Back to kitchen remodel contractors
Hmm's Gc Inc
- Based in
- Carmel Valley
- On San Francisco permits
- Oct 2010 to Aug 2024
- Last 24 months
- 0 permits filed
28 permits since 2000: 20 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2017 | Never finaled issued Aug 2017, no final | 455 27th St | remove tiles backsplash from kitchen & bedroom. remove cabinets from master bedroom, living room & dining room. replace w/ new cabinet & tile. no change to walls, doors or openings.Details
remove tiles backsplash from kitchen & bedroom. remove cabinets from master bedroom, living room & dining room. replace w/ new cabinet & tile. no change to walls, doors or openings. | $40,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 1801 Golden Gate Av | kitchen remodel, laundry room remodl, removal of the load bearing wall. maher naDetails
kitchen remodel, laundry room remodl, removal of the load bearing wall. maher na | $30,000 |
| Jul 15, 2014 | Completed final sign-off Aug 2014 | 61 Ford St | remove large non-tempered single pane window in kitchen, replace with new french doors (double paned tempered glass) same width.Details
remove large non-tempered single pane window in kitchen, replace with new french doors (double paned tempered glass) same width. | $8,000 |
| May 29, 2014 | Completed final sign-off Jan 2015 | 154 Julian Av | removing sheetrock in upstair bathroom & bedroom;, and downstairs bathroom and kitchen; update elec., plumbing and hvac unit. footprint stay the same, install insulation. to comply with cec150(k)8 & 10Details
removing sheetrock in upstair bathroom & bedroom;, and downstairs bathroom and kitchen; update elec., plumbing and hvac unit. footprint stay the same, install insulation. to comply with cec150(k)8 & 10 | $80,000 |
| Oct 7, 2010 | Completed final sign-off Feb 2011 | 222 Hermann St | interior kitchen & bath remodel. adding a bath, adding a shearwall, first floor onlyDetails
interior kitchen & bath remodel. adding a bath, adding a shearwall, first floor only | $80,000 |