Back to bathroom remodel contractors
Headlands Construction Co
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2018 to Mar 2026
- Last 24 months
- 2 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 198 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2025 | Completed final sign-off Sep 2026 | 2611 Pacific Av | renovation to single family residence: 2nd floor - add shower to existing powder room, relocate laundry. 3rd fl: remodel existing bathroom, construct new bathroom. exterior: infill 3 skylights, add 2 side west windows. remove (e) ceiling, reinforce roof framing, replace (3) garage posts and ftgs.Details
renovation to single family residence: 2nd floor - add shower to existing powder room, relocate laundry. 3rd fl: remodel existing bathroom, construct new bathroom. exterior: infill 3 skylights, add 2 side west windows. remove (e) ceiling, reinforce roof framing, replace (3) garage posts and ftgs. | $72,000 |
| Mar 7, 2024 | Completed final sign-off May 2025 | 290 Jersey St | water damage repair. like for like: includes 3-1/2 bathrooms, 1 full kitchen, 1 kitchenette, new flooring, drywall, insulation, (12) windows in kind (non street visible). interior doors, new plumbing & electrical fixtures, no structural, floor/layout modifications remain unchanged.Details
water damage repair. like for like: includes 3-1/2 bathrooms, 1 full kitchen, 1 kitchenette, new flooring, drywall, insulation, (12) windows in kind (non street visible). interior doors, new plumbing & electrical fixtures, no structural, floor/layout modifications remain unchanged. | $125,000 |
| Dec 7, 2020 | Never finaled issued Jul 2021, no final | 433 Upper Tr | residential remodel of 2 units. unit #7 - remodel of kitchen/bath & structural upgrades. unit #8 - remodel of kitchen/bath & structural upgrades. no exterior alterations. reference pa #2020-1118-9147.Details
residential remodel of 2 units. unit #7 - remodel of kitchen/bath & structural upgrades. unit #8 - remodel of kitchen/bath & structural upgrades. no exterior alterations. reference pa #2020-1118-9147. | $120,000 |