Hong Chang Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Feb 2026
- Last 24 months
- 3 permits filed
60 permits since 2000: 53 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 28 completed, 2 never finaled. Typically 1 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 535 Guerrero St | remodel existing kitchen and bathroom in kind. kitchen approx 90 sq ft, bathroom approx 50 sq ft. remove wall plaster for bedroom (2 exterior walls) and insulate and recover with sheetrock. install eletric sub panel for the unit. 5/8" type x sheet rock in kitchen, bathroom and bedroom(2 ext.walls).Details
remodel existing kitchen and bathroom in kind. kitchen approx 90 sq ft, bathroom approx 50 sq ft. remove wall plaster for bedroom (2 exterior walls) and insulate and recover with sheetrock. install eletric sub panel for the unit. 5/8" type x sheet rock in kitchen, bathroom and bedroom(2 ext.walls). | $73,500 |
| Feb 27, 2026 | Completed final sign-off Jul 2026 | 539 Guerrero St | partial kitchen remodel in kind. 7' run of base cabinets with sink, faucet and countertop. replace range hood in kind. install new slow faucet for bathroom. install electrical sub panel for the unit.Details
partial kitchen remodel in kind. 7' run of base cabinets with sink, faucet and countertop. replace range hood in kind. install new slow faucet for bathroom. install electrical sub panel for the unit. | $11,500 |
| Mar 25, 2024 | Completed final sign-off Jul 2024 | 537 Guerrero St | remodel (1) kitchen, (2) bathrooms in the unit. upgrade electrical in kitchen and bathrooms. add electrical outlet in bedrooms. no removal of wallsDetails
remodel (1) kitchen, (2) bathrooms in the unit. upgrade electrical in kitchen and bathrooms. add electrical outlet in bedrooms. no removal of walls | $52,000 |
| Dec 18, 2023 | Completed final sign-off Mar 2024 | 448 12th Av | main bathroom remodeling, install new fan, light sink, tile. install new counter top, sink, faucet. add new 125 amp subpanel for the unit. add electrical receptacles for kitchen. relocate gas furnance in basement. new painting for entire unit.Details
main bathroom remodeling, install new fan, light sink, tile. install new counter top, sink, faucet. add new 125 amp subpanel for the unit. add electrical receptacles for kitchen. relocate gas furnance in basement. new painting for entire unit. | $42,500 |
| Jun 17, 2021 | Completed final sign-off Jan 2022 | 50 Morningside Dr | remodel (1) kitchen & 1 bathroom on 2/f. including plumbing & electrical.Details
remodel (1) kitchen & 1 bathroom on 2/f. including plumbing & electrical. | $35,000 |
| Feb 24, 2020 | Completed final sign-off Mar 2020 | 460 Brussels St | remodle kitchen, 1 full bathroom at second floor. comply with complaint # 202012331 and 202012341Details
remodle kitchen, 1 full bathroom at second floor. comply with complaint # 202012331 and 202012341 | $22,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2020 | 143 Gaven St | construct 2 bedroom, 2 full baths @ ground floor; relocate (e) kitchen, remodel (e) bath room. add 1 new bathroom and convert (e) dining room to bedroom @ 2nd flDetails
construct 2 bedroom, 2 full baths @ ground floor; relocate (e) kitchen, remodel (e) bath room. add 1 new bathroom and convert (e) dining room to bedroom @ 2nd fl | $135,000 |
| Mar 12, 2019 | Completed final sign-off Nov 2019 | 173 Ellington Av | construct 1 bedroom, 2 bathrooms, family room & media room @ ground floor; remodel (e) bathroom & add 1 new bath room @ 2nd floor; replace partial (e) foundation w/newDetails
construct 1 bedroom, 2 bathrooms, family room & media room @ ground floor; remodel (e) bathroom & add 1 new bath room @ 2nd floor; replace partial (e) foundation w/new | $89,000 |
| Oct 24, 2018 | Completed final sign-off Jan 2019 | 1998 Pacific Av | remove bathroom bath tub, washer machine, double sink, toilet, wall tile, floor tile. install new bath tub, washer machine, double vanity cabinet with sink, toilet, new floor tile, wall tile. 5 cieling lights & new painting. 6'x'10 = 60sf.Details
remove bathroom bath tub, washer machine, double sink, toilet, wall tile, floor tile. install new bath tub, washer machine, double vanity cabinet with sink, toilet, new floor tile, wall tile. 5 cieling lights & new painting. 6'x'10 = 60sf. | $14,500 |
| Mar 1, 2018 | Completed final sign-off Apr 2018 | 1801 Diamond St | remdel (e) 1 bathroom, shower, toilet, sink, install new shower, toilet, sink, new wall/floor tile, new exhaust ceiling fanDetails
remdel (e) 1 bathroom, shower, toilet, sink, install new shower, toilet, sink, new wall/floor tile, new exhaust ceiling fan | $9,500 |
| Dec 23, 2016 | Completed final sign-off May 2017 | 33 Lisbon St | alter (e) 2nd flr - remodel (e) kitchen, bathroom and dining room. remove walls between kitchen and dining rm and utility rm, add new bathroom . replace w/h & furnaceDetails
alter (e) 2nd flr - remodel (e) kitchen, bathroom and dining room. remove walls between kitchen and dining rm and utility rm, add new bathroom . replace w/h & furnace | $30,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 271 Moscow St | replace new floor tile and wall tiles in kitchen & 1 bathroom ; replace 2 new vinyl windows in back yard wall, install new hardwood floor for enitre house, painting entire house.Details
replace new floor tile and wall tiles in kitchen & 1 bathroom ; replace 2 new vinyl windows in back yard wall, install new hardwood floor for enitre house, painting entire house. | $17,500 |
| Aug 19, 2014 | Completed final sign-off Dec 2014 | 229 Saint Charles Av | 1. legalize bedroom, bath. construct one new bedroom and storage at ground floor. 2. construct new deck with staircase at rear of building. size approx. 15'x7'Details
1. legalize bedroom, bath. construct one new bedroom and storage at ground floor. 2. construct new deck with staircase at rear of building. size approx. 15'x7' | $32,000 |
| Oct 24, 2013 | Completed final sign-off Aug 2014 | 3625 Cabrillo St | revision to bpa#2013-0823-5142. reconfigure bathrooms, laundry room & bedroom at 2/f & 3/f. add 3 bedrooms, 2 bathrooms, & entertainment room at 1/f. replace (e) windows at front of building w/fiberglass clad. replace (e) foundation at rear & side of building. (n) electrical wall heater.Details
revision to bpa#2013-0823-5142. reconfigure bathrooms, laundry room & bedroom at 2/f & 3/f. add 3 bedrooms, 2 bathrooms, & entertainment room at 1/f. replace (e) windows at front of building w/fiberglass clad. replace (e) foundation at rear & side of building. (n) electrical wall heater. | $38,000 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 763 30th Av | add new 2 bedrooms, media room and bathroom at 1st floor. remodel extg laundry area at 1st floor.Details
add new 2 bedrooms, media room and bathroom at 1st floor. remodel extg laundry area at 1st floor. | $28,000 |
| Aug 23, 2013 | Never finaled issued Aug 2013, no final | 3623 Cabrillo St | reconfigure extg bathroom at 2nd floors per plan. remodel and relocate extg kitchen at 2nd and 3rd floor. new furnace and washer/dryer machine at 3rd floor. new master suite at 3rd floor. remodel extg bath at 3rd floor. replace extg window at rear and siding of bldg.Details
reconfigure extg bathroom at 2nd floors per plan. remodel and relocate extg kitchen at 2nd and 3rd floor. new furnace and washer/dryer machine at 3rd floor. new master suite at 3rd floor. remodel extg bath at 3rd floor. replace extg window at rear and siding of bldg. | $130,000 |
| Feb 20, 2013 | Completed final sign-off Jul 2013 | 408 Dellbrook Av | proposed construction of 1 new full bath on 1st floor and relocate existing furnace and water heaterDetails
proposed construction of 1 new full bath on 1st floor and relocate existing furnace and water heater | $10,000 |
| Sep 5, 2012 | Completed final sign-off Nov 2013 | 151 Everglade Dr | add new bedroom and family room at 1st floor. legalize (e) bathroom and laundry room at 1st floor. remodel (e) master bathroom & kitchen at 2nd floor. add new bathroom at 2nd floor as per plan. replace window thru house, replace front window w/wood window, repair stucco at side fo bldg approx 100 sfDetails
add new bedroom and family room at 1st floor. legalize (e) bathroom and laundry room at 1st floor. remodel (e) master bathroom & kitchen at 2nd floor. add new bathroom at 2nd floor as per plan. replace window thru house, replace front window w/wood window, repair stucco at side fo bldg approx 100 sf | $46,000 |
| Dec 14, 2011 | Completed final sign-off Aug 2012 | 137 Lakeview Av | remodel two bathrooms & one kitchen. remove (e) plaster at walls of two bedrms, living rm & dinning rm w/n) 5/8" sheetrock nailed w/6d cooler nails @6"o.c. at edges, install insulation. use 5/8" type x gyp bd at exterior wall. approx. 600 sf of wall area. no wall relocation.Details
remodel two bathrooms & one kitchen. remove (e) plaster at walls of two bedrms, living rm & dinning rm w/n) 5/8" sheetrock nailed w/6d cooler nails @6"o.c. at edges, install insulation. use 5/8" type x gyp bd at exterior wall. approx. 600 sf of wall area. no wall relocation. | $20,000 |
| Nov 1, 2010 | Completed final sign-off Mar 2011 | 60 Meadowbrook Dr | add new bedrooms, bathrooms, and storage at first floor.Details
add new bedrooms, bathrooms, and storage at first floor. | $45,000 |
| Jun 11, 2010 | Completed final sign-off Mar 2011 | 265 Peabody St | remodel existing bathroom, repl new floor, wall tile, replace bath tub sink toilet, replace existing alum with rear window 3 vinyl double glass windowDetails
remodel existing bathroom, repl new floor, wall tile, replace bath tub sink toilet, replace existing alum with rear window 3 vinyl double glass window | $4,000 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 2710 Webster St | install new cabinets in kitchen & counter top, install new wall tile & floor tile in bathroom, patch living room cracks & paint. no new lightingDetails
install new cabinets in kitchen & counter top, install new wall tile & floor tile in bathroom, patch living room cracks & paint. no new lighting | $9,964 |
| Jan 22, 2010 | Completed final sign-off May 2010 | 2223 42nd Av | legalize (e) master bedroom & bathroom at 1st floor (garage)Details
legalize (e) master bedroom & bathroom at 1st floor (garage) | $20,000 |
| Dec 31, 2009 | Completed final sign-off May 2010 | 63 Shawnee Av | add new bedrooms and baths at 1st floorDetails
add new bedrooms and baths at 1st floor | $48,000 |
| Sep 24, 2009 | Completed final sign-off Jan 2010 | 1250 33rd Av | upgrade (e) play room to bedroom w/full bathroom & construct staircase from 2nd floor to ground floor at rear of bldg. replace (e) siding w/new at rear of bldg.Details
upgrade (e) play room to bedroom w/full bathroom & construct staircase from 2nd floor to ground floor at rear of bldg. replace (e) siding w/new at rear of bldg. | $28,000 |
| Aug 27, 2009 | Completed final sign-off Nov 2009 | 1246 25th Av | remodel (e) bathroom & kitchen on second floor. add new half bath on second floor. legalize existing family room and bathroom on first floor. add 150 sq. ft. new family room at first floor. replace 4 rear windows at 1st and 2nd floors, and replace front window in-kind.Details
remodel (e) bathroom & kitchen on second floor. add new half bath on second floor. legalize existing family room and bathroom on first floor. add 150 sq. ft. new family room at first floor. replace 4 rear windows at 1st and 2nd floors, and replace front window in-kind. | $20,000 |
| May 21, 2009 | Completed final sign-off Aug 2009 | 801 Pacheco St | remodel existing kitchen & bathroom on second, add new bedroom & bathroom on first floor, replace all windows in kind.Details
remodel existing kitchen & bathroom on second, add new bedroom & bathroom on first floor, replace all windows in kind. | $30,000 |
| Oct 3, 2008 | Completed final sign-off Dec 2008 | 125 Christopher Dr | divided existing family room into a bedroom with sliding window & a family room; add a bath in existing storage room at ground floor.Details
divided existing family room into a bedroom with sliding window & a family room; add a bath in existing storage room at ground floor. | $15,000 |
| Aug 10, 2007 | Completed final sign-off Mar 2008 | 430 04th Av | add new bathroom at 2nd floor. convert existing bathroom into two bathrooms at 3rd floor.Details
add new bathroom at 2nd floor. convert existing bathroom into two bathrooms at 3rd floor. | $15,000 |
| May 21, 2007 | Completed final sign-off Aug 2007 | 1606 46th Av | revised pa# 200701121602-relocate door and revised bathsDetails
revised pa# 200701121602-relocate door and revised baths |