Back to kitchen remodel contractors
Hengda Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to May 2026
- Last 24 months
- 9 permits filed
24 permits since 2000: 18 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 in progress. Typically 10 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2026 | Completed final sign-off Mar 2026 | 806 42nd Av | add a kitchenette on 1st fl. no exterior and structural alterations. add laundry in garage.Details
add a kitchenette on 1st fl. no exterior and structural alterations. add laundry in garage. | $25,000 |
| Oct 8, 2025 | Completed final sign-off Aug 2026 | 378 Ralston St | 1st fl: add media room, 1 full bath. 2nd fl: remodel kitchen and bath. add 1 full bath. infill at rear. reconfigure interior stairs. add 2 bedrooms to the 1st fl.Details
1st fl: add media room, 1 full bath. 2nd fl: remodel kitchen and bath. add 1 full bath. infill at rear. reconfigure interior stairs. add 2 bedrooms to the 1st fl. | $220,000 |
| Jun 18, 2025 | In progress issued Oct 2025 | 40 Howth St | convert (e) sfd 1/f into adu. demolish (e) 1/f and update floor plans to include concrete slab, framing, new windows & doors, electrical layout & fixtures, plumbing layout * fixtures, water heater, hvac system & dcutwork, kitchen & bathroom layouts, & interior finishes.Details
convert (e) sfd 1/f into adu. demolish (e) 1/f and update floor plans to include concrete slab, framing, new windows & doors, electrical layout & fixtures, plumbing layout * fixtures, water heater, hvac system & dcutwork, kitchen & bathroom layouts, & interior finishes. | $150,000 |
| Aug 13, 2024 | Completed final sign-off Feb 2025 | 1827 26th Av | 1st fl: add 2 bedroom & 1 full bath 2nd fl: remodel kitchen & bathroom add 1 full bath. infill lightwellDetails
1st fl: add 2 bedroom & 1 full bath 2nd fl: remodel kitchen & bathroom add 1 full bath. infill lightwell | $180,000 |
| Apr 11, 2023 | Completed final sign-off Feb 2024 | 9 Garfield St | 1st floor = add 2 bedrooms, 1 full bath and family 2nd floor = remodel kitchen and bathroom, add 1 bathDetails
1st floor = add 2 bedrooms, 1 full bath and family 2nd floor = remodel kitchen and bathroom, add 1 bath | $90,000 |
| Mar 27, 2023 | Completed final sign-off Feb 2025 | 9 Garfield St | demo inside drywall and bathroom, kitchen room, (no replacement of kitchen and barthroom under this permit), outside siding flooring. no new wall & room changes.Details
demo inside drywall and bathroom, kitchen room, (no replacement of kitchen and barthroom under this permit), outside siding flooring. no new wall & room changes. | $3,000 |
| Jun 14, 2021 | Completed final sign-off Aug 2021 | 660 Bay St | 660 a - remodel 1 bathroom, change toilet and sink. install toilet, fix drain pipe and remodel 1 kitchen. change cabinet and fix electrical wire and drainDetails
660 a - remodel 1 bathroom, change toilet and sink. install toilet, fix drain pipe and remodel 1 kitchen. change cabinet and fix electrical wire and drain | $15,000 |
| Jun 5, 2020 | Completed final sign-off Feb 2021 | 2463 34th Av | 1st floor: add 2 new bedrooms, 2 new bathrooms, replace and relocate existing tank water heater and furnace. 2nd floor: add 1 new bathroom, remodel existing bathroom, relocate kitchen and add a new spiral stair to downstairs.Details
1st floor: add 2 new bedrooms, 2 new bathrooms, replace and relocate existing tank water heater and furnace. 2nd floor: add 1 new bathroom, remodel existing bathroom, relocate kitchen and add a new spiral stair to downstairs. | $80,000 |
| Mar 23, 2017 | Completed final sign-off Jun 2017 | 505 Sanchez St | install subpanel for kitchen, gfi outlets, cabintet countertop, flooring, sink, dishwasher, stove, ; bathroom, sink, apinting , ceiling light.Details
install subpanel for kitchen, gfi outlets, cabintet countertop, flooring, sink, dishwasher, stove, ; bathroom, sink, apinting , ceiling light. | $18,000 |