Back to kitchen remodel contractors
Home Enhancements
- Based in
- Oakley
- On San Francisco permits
- Jun 2007 to May 2014
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 2 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2014 | Completed final sign-off Oct 2014 | 102 Anderson St | remodel kitchen & bathroom, new header in kitchen, 4 new elect circuits, plumbing on separate permit, new cabinets, 12 recessed lights, 2 exhaust fans, sheetrock, trim & paint.Details
remodel kitchen & bathroom, new header in kitchen, 4 new elect circuits, plumbing on separate permit, new cabinets, 12 recessed lights, 2 exhaust fans, sheetrock, trim & paint. | $50,000 |
| Jul 11, 2012 | Completed final sign-off May 2013 | 11 Borica St | remodel kitchen and bath. 2 new skylights. 1 in kitchen and 1 in bath. replace bathroom window.Details
remodel kitchen and bath. 2 new skylights. 1 in kitchen and 1 in bath. replace bathroom window. | $45,000 |
| Feb 22, 2011 | Completed final sign-off Sep 2011 | 3131 Divisadero St | remodel (e) apt.: relocate kitchen, update elect., plumbing, insulation, no exterior modification. relocate bedroom.Details
remodel (e) apt.: relocate kitchen, update elect., plumbing, insulation, no exterior modification. relocate bedroom. | $20,000 |
| Jun 11, 2010 | Completed final sign-off Mar 2011 | 263 San Marcos Av | bathroom remodel (4) incl new cab & fixtures-orig locations, replacement (10) windows orig location, new hardwood flrs,new kitchen tile floor, paint exterior of bldg, no structural modifications, elec & plumbg under separate permitsDetails
bathroom remodel (4) incl new cab & fixtures-orig locations, replacement (10) windows orig location, new hardwood flrs,new kitchen tile floor, paint exterior of bldg, no structural modifications, elec & plumbg under separate permits | $100,000 |
| Dec 29, 2009 | Completed final sign-off Sep 2011 | 1777 Page St | kitchen remodel to include new cabinets & appliances, new windows at rear breakfast area. new skylight, new electrical in kitchen/breafast. new sink added to (e) 1/2 bath. new deck & stairat rear. new bay window added at rear.Details
kitchen remodel to include new cabinets & appliances, new windows at rear breakfast area. new skylight, new electrical in kitchen/breafast. new sink added to (e) 1/2 bath. new deck & stairat rear. new bay window added at rear. | $60,000 |
| Aug 1, 2008 | Completed final sign-off Nov 2008 | 78 Vicksburg St | remodel kitchen: demo cabinets, drywall, frame in new support beam, eliminate 1 windows & install 2 new windowsw/ab-009 , insulate walls, new drywall, new trim, new cabinets & counter, paint, install new appliances.Details
remodel kitchen: demo cabinets, drywall, frame in new support beam, eliminate 1 windows & install 2 new windowsw/ab-009 , insulate walls, new drywall, new trim, new cabinets & counter, paint, install new appliances. | $42,000 |
| Jun 9, 2008 | Completed final sign-off Sep 2008 | 1317 Church St | 2nd floor remodel kitchen including new cabinets, countertop, sink, appliance, hardwood floor, plumbing, electrical to current code, replcate door, remove window, modify (increase width) inside doorway. remove bearing wall & replace with beam. plumbing & electrical on separate permit.Details
2nd floor remodel kitchen including new cabinets, countertop, sink, appliance, hardwood floor, plumbing, electrical to current code, replcate door, remove window, modify (increase width) inside doorway. remove bearing wall & replace with beam. plumbing & electrical on separate permit. | $54,000 |
| Jun 14, 2007 | Completed final sign-off Nov 2007 | 3129 Divisadero St | kitchen remodel. new cabinets. hardwood floors. remove l & o. replace with new sheetrock. new lights. replace galv. plmg with copper r+r exterior window. 2 bath remodel r+r lath and plaster. replace with sir. new light. tile on floor and wallsDetails
kitchen remodel. new cabinets. hardwood floors. remove l & o. replace with new sheetrock. new lights. replace galv. plmg with copper r+r exterior window. 2 bath remodel r+r lath and plaster. replace with sir. new light. tile on floor and walls | $50,000 |