Back to kitchen remodel contractors
Home General Contractors
- Based in
- Fremont
- On San Francisco permits
- Dec 2007 to Aug 2018
- Last 24 months
- 0 permits filed
10 permits since 2000: 6 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 98 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2018 | Completed final sign-off Dec 2019 | 526 Garfield St | remodel kitchen, bathrooms, upgrade electric panel upgrade furnace/duct replace water heater, replace windows, alter room layout, reconfigure int stairs, relocate kitchen. porch infill move entry opening/gate to the right-2f remove deck railingDetails
remodel kitchen, bathrooms, upgrade electric panel upgrade furnace/duct replace water heater, replace windows, alter room layout, reconfigure int stairs, relocate kitchen. porch infill move entry opening/gate to the right-2f remove deck railing | $220,000 |
| Oct 6, 2016 | Completed final sign-off Mar 2017 | 43 San Jacinto Wy | convert room to bed, kitchen, and bathroom. remodel kitchen and hall bath at 4th floor. add windows.Details
convert room to bed, kitchen, and bathroom. remodel kitchen and hall bath at 4th floor. add windows. | $70,000 |
| Feb 25, 2016 | Completed final sign-off Dec 2016 | 1312 36th Av | remodel kitchen, rewire electric, replace windows,milgard wood windows with al clad. repair/replace front stairs, upgrade main panel, convert 1st flr space into bedroom/bath. relpace entry door, replace furnace.Details
remodel kitchen, rewire electric, replace windows,milgard wood windows with al clad. repair/replace front stairs, upgrade main panel, convert 1st flr space into bedroom/bath. relpace entry door, replace furnace. | $60,000 |
| Dec 14, 2007 | Expired or cancelled expired Sep 2008 | 231 Marietta Dr | replace kitchen cabinets, flooring and fixtures. replace kitchen, dining and front bedroom windows. change opening at wall between kitchen and living room. install railing around stair at kitchen and living room. replace kitchen ceiling fixtures. work to be performed on the 2nd floor only.Details
replace kitchen cabinets, flooring and fixtures. replace kitchen, dining and front bedroom windows. change opening at wall between kitchen and living room. install railing around stair at kitchen and living room. replace kitchen ceiling fixtures. work to be performed on the 2nd floor only. | $25,000 |