Back to bathroom remodel contractors
Hong Lee Construction Co
- Based in
- South San Francisco
- On San Francisco permits
- Feb 2000 to Apr 2014
- Last 24 months
- 0 permits filed
32 permits since 2000: 21 completed, 1 never finaled, 10 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2014 | Completed final sign-off Jul 2014 | 65 Ora Wy | remodel one kitchen and one bathroom. replace in kind.Details
remodel one kitchen and one bathroom. replace in kind. | $18,000 |
| Sep 19, 2013 | Completed final sign-off Sep 2015 | 2650 40th Av | remodel 1 kitchen & 1 bathroom in top floor; no structural work; to comply with cec 150(k) 8 & 10. led lite in kitchen & bathroom, new kitchen fa connected to (e).Details
remodel 1 kitchen & 1 bathroom in top floor; no structural work; to comply with cec 150(k) 8 & 10. led lite in kitchen & bathroom, new kitchen fa connected to (e). | $16,000 |
| Dec 7, 2012 | Completed final sign-off Apr 2013 | 506 Molimo Dr | remodel 2 bathrooms on the 2nd floor. there will be no structural work doneDetails
remodel 2 bathrooms on the 2nd floor. there will be no structural work done | $20,000 |
| Oct 15, 2012 | Completed final sign-off Jun 2013 | 2170 28th Av | remodel one kitchen and one bathroom on 2nd floor. no strucural changes. lighting shall comply with title 24.Details
remodel one kitchen and one bathroom on 2nd floor. no strucural changes. lighting shall comply with title 24. | $10,000 |
| Feb 23, 2012 | Completed final sign-off May 2012 | 1455 Hyde St | remodel one kitchen and one bathroom. no windows, no doors, no wall, no ceiling work on this permit.Details
remodel one kitchen and one bathroom. no windows, no doors, no wall, no ceiling work on this permit. | $16,000 |
| Feb 10, 2012 | Expired or cancelled expired Jul 2025 | 835 Lombard St | remodel extg kitchen including replace kitchen window, counter with cabinet, flooring. remodel extg bath room including replace bath room window, repalce shower, sink and toilet. work stated only 2/10/12.Details
remodel extg kitchen including replace kitchen window, counter with cabinet, flooring. remodel extg bath room including replace bath room window, repalce shower, sink and toilet. work stated only 2/10/12. | $10,000 |
| Feb 2, 2012 | Completed final sign-off Jul 2012 | 1558 44th Av | install 1 hour fire rated wall to separate the proposed 2 bedrooms, storage area, laundry and full bath with tub on gr floor behind garageDetails
install 1 hour fire rated wall to separate the proposed 2 bedrooms, storage area, laundry and full bath with tub on gr floor behind garage | $25,000 |
| May 28, 2009 | Completed final sign-off Jul 2010 | 95 Crestmont Dr | remodel 2 bathroom on the 2nd floor. install new vanity, toilet, sink, shower, bathtub & tile. no structural change will be made.Details
remodel 2 bathroom on the 2nd floor. install new vanity, toilet, sink, shower, bathtub & tile. no structural change will be made. | $18,000 |
| Nov 29, 2005 | Completed final sign-off Mar 2006 | 257 Oak Park Dr | remodel 1 kitchen and 2 baths on main floor, change existing cabients and all appliances, change vanity sinks, and plumbing fixtures. no structural workDetails
remodel 1 kitchen and 2 baths on main floor, change existing cabients and all appliances, change vanity sinks, and plumbing fixtures. no structural work | $18,000 |
| Mar 3, 2000 | Expired or cancelled cancelled Dec 2001 | 2446 18th Av | add two new bedroom and one new bathroom at 2nd floor rearDetails
add two new bedroom and one new bathroom at 2nd floor rear | $31,000 |