Back to kitchen remodel contractors
Her Construction
- Based in
- San Mateo
- On San Francisco permits
- Nov 2022 to Jul 2026
- Last 24 months
- 6 permits filed
7 permits since 2000: 5 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 in progress. Typically 696 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2022 | In progress issued Oct 2024 | 1816 Lake St | new concrete curbs @(e)driveway,(e)of(e)trench drain,(n)enlarged garage door,(n)mail slot @garage door,infill under(e)main fl w/(n) unconditioned space.replace(e)fireplace w/ gas applicance.remove(e)door @ foyer,enlarge opening(n)frech door @ foyer,(n)kitchen cabinetry.Details
new concrete curbs @(e)driveway,(e)of(e)trench drain,(n)enlarged garage door,(n)mail slot @garage door,infill under(e)main fl w/(n) unconditioned space.replace(e)fireplace w/ gas applicance.remove(e)door @ foyer,enlarge opening(n)frech door @ foyer,(n)kitchen cabinetry. | $200,000 |