Back to kitchen remodel contractors
Hang C Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Feb 2026
- Last 24 months
- 6 permits filed
124 permits since 2000: 107 completed, 5 in progress, 3 never finaled, 9 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
39 kitchen remodel permits: 36 completed, 2 in progress, 1 expired or cancelled. Typically 3 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2025 | In progress issued Oct 2026 | 3114 Franklin St | demolition of interior partitions at kitchen, bedroom, lvg rm. new interior layout for kitchen, bath, including garage space for enlarge liviing rm. replace 3 windows facing the backyard. upgrade electrical, heating, plumbing. structural upgrade. no new horizontal additon.Details
demolition of interior partitions at kitchen, bedroom, lvg rm. new interior layout for kitchen, bath, including garage space for enlarge liviing rm. replace 3 windows facing the backyard. upgrade electrical, heating, plumbing. structural upgrade. no new horizontal additon. | $150,000 |
| May 14, 2025 | In progress issued Jul 2025 | 626 40th Av | remodel 2 kitchens; open up 1 wall partially, remove column and add a beam in existing kitchen; remodel 4 bathroom (2 per floor/unit); general window replacements; repair siding @ existing lightwell; front & rear cades, typ. general mep upgradesDetails
remodel 2 kitchens; open up 1 wall partially, remove column and add a beam in existing kitchen; remodel 4 bathroom (2 per floor/unit); general window replacements; repair siding @ existing lightwell; front & rear cades, typ. general mep upgrades | $185,000 |
| Aug 20, 2024 | Completed final sign-off Sep 2024 | 1687 32nd Av | kitchen remodel in-kindDetails
kitchen remodel in-kind | $10,000 |
| Aug 22, 2023 | Completed final sign-off Nov 2023 | 7750 Geary Bl | add non-bearing partitions to living room to create new office @ unit 2. relocate closet. no structural work. close off doorway to kitchen from hall. widen (e) doorway between kitchen and dining rm. no exterior work. kitchen & bath remodel under separate pa 202305268694.Details
add non-bearing partitions to living room to create new office @ unit 2. relocate closet. no structural work. close off doorway to kitchen from hall. widen (e) doorway between kitchen and dining rm. no exterior work. kitchen & bath remodel under separate pa 202305268694. | $1,500 |
| Jun 8, 2023 | Completed final sign-off Aug 2024 | 121 06th Av | renovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms.Details
renovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms. | $250,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 7750 Geary Bl | unit#2 (second floor unit): remodel kitchen in kind. remodel bathroom in kind. replace (6) rear and side windows, not street-visible.Details
unit#2 (second floor unit): remodel kitchen in kind. remodel bathroom in kind. replace (6) rear and side windows, not street-visible. | $45,000 |
| Jan 20, 2022 | Completed final sign-off Jan 2022 | 238 Harold Av | replace kitchen & (2) bathroom cabinets on 2/f, no change to fixturesDetails
replace kitchen & (2) bathroom cabinets on 2/f, no change to fixtures | $7,800 |
| Jan 5, 2021 | Completed final sign-off May 2021 | 1859 Page St | unit 1: remodel kitchen, install new cabinets; remodel bathroom, new tile/new bath tub; 1 bedroom new dry wall/paintDetails
unit 1: remodel kitchen, install new cabinets; remodel bathroom, new tile/new bath tub; 1 bedroom new dry wall/paint | $30,000 |
| Oct 27, 2020 | Completed final sign-off Jan 2021 | 1146 Plymouth Av | kitchen remodel on 2nd fl. replace cabinets/ new counter tops with new sink.Details
kitchen remodel on 2nd fl. replace cabinets/ new counter tops with new sink. | $10,000 |
| Oct 1, 2020 | Completed final sign-off Oct 2021 | 626 03rd Av | remodel (e) kitchen & (e) baths, no wall movements.Details
remodel (e) kitchen & (e) baths, no wall movements. | $30,000 |
| Jan 24, 2020 | Completed final sign-off Aug 2020 | 665 20th Av | remodel 2nd fl kitchen, open 2 walls and reinforce e with plywood panels. add 2 beams, 3 cols, 3 footings in garage. add laundry at 2nd fl. remodel 2nd fl bath, change 6 windows not visible from street. add 3 skylights, general mep upgradesDetails
remodel 2nd fl kitchen, open 2 walls and reinforce e with plywood panels. add 2 beams, 3 cols, 3 footings in garage. add laundry at 2nd fl. remodel 2nd fl bath, change 6 windows not visible from street. add 3 skylights, general mep upgrades | $66,000 |
| Aug 5, 2019 | Completed final sign-off Nov 2020 | 1845 San Jose Av | per unit legalization 43-14, add kitchen to first floor unit.Details
per unit legalization 43-14, add kitchen to first floor unit. | $1,000 |
| Nov 20, 2018 | Completed final sign-off Jun 2019 | 2273 Mission St | convert (e) closet & pantry into 2 new full bathrooms (plus 1 existing full bath) to have totla of 3 full bathrooms. remodel kitchen & 3 bathrooms entirely with (n) fixtures & finishes on 2nd floorDetails
convert (e) closet & pantry into 2 new full bathrooms (plus 1 existing full bath) to have totla of 3 full bathrooms. remodel kitchen & 3 bathrooms entirely with (n) fixtures & finishes on 2nd floor | $48,000 |
| Oct 24, 2018 | Completed final sign-off Jan 2019 | 175 Apollo St | kitchen remodel: replace cabinets and new appliances. upgrade electrical. approx 150 sq ftDetails
kitchen remodel: replace cabinets and new appliances. upgrade electrical. approx 150 sq ft | $6,000 |
| Oct 3, 2018 | Completed final sign-off Feb 2019 | 736 34th Av | unit #736: replace some dry rot at bedroom, remove (e) plaster on bedrooms & reinstall 5/8" drywall type "x". remodel kitchen, one full bathroom, one half bath. replace w/new furnace. kitchen ~120sf, full bath 60sf, half bath 22sf.Details
unit #736: replace some dry rot at bedroom, remove (e) plaster on bedrooms & reinstall 5/8" drywall type "x". remodel kitchen, one full bathroom, one half bath. replace w/new furnace. kitchen ~120sf, full bath 60sf, half bath 22sf. | $40,000 |
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 1859 Page St | kitchen remodel - new cabinets. bathroom remodel - new tile and bathtub. remodel living and bedrooms plaster and refinsih dry wall w/ 5/8" type 'x'. repaintDetails
kitchen remodel - new cabinets. bathroom remodel - new tile and bathtub. remodel living and bedrooms plaster and refinsih dry wall w/ 5/8" type 'x'. repaint | $28,000 |
| Apr 27, 2018 | Completed final sign-off Apr 2021 | 129 18th Av | convert grd fl storage & garage area to one 2-bedrm adu per ordinance 162-16. (n) conditioned area 947sf. soft story under pa#201803123403. 1 kitchens, two baths, one car garage to remain. change wins & doors @ grd fl. not visible from street. add bike parking as reqd. insolate thruou mep upgrade.Details
convert grd fl storage & garage area to one 2-bedrm adu per ordinance 162-16. (n) conditioned area 947sf. soft story under pa#201803123403. 1 kitchens, two baths, one car garage to remain. change wins & doors @ grd fl. not visible from street. add bike parking as reqd. insolate thruou mep upgrade. | $90,000 |
| Feb 15, 2018 | Completed final sign-off Sep 2018 | 2186 36th Av | infill center patio on 2nd fl, reframe roof, add skylights. remodel kitchen, add half bath 2nd f. reconfigure stair to 3rd fl. add privacy door at bottom of stair. remodel 3rd fl, e bath, add closets. change windows not visible street. add plywood wall. holdowns ond 2nd fl. insulate bolt foundationDetails
infill center patio on 2nd fl, reframe roof, add skylights. remodel kitchen, add half bath 2nd f. reconfigure stair to 3rd fl. add privacy door at bottom of stair. remodel 3rd fl, e bath, add closets. change windows not visible street. add plywood wall. holdowns ond 2nd fl. insulate bolt foundation | $102,487 |
| May 19, 2017 | Completed final sign-off Jul 2017 | 1895 08th Av | work in unit #5: remodel a kitchen, replace and countertop only. remodel a full bathroom, replace a 5' shower pan and finishesDetails
work in unit #5: remodel a kitchen, replace and countertop only. remodel a full bathroom, replace a 5' shower pan and finishes | $7,000 |
| Nov 23, 2016 | Completed final sign-off Oct 2017 | 5420 California St | convert (e) grd fl.rms to adu per ord 162-16 (ref #201601086619) for approved rooms & build) add shower, add kitchen & dinning rm ~205 sf new conditined, 118 sf new habitable. relocate 2 fire doors. add plywood panel & holdowns. relocate laundry. (e) fire sprinkler under separate permit to remain.Details
convert (e) grd fl.rms to adu per ord 162-16 (ref #201601086619) for approved rooms & build) add shower, add kitchen & dinning rm ~205 sf new conditined, 118 sf new habitable. relocate 2 fire doors. add plywood panel & holdowns. relocate laundry. (e) fire sprinkler under separate permit to remain. | $20,600 |
| Jun 9, 2016 | Completed final sign-off Mar 2017 | 2455 14th Av | add new den/office @ grd fl. remodel (e) bedrm, living rm/family rm, full bath, laundry area & add new stairs (to replace old stairs). open between floors. add shear walls bolt foundations. remodel kitchen and 2 baths on 2nd floor. replace 27 windows, not visible from street. plywood, panels on 2/fDetails
add new den/office @ grd fl. remodel (e) bedrm, living rm/family rm, full bath, laundry area & add new stairs (to replace old stairs). open between floors. add shear walls bolt foundations. remodel kitchen and 2 baths on 2nd floor. replace 27 windows, not visible from street. plywood, panels on 2/f | $100,780 |
| Oct 5, 2015 | Completed final sign-off May 2016 | 1751 20th Av | fill in under (e) 2/f bedroom at back yard, excavate <50 cu.yard, new footings, add family room, bedroom, full bath @ g/f; remodel (e) kitchen & (e) bath @ 2/f; replace all windows, not visible from street; add plywood panels & holdowns; add site retaining walls <48" high for sunken patios,Details
fill in under (e) 2/f bedroom at back yard, excavate <50 cu.yard, new footings, add family room, bedroom, full bath @ g/f; remodel (e) kitchen & (e) bath @ 2/f; replace all windows, not visible from street; add plywood panels & holdowns; add site retaining walls <48" high for sunken patios, | $88,195 |
| Jun 9, 2014 | Completed final sign-off Sep 2015 | 1215 Silver Av | add a 2nd unit on the ground floor: 1 bedrm, 1 bath, kitchen, excavate 16 1/2" for sub floor and headroom, new slab, new footings, add 2nd furnace and water heater, relocate laundry, general mep upgradesDetails
add a 2nd unit on the ground floor: 1 bedrm, 1 bath, kitchen, excavate 16 1/2" for sub floor and headroom, new slab, new footings, add 2nd furnace and water heater, relocate laundry, general mep upgrades | $65,000 |
| Apr 22, 2014 | Completed final sign-off Nov 2014 | 15 Forest Side Av | replace 12 windows with fiberglass/wood clad either andersen 200/400 series or integrity by marvin. front: 5 casements, living room: 2 awning, kitchen/nook: 3 double-hung, kitchen/dining room: 2 gliders.Details
replace 12 windows with fiberglass/wood clad either andersen 200/400 series or integrity by marvin. front: 5 casements, living room: 2 awning, kitchen/nook: 3 double-hung, kitchen/dining room: 2 gliders. | $4,800 |
| Mar 17, 2014 | Completed final sign-off Jun 2016 | 587 18th Av | remodel kitchen. open wall between kitchen and dining room. add beam and columns. add anchor bolts to extg foundation. upgrade mep as needed.Details
remodel kitchen. open wall between kitchen and dining room. add beam and columns. add anchor bolts to extg foundation. upgrade mep as needed. | $20,523 |
| Mar 10, 2014 | Completed final sign-off Dec 2014 | 15 Forest Side Av | develop ground flr accessory rooms: add 1 bedroom, 1 bath, 1 half bath, family room. reconfig interior stairs open to above. remodel 2nd floor kitchen, open walls to dining room. replace doors and windows not visible from street, add site decks < 36" from grade. mep upgrades. struc reinf as neededDetails
develop ground flr accessory rooms: add 1 bedroom, 1 bath, 1 half bath, family room. reconfig interior stairs open to above. remodel 2nd floor kitchen, open walls to dining room. replace doors and windows not visible from street, add site decks < 36" from grade. mep upgrades. struc reinf as needed | $120,000 |
| Jan 25, 2013 | Completed final sign-off Mar 2013 | 120 Laura St | comply with complaints 201383691 and 201384121 to remove kitchen at ground floor and replace rear fence to max 6' heightDetails
comply with complaints 201383691 and 201384121 to remove kitchen at ground floor and replace rear fence to max 6' height | $2,500 |
| Apr 5, 2012 | Completed final sign-off Oct 2013 | 1961 20th Av | remodel extg kitchen open wall btw. dining room and kitchen. add header beam, cols, reinforce joist below. replace extg stairs to basemsent in kind. replace 2 windows with 1 window at kitchen. remodel one bath. remove and relocate one column in garage. add parallam beam. column and ftg in garage.Details
remodel extg kitchen open wall btw. dining room and kitchen. add header beam, cols, reinforce joist below. replace extg stairs to basemsent in kind. replace 2 windows with 1 window at kitchen. remodel one bath. remove and relocate one column in garage. add parallam beam. column and ftg in garage. | $18,000 |
| Feb 6, 2012 | Expired or cancelled cancelled Oct 2013 | 2400 Yorba St | kitchen remodel, replace (e) cabinets on 2nd flr, upgrade electrical and refinish, no structural work, new lighting comply with cec150(k)Details
kitchen remodel, replace (e) cabinets on 2nd flr, upgrade electrical and refinish, no structural work, new lighting comply with cec150(k) | $8,000 |
| May 18, 2011 | Completed final sign-off Aug 2011 | 2667 20th Av | 2nd floor remodel 1 kitchen. replace 4 vinyl windows in kitchen wall middle of building. not visable from street in kind. maux ufactor.40Details
2nd floor remodel 1 kitchen. replace 4 vinyl windows in kitchen wall middle of building. not visable from street in kind. maux ufactor.40 | $5,000 |
| Sep 26, 2008 | Completed final sign-off Dec 2008 | 390 Capistrano Av | as builts with revisions to pa# 2007-0509-0766 per field inspector instructions. reduce 2 bedrooms to 1 bedroom due to lack of space. relocate (e) bathrooms. upstairs: move master bathroom and master closet to other side of room. minor kitchen and bathroom fixture changesDetails
as builts with revisions to pa# 2007-0509-0766 per field inspector instructions. reduce 2 bedrooms to 1 bedroom due to lack of space. relocate (e) bathrooms. upstairs: move master bathroom and master closet to other side of room. minor kitchen and bathroom fixture changes | |
| Jul 22, 2008 | Completed final sign-off Feb 2009 | 263 Capistrano Av | legalize g/f bedroom, study rm and two bathrms, replace new foundation at rear, new windows & non-bearing wall at g/f, second fl: move non-bearing wall to enlarge bedroom and remodel kitchen.Details
legalize g/f bedroom, study rm and two bathrms, replace new foundation at rear, new windows & non-bearing wall at g/f, second fl: move non-bearing wall to enlarge bedroom and remodel kitchen. | $30,000 |
| Jul 17, 2008 | Completed final sign-off Oct 2008 | 624 La Grande Av | replace kitchen cabinets on 2nd floor. non structural.Details
replace kitchen cabinets on 2nd floor. non structural. | $7,500 |
| Apr 22, 2008 | Completed final sign-off Jun 2008 | 609 47th Av | remodel whole kitchen. replace a new cabinets.Details
remodel whole kitchen. replace a new cabinets. | $15,000 |
| Jun 4, 2007 | Completed final sign-off Jun 2007 | 75 Encanto Av | demo inside sheetrock ceilings and walls (2 bedroom) and 2 bathrooms. demo(e) kitchen, dining room, living room sheetrock walls and ceilings. co comply w/ nov #200706147.Details
demo inside sheetrock ceilings and walls (2 bedroom) and 2 bathrooms. demo(e) kitchen, dining room, living room sheetrock walls and ceilings. co comply w/ nov #200706147. | $5,000 |
| May 9, 2007 | Completed final sign-off Dec 2008 | 390 Capistrano Av | horizontal addition to rear yard approx 441 sf lower level, approx 389 sf upper level. downstairs add 2 bedroom, 2 baths, upstairs is a master bedroom suite. remodel kitchen.Details
horizontal addition to rear yard approx 441 sf lower level, approx 389 sf upper level. downstairs add 2 bedroom, 2 baths, upstairs is a master bedroom suite. remodel kitchen. | $140,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2007 | 2270 15th Av | replace five windows at second floor. kitchen remodle 2nd flr.Details
replace five windows at second floor. kitchen remodle 2nd flr. | $9,000 |
| Sep 20, 2006 | Completed final sign-off Jan 2008 | 628 Edna St | horizontal addition into rear yard 12'0". top floor expand master bedroom and add roof deck remodel (e) kitchen bottom floor add family room reconfigure existing stairs between floors. horizontal addition approx 396 sq. ftDetails
horizontal addition into rear yard 12'0". top floor expand master bedroom and add roof deck remodel (e) kitchen bottom floor add family room reconfigure existing stairs between floors. horizontal addition approx 396 sq. ft | $54,220 |
| Feb 23, 2004 | Completed final sign-off Mar 2004 | 2230 15th Av | revise existing app 200304081737 permit 991608- to reflect - we did not relocate kitchen & bath on 2Details
revise existing app 200304081737 permit 991608- to reflect - we did not relocate kitchen & bath on 2 |