High Tech Construction
- Based in
- Oakland
- On San Francisco permits
- Dec 2010 to Nov 2013
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 243 days from filing to permit and 827 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2010 | Completed final sign-off Nov 2013 | 226 27th St | removal of (e) fire escape. installation of new open rear exit stair, and reconstruct front stairway with improvement in layout per code, reconstruct front wall of bldg.Details
removal of (e) fire escape. installation of new open rear exit stair, and reconstruct front stairway with improvement in layout per code, reconstruct front wall of bldg. | $12,807 |