30 permits since 2000: 28 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2013 | Completed final sign-off Aug 2013 | 35 Waverly Pl | remodel kitchen for units a & b. install ada handle bar for bathroom, units a&b. to comply with his nov#201392641 dated 3/18/2013 to comply with ordinance 029-33 only. installation of grab bars at the following locations: bathrooms @ 2nd & 3rd floors.Details
remodel kitchen for units a & b. install ada handle bar for bathroom, units a&b. to comply with his nov#201392641 dated 3/18/2013 to comply with ordinance 029-33 only. installation of grab bars at the following locations: bathrooms @ 2nd & 3rd floors. | $7,500 |
| Jun 18, 2013 | Completed final sign-off Oct 2013 | 30 Auburn St | remodel kitchen, 1-1/2 bath, rewire whole flat, upgrade service to 200 amp.Details
remodel kitchen, 1-1/2 bath, rewire whole flat, upgrade service to 200 amp. | $25,000 |
| Mar 10, 2009 | Completed final sign-off Oct 2009 | 28 Hemway Tr | remodel kitchen, 1 & 1/2 bath, living room, (3 sides & ceiling) remove plaster resheetrock garage: removed plaster, replace with sheetrock (3 sides & ceiling) total 2084 sqft. sheetrock (30'x20'=600 ft) provide min 50% of light watts in kitchen in fluorescent lights. fluorescent light or occupanyDetails
remodel kitchen, 1 & 1/2 bath, living room, (3 sides & ceiling) remove plaster resheetrock garage: removed plaster, replace with sheetrock (3 sides & ceiling) total 2084 sqft. sheetrock (30'x20'=600 ft) provide min 50% of light watts in kitchen in fluorescent lights. fluorescent light or occupany | $34,000 |
| May 16, 2007 | Completed final sign-off Apr 2009 | 2026 34th Av | to add one bedroom. one playroom/laundry room and one full bathroom on (e) groundfloor per groundfloor plan. and also to divide (e) one full bath to new two full bathroom and remodel (e) kitchen on existing 2nd floor per 2nd floor plan.Details
to add one bedroom. one playroom/laundry room and one full bathroom on (e) groundfloor per groundfloor plan. and also to divide (e) one full bath to new two full bathroom and remodel (e) kitchen on existing 2nd floor per 2nd floor plan. | $42,000 |