Back to kitchen remodel contractors
Homeworks Construction Service
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Apr 2026
- Last 24 months
- 2 permits filed
16 permits since 2000: 14 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2019 | Completed final sign-off Nov 2019 | 670 47th Av | to comply with nov #201918663, dated 1/31/2019, remodel kitchen & bathroom caused by water damageDetails
to comply with nov #201918663, dated 1/31/2019, remodel kitchen & bathroom caused by water damage | $30,000 |
| May 5, 2015 | Completed final sign-off Dec 2015 | 80 Seneca Av | 1)remove extg sheetrock/replace with nw and r-13 insulation. remodel kitchen, bathroom, & re-wire elect. lighting at 2nd flr. 2)construct 2 bedroom, one bathroom & laundry room at ground floor. 3)remove/replace extg footing with new and replace/repair partial extg exterior wall at rear of bldg.Details
1)remove extg sheetrock/replace with nw and r-13 insulation. remodel kitchen, bathroom, & re-wire elect. lighting at 2nd flr. 2)construct 2 bedroom, one bathroom & laundry room at ground floor. 3)remove/replace extg footing with new and replace/repair partial extg exterior wall at rear of bldg. | $52,000 |
| Aug 21, 2013 | Completed final sign-off Oct 2013 | 3621 Ulloa St | replace new kitchen cabinets and tileDetails
replace new kitchen cabinets and tile | $3,200 |
| Jan 8, 2013 | Completed final sign-off Apr 2013 | 811 Silliman St | 1) remodel extg bath room and relocate kitchen at second floor. 2)divide extg family room into 2 bed room. convert extg half bathroom into full bath room and constrict laundry room. all work at ground floor.Details
1) remodel extg bath room and relocate kitchen at second floor. 2)divide extg family room into 2 bed room. convert extg half bathroom into full bath room and constrict laundry room. all work at ground floor. | $66,742 |
| Dec 28, 2012 | Completed final sign-off Jan 2013 | 3139 Noriega St | replace the new cabinets in the kitchenDetails
replace the new cabinets in the kitchen | $800 |
| Jul 11, 2011 | Completed final sign-off May 2012 | 36 Forest View Dr | revision to pa# 2011-0225-0930-remodel (e) kitchen, remove partial interior wall, upgrade ceiling joists, re-construct interior staircase from 2nd floor to ground floor. relocate bathroom at ground floorDetails
revision to pa# 2011-0225-0930-remodel (e) kitchen, remove partial interior wall, upgrade ceiling joists, re-construct interior staircase from 2nd floor to ground floor. relocate bathroom at ground floor | $20,000 |