Hawk Hill Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2025 to Sep 2026
- Last 24 months
- 14 permits filed
14 permits since 2000: 6 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 in progress. Typically 2 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2026 | In progress issued Sep 2026 | 1894 Great Hy | remodel existing home including new interior stair connecting level 1 and level 2. the conversion of a finished office space into a bedroom, a relocated bath, a relocated laundry room, new walkin closet, new exterior doors and window to match existing. remodel (e) kitchen in kind.Details
remodel existing home including new interior stair connecting level 1 and level 2. the conversion of a finished office space into a bedroom, a relocated bath, a relocated laundry room, new walkin closet, new exterior doors and window to match existing. remodel (e) kitchen in kind. | $100,000 |
| Jun 18, 2025 | Completed final sign-off Aug 2025 | 300 Prague St | #1: remodel (e) kitchen and (e) bath in kind. replace counters, cabinets, floor, new vanity, new plumbing no change to floor layout. no change to wall layout. no structual work. maintain all (e) fire rating and separation.Details
#1: remodel (e) kitchen and (e) bath in kind. replace counters, cabinets, floor, new vanity, new plumbing no change to floor layout. no change to wall layout. no structual work. maintain all (e) fire rating and separation. | $28,000 |
| Feb 19, 2025 | Completed final sign-off May 2025 | 2210 45th Av | partial remodel of kitchen in existing footprint. no change to kitchen layout, new cabinets, flooring, lighting, and plumbing. enlarge existing opening to kitchen in wall between kitchen and dining. new kitchen hood.Details
partial remodel of kitchen in existing footprint. no change to kitchen layout, new cabinets, flooring, lighting, and plumbing. enlarge existing opening to kitchen in wall between kitchen and dining. new kitchen hood. | $17,500 |