Back to kitchen remodel contractors
Ho Pronamic Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2021 to Jan 2026
- Last 24 months
- 4 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 7 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2025 | Completed final sign-off Jun 2026 | 224 Bosworth St | 1st fl - widen existing garage door opening; 2nd fl - relocated kitchen & dining room; 1 story horizontal expansion to created (1) bedroom; (1) full bathroom & (1) skylight; restore front facade to original look. removed stone veneerDetails
1st fl - widen existing garage door opening; 2nd fl - relocated kitchen & dining room; 1 story horizontal expansion to created (1) bedroom; (1) full bathroom & (1) skylight; restore front facade to original look. removed stone veneer | $125,000 |
| Sep 17, 2024 | Completed final sign-off Apr 2025 | 654 37th Av | upper unit: remodel one kitchen and one bathroom. replace 9 windows (2 are street facing windows). same size, same locations, max u-factor 0.30.Details
upper unit: remodel one kitchen and one bathroom. replace 9 windows (2 are street facing windows). same size, same locations, max u-factor 0.30. | $32,000 |
| Oct 1, 2021 | Completed final sign-off Jun 2026 | 63 Wood St | convert udu into adu to address 2021001666(enf) stemming from complaint#2021726. requires construction of a new 1-hr rated property line wall @ 1st flr between new unit 63a and adjacent attached property 57-59 wood st. also requires inspection of correction of (e) kitchen & bathrm.Details
convert udu into adu to address 2021001666(enf) stemming from complaint#2021726. requires construction of a new 1-hr rated property line wall @ 1st flr between new unit 63a and adjacent attached property 57-59 wood st. also requires inspection of correction of (e) kitchen & bathrm. | $35,000 |