Hing Yip Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Jan 2019
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2018 | Completed final sign-off Aug 2018 | 326 Juanita Wy | replace kitchen cabinets, counter tops, faucets, and light fixtures. upgrade electrical panel and plumbing pipes as needed.Details
replace kitchen cabinets, counter tops, faucets, and light fixtures. upgrade electrical panel and plumbing pipes as needed. | $7,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2018 | 1512 Kirkham St | add a study room, install insulation at exterior walls roof to create a study room. remodel kitchen and bath. replace interior damaged sheetrockDetails
add a study room, install insulation at exterior walls roof to create a study room. remodel kitchen and bath. replace interior damaged sheetrock | $20,000 |
| Jun 30, 2008 | Completed final sign-off Sep 2008 | 2946 22nd Av | 2nd floor: reconfigure and remodel.relocate kitchen to nookroom,add new bedroom,1 bath, remodel existing bath.install r-19 at garage ceiling,r-13 at wall between living space and new bedroom,(vif)1 hr fire protection between garage/e living space. termite repair at garage and rear deck per reportDetails
2nd floor: reconfigure and remodel.relocate kitchen to nookroom,add new bedroom,1 bath, remodel existing bath.install r-19 at garage ceiling,r-13 at wall between living space and new bedroom,(vif)1 hr fire protection between garage/e living space. termite repair at garage and rear deck per report | $30,000 |
| May 1, 2007 | Completed final sign-off Jul 2007 | 1275 14th Av | correction notice for app#200703227015. 1275-1277 14th ave. increase cost of construction to reflect actual cost of$40,000.00. additional work for increase is for remodeling of 2 kitchens, 2 bathrooms.Details
correction notice for app#200703227015. 1275-1277 14th ave. increase cost of construction to reflect actual cost of$40,000.00. additional work for increase is for remodeling of 2 kitchens, 2 bathrooms. | $40,000 |
| Feb 13, 2007 | Completed final sign-off Mar 2007 | 419 22nd Av | work @ unit# 421 only. replace 1 kitchen cabinet & 1 bathroom fixtures. no sturctural work. 1 kitchen & 1 bathroom remodel. no tile work in bathroom. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or occupant sensor.Details
work @ unit# 421 only. replace 1 kitchen cabinet & 1 bathroom fixtures. no sturctural work. 1 kitchen & 1 bathroom remodel. no tile work in bathroom. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or occupant sensor. | $11,500 |
| Jul 3, 2006 | Completed final sign-off Sep 2006 | 168 08th Av | remodel kitchen and bathroom at second floorDetails
remodel kitchen and bathroom at second floor | $11,000 |
| Jan 28, 2005 | Completed final sign-off May 2005 | 2434 16th Av | remodel kitchen and bath as per planDetails
remodel kitchen and bath as per plan | $8,000 |