High Q Construction Llc
- Based in
- Dublin
- On San Francisco permits
- Sep 2023 to Nov 2024
- Last 24 months
- 2 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 5 days from filing to permit and 552 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2023 | Completed final sign-off Mar 2025 | 190 08th St | fire restoration of 1-story building next to 9th street, restore part of roof/framing, sesmic retrofic. no ti; remain vacant, no fire sprinkler/fire alarm. exterior stairway to be restored with material/design to match existing.Details
fire restoration of 1-story building next to 9th street, restore part of roof/framing, sesmic retrofic. no ti; remain vacant, no fire sprinkler/fire alarm. exterior stairway to be restored with material/design to match existing. | $25,000 |