Back to bathroom remodel contractors
Hildebrand Renovation
- Based in
- Mill Valley
- On San Francisco permits
- Mar 2000 to Jun 2022
- Last 24 months
- 0 permits filed
49 permits since 2000: 38 completed, 9 never finaled, 2 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 18 completed, 4 never finaled, 1 expired or cancelled. Typically 18 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2022 | Completed final sign-off Nov 2023 | 1486 44th Av | remodel and repair in place in-kind 1 kitchen, 2 baths, and 1 wet bar. replace rear windows inkind, remove and replace stairs to second level and failed beam in living /dinning.Details
remodel and repair in place in-kind 1 kitchen, 2 baths, and 1 wet bar. replace rear windows inkind, remove and replace stairs to second level and failed beam in living /dinning. | $75,000 |
| Jan 16, 2018 | Completed final sign-off Nov 2018 | 243 Downey St | add bathroom on top floor invluding tub/shower sink & toilet within (e) bld emvelope. no new structural work, ref 201509046240 & 201505277215Details
add bathroom on top floor invluding tub/shower sink & toilet within (e) bld emvelope. no new structural work, ref 201509046240 & 201505277215 | $15,000 |
| Sep 4, 2015 | Never finaled issued Sep 2015, no final | 243 Downey St | revision to existing pa 2015-0527-7215 - ground floor bath relocation and kitchen remodel; 2nd floor kitchen and bath remodel; basement floor - foundation renovation (e) bedroom area.Details
revision to existing pa 2015-0527-7215 - ground floor bath relocation and kitchen remodel; 2nd floor kitchen and bath remodel; basement floor - foundation renovation (e) bedroom area. | $95,000 |
| May 12, 2015 | Never finaled issued May 2015, no final | 3400 Laguna St | interior room remodel unit 248, 410 sf. remodel e bedroom, living rm, closet, elec, ceiling trim, bath fixtures, door, finshes, trim, paint. add k itchenette and appliances, sprinkler under separate permitDetails
interior room remodel unit 248, 410 sf. remodel e bedroom, living rm, closet, elec, ceiling trim, bath fixtures, door, finshes, trim, paint. add k itchenette and appliances, sprinkler under separate permit | $61,375 |
| Nov 5, 2014 | Completed final sign-off Mar 2015 | 3400 Laguna St | interior bath remodel room 410. remodel existing bath, replace plumbing/elec fixtures at existing bathroom. replace finishes at bedroom carpet lighting trim paint. no change to building egress exterior or areaDetails
interior bath remodel room 410. remodel existing bath, replace plumbing/elec fixtures at existing bathroom. replace finishes at bedroom carpet lighting trim paint. no change to building egress exterior or area | $17,000 |
| Oct 8, 2014 | Completed final sign-off Mar 2015 | 3400 Laguna St | #246- interior bedroom/bathroom remodel, remodel existing bedroom & bathroom, replace plumbing & electrical fixtures, hardware & finishes. no change to building egress, exterior or area. n/a ordinance #155-13.Details
#246- interior bedroom/bathroom remodel, remodel existing bedroom & bathroom, replace plumbing & electrical fixtures, hardware & finishes. no change to building egress, exterior or area. n/a ordinance #155-13. | $17,000 |
| Jul 24, 2014 | Completed final sign-off Mar 2015 | 3400 Laguna St | room 408 remodel and bathroom remodel. maher n/a.Details
room 408 remodel and bathroom remodel. maher n/a. | $17,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | #223- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft.Details
#223- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft. | $15,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | #231- interior bathroom & wet bar remodel, replace fixtures and renovate finishes at wet bar, install bench & glass shower surround @ existing bath. 445 sq.ft.Details
#231- interior bathroom & wet bar remodel, replace fixtures and renovate finishes at wet bar, install bench & glass shower surround @ existing bath. 445 sq.ft. | $20,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | #219- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft.Details
#219- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft. | $15,000 |
| Feb 11, 2013 | Completed final sign-off Apr 2013 | 1935 Jackson St | batrhoom remodel replace in kind, bathroom fixtures & electriacl misc. non structural framing for blocking etc. replace 1 window & bath fanDetails
batrhoom remodel replace in kind, bathroom fixtures & electriacl misc. non structural framing for blocking etc. replace 1 window & bath fan | $10,000 |
| Sep 28, 2012 | Completed final sign-off Aug 2014 | 2258 Beach St | replace in (e) opening, in kind; to comply with complaint #201266141. 2 windows on property line "fire-rated", 3 doors, 5 windows at rear of building. repair/replace dry rot "non-structural" and replace stucco at repair locations. remodel kitchen and 2 baths with fixtures in place, in-kind.Details
replace in (e) opening, in kind; to comply with complaint #201266141. 2 windows on property line "fire-rated", 3 doors, 5 windows at rear of building. repair/replace dry rot "non-structural" and replace stucco at repair locations. remodel kitchen and 2 baths with fixtures in place, in-kind. | $150,000 |
| Sep 27, 2012 | Completed final sign-off Dec 2012 | 3400 Laguna St | 3rd floor-join adjacent rooms #304 & 305-convert 1 bathroom into a wet bar. provide misc plumbing, electrical, trim, paint & carpetDetails
3rd floor-join adjacent rooms #304 & 305-convert 1 bathroom into a wet bar. provide misc plumbing, electrical, trim, paint & carpet | $17,000 |
| Aug 21, 2012 | Completed final sign-off Dec 2012 | 3400 Laguna St | units #121/220/240/307/418-interior bathroom remodel to 5 existing apartment bathrooms. new carpet, trim and paint.Details
units #121/220/240/307/418-interior bathroom remodel to 5 existing apartment bathrooms. new carpet, trim and paint. | $100,000 |
| Jun 27, 2012 | Never finaled issued Dec 2012, no final | 1536 Francisco St | existing 2 family residential add one 1-br apt on ground floor, add one addl bath to each existing units, add elevator, add required sprinkler system, renovate existing kitchens & baths.Details
existing 2 family residential add one 1-br apt on ground floor, add one addl bath to each existing units, add elevator, add required sprinkler system, renovate existing kitchens & baths. | |
| Jun 27, 2012 | Never finaled issued Dec 2012, no final | 1530 Francisco St | renovate kitchens, baths, provide new rec/meeting room and 1/2 bath at garage level. skylight at light well and add bridge for access to elevator in adjacent bldg. 1536/8 francisco. add required sprinkler system on separate permit.Details
renovate kitchens, baths, provide new rec/meeting room and 1/2 bath at garage level. skylight at light well and add bridge for access to elevator in adjacent bldg. 1536/8 francisco. add required sprinkler system on separate permit. | $250,000 |
| Apr 24, 2012 | Expired or cancelled expired Aug 2014 | 2258 Beach St | renovate kitchen and baths in place in kind. no exterior work and no structural work. new cabinetry, new finishes, new fixtures. no change on walls and openingsDetails
renovate kitchen and baths in place in kind. no exterior work and no structural work. new cabinetry, new finishes, new fixtures. no change on walls and openings | $65,000 |
| Feb 6, 2012 | Completed final sign-off Apr 2012 | 3400 Laguna St | renovate unit 331 with bathroom remodeling & wet bar. renovate unit 421 perry bldg with bathroom remodel.Details
renovate unit 331 with bathroom remodeling & wet bar. renovate unit 421 perry bldg with bathroom remodel. | $62,000 |
| Jul 28, 2011 | Completed final sign-off Sep 2011 | 3400 Laguna St | unit 247 on 2nd floor: remodel bathroom, misc. electrical, trim paint. unit 330: remodel bath, add wet bar ( no cooking), misc. electrical, trim , paintDetails
unit 247 on 2nd floor: remodel bathroom, misc. electrical, trim paint. unit 330: remodel bath, add wet bar ( no cooking), misc. electrical, trim , paint | $92,000 |
| May 10, 2011 | Completed final sign-off Aug 2011 | 3400 Laguna St | combine units 302 & 303 to 1 unit, renovate the bathroom and add new bar type kitchen with no cooking facility. combine units 402 & 403 to 1 unit,renovate the bathrm and add new bar type kitchen w/ no cooking facility. unit 206 bathroom renovation. fire life safety on separate permit.Details
combine units 302 & 303 to 1 unit, renovate the bathroom and add new bar type kitchen with no cooking facility. combine units 402 & 403 to 1 unit,renovate the bathrm and add new bar type kitchen w/ no cooking facility. unit 206 bathroom renovation. fire life safety on separate permit. | $78,000 |
| Oct 15, 2010 | Completed final sign-off Feb 2011 | 3400 Laguna St | reno to units # 310/311: new bath, bar area (no subject to dwelling unit merger per planning motion# m-10738) unit# 237 : new bath, bar area. unit# 328 new bath, bar area.Details
reno to units # 310/311: new bath, bar area (no subject to dwelling unit merger per planning motion# m-10738) unit# 237 : new bath, bar area. unit# 328 new bath, bar area. | $78,000 |
| May 18, 2006 | Completed final sign-off Aug 2006 | 1920 Lake St | remove and replace plumbing and electrical fixtures in (2) bthrooms. remove and replace tile where necessary in bathrooms. non structural work.Details
remove and replace plumbing and electrical fixtures in (2) bthrooms. remove and replace tile where necessary in bathrooms. non structural work. | $30,000 |
| Mar 23, 2000 | Completed final sign-off Jul 2000 | 2619 Baker St | remodel bath,repair dryrot in wall & windows,install insulation,sheetrock, new fixtures, tile, painDetails
remodel bath,repair dryrot in wall & windows,install insulation,sheetrock, new fixtures, tile, pain |