Hang C Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Feb 2026
- Last 24 months
- 6 permits filed
124 permits since 2000: 107 completed, 5 in progress, 3 never finaled, 9 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 264 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2006 | Completed final sign-off Jan 2008 | 628 Edna St | horizontal addition into rear yard 12'0". top floor expand master bedroom and add roof deck remodel (e) kitchen bottom floor add family room reconfigure existing stairs between floors. horizontal addition approx 396 sq. ftDetails
horizontal addition into rear yard 12'0". top floor expand master bedroom and add roof deck remodel (e) kitchen bottom floor add family room reconfigure existing stairs between floors. horizontal addition approx 396 sq. ft | $54,220 |