinets, countertops, exhaust hod, insulate common wall in living room. retile shower in bathroom. remove (e) wood paneling & replace with 5/8" type x sheetrock. sand (e) flooring, paint walls.Details
kitchen remodel: remove/replace (e) cabinets, countertops, exhaust hod, insulate common wall in living room. retile shower in bathroom. remove (e) wood paneling & replace with 5/8" type x sheetrock. sand (e) flooring, paint walls. | $106,000 |
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 3550 Market St | bathroom remodel. remove and replace existing finishes. 6' x 12' approximately. no structural work or wall removal.Details
bathroom remodel. remove and replace existing finishes. 6' x 12' approximately. no structural work or wall removal. | $25,000 |
| Jun 28, 2018 | Completed final sign-off Nov 2018 | 1858 Grove St | remove and replace existing finishes in kitchen & bathroom including updated electrical and plumbing. new cabinetry, appliances, flooring, lighting. remodel in kind.Details
remove and replace existing finishes in kitchen & bathroom including updated electrical and plumbing. new cabinetry, appliances, flooring, lighting. remodel in kind. | $70,000 |
| Feb 9, 2018 | Completed final sign-off May 2018 | 555 11th Av | kitchen remodel-remove and replace (e) cabinets, counter tops, backsplash. install new stove, reuse (e) refrigerator and ishwasher. add new under cabinet lights. all lighting to be led. install new toilet and sink in bathroom.Details
kitchen remodel-remove and replace (e) cabinets, counter tops, backsplash. install new stove, reuse (e) refrigerator and ishwasher. add new under cabinet lights. all lighting to be led. install new toilet and sink in bathroom. | $50,000 |
| Dec 18, 2017 | Completed final sign-off Jul 2018 | 169 Putnam St | remodel (e) 2nd floor bathroom, replace toilet, vanity, tile, exhaust fan & update lighting to ledDetails
remodel (e) 2nd floor bathroom, replace toilet, vanity, tile, exhaust fan & update lighting to led | $75,000 |
| Dec 7, 2017 | Completed final sign-off Jul 2018 | 169 Putnam St | legalize & expand (e) main floor bathroom, all new plumbing & electrical, new sink, toilet and shower.Details
legalize & expand (e) main floor bathroom, all new plumbing & electrical, new sink, toilet and shower. | $25,000 |
| Nov 4, 2015 | Never finaled issued Nov 2015, no final | 34 Lundys Ln | remove kitchen/stove in order to permanently remove the in-law rental unit from housing use. bring habitable space on basement level up to code for habitability, legalize (e) bathroom to include removal of bath tub and "kitchen" sink.Details
remove kitchen/stove in order to permanently remove the in-law rental unit from housing use. bring habitable space on basement level up to code for habitability, legalize (e) bathroom to include removal of bath tub and "kitchen" sink. | $10,000 |
| Jun 10, 2014 | Completed final sign-off Sep 2014 | 127 Stillings Av | remodel 2 bathrooms; remove (e) fixtures and finishes down to framing - update mechanical, new insulation, drywall tile & finishes. to comply with cec150(k)10Details
remodel 2 bathrooms; remove (e) fixtures and finishes down to framing - update mechanical, new insulation, drywall tile & finishes. to comply with cec150(k)10 | $25,000 |
| May 14, 2014 | Completed final sign-off Jun 2014 | 634 Laguna St | apt a - bathroom remodel - remove bathtub; replace with shower with new vanity sinks and toilet, tile, new light fixtures; to comply with cec150(k) 10Details
apt a - bathroom remodel - remove bathtub; replace with shower with new vanity sinks and toilet, tile, new light fixtures; to comply with cec150(k) 10 | $15,000 |