Back to kitchen remodel contractors
Hauer Construction & Maintenance
- Based in
- Windsor
- On San Francisco permits
- Jul 2001 to Feb 2026
- Last 24 months
- 1 permit filed
52 permits since 2000: 39 completed, 2 in progress, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 never finaled. Typically 0 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2023 | Never finaled filed Aug 2023, never issued | 165 Duboce Av | unit # 101: replace kitchen in kind. add line curcuit. service box. plumbing.Details
unit # 101: replace kitchen in kind. add line curcuit. service box. plumbing. | $15,000 |
| Aug 10, 2022 | Completed final sign-off Feb 2023 | 133 Dorantes Av | remove kitchen cabinets install new ones, appliances, countertops, lighting, outlets.Details
remove kitchen cabinets install new ones, appliances, countertops, lighting, outlets. | $35,000 |
| May 24, 2018 | Completed final sign-off Sep 2018 | 2141 Hayes St | demo and install new kitchen cabinets, insulation, sheetrock, approx. 16 heads and switches, new sink, new vent hood terminates to roof, all new lites install to be high efficacyDetails
demo and install new kitchen cabinets, insulation, sheetrock, approx. 16 heads and switches, new sink, new vent hood terminates to roof, all new lites install to be high efficacy | $25,000 |
| Mar 7, 2018 | Completed final sign-off Mar 2018 | 1 Castro St | replace kitchen cabinets in kind and kitchen sink and appliances. kitchen remodel in kind.Details
replace kitchen cabinets in kind and kitchen sink and appliances. kitchen remodel in kind. | $5,000 |
| May 30, 2017 | Completed final sign-off Mar 2018 | 3 Castro St | replace kitchen cabinets & sink. . replace 17 windows inkind with aluminum clad wood windows. to comply with egress windows.Details
replace kitchen cabinets & sink. . replace 17 windows inkind with aluminum clad wood windows. to comply with egress windows. | $25,000 |
| May 13, 2013 | Completed final sign-off Nov 2013 | 465 Douglass St | remove kitchen cabinets & replace in-kind. replace flooring, sheetrock, change lighting, install new applances.Details
remove kitchen cabinets & replace in-kind. replace flooring, sheetrock, change lighting, install new applances. | $65,000 |
| Feb 17, 2012 | Completed final sign-off Jun 2012 | 119 Freelon St | replace kitchen cabinets in kind, replace water heater, water heater flue through the roof to comply with cmc 802.6Details
replace kitchen cabinets in kind, replace water heater, water heater flue through the roof to comply with cmc 802.6 | $7,000 |
| Sep 8, 2008 | Completed final sign-off Nov 2008 | 601 Van Ness Av | replace contertops in kitchen, replace kitchen sink, lights and bathroom lights. paint and replace flooring all work with unit no structural.Details
replace contertops in kitchen, replace kitchen sink, lights and bathroom lights. paint and replace flooring all work with unit no structural. | $22,000 |
| Jan 5, 2007 | Completed final sign-off Jan 2008 | 999 Green St | kitchen finishes and fixtures upgrade. electrical and plumbing upgrade. removal of (e) non structural partition wall. no structural work to be done.Details
kitchen finishes and fixtures upgrade. electrical and plumbing upgrade. removal of (e) non structural partition wall. no structural work to be done. | $60,000 |
| Dec 29, 2006 | Completed final sign-off Apr 2007 | 1339 Palou Av | change plans applic. number 200606164253. move closet in master bedroom, remove stairs on south side rear back of house and make into pantry area for kitchen.Details
change plans applic. number 200606164253. move closet in master bedroom, remove stairs on south side rear back of house and make into pantry area for kitchen. | $1,500 |
| Jun 16, 2006 | Completed final sign-off Apr 2007 | 1339 Palou Av | comply with nov 200565602, install 2 new baths, replace windows new double pane, insulate house, kitchen, electrical , plumbing, for baths and kitchen. repair dryrot to stairs and decks, reframe interior walls, install french doorDetails
comply with nov 200565602, install 2 new baths, replace windows new double pane, insulate house, kitchen, electrical , plumbing, for baths and kitchen. repair dryrot to stairs and decks, reframe interior walls, install french door | $90,000 |
| Nov 14, 2003 | Completed final sign-off May 2005 | 2306 Cecilia Av | remodel kitchen in kind, replace cabinets, plumbing fixtures, lights,floor. sheetrock wall, retainDetails
remodel kitchen in kind, replace cabinets, plumbing fixtures, lights,floor. sheetrock wall, retain | $9,300 |