Block 2920, lot 036
15 Forest Side Ave
- City’s use
- Single Family Residential
- Built
- 1924
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,978 sq ft
- Lot
- 3,301 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2014 | Completed final sign-off Nov 2014 | 15 Forest Side Av | Hang C Construction Inc | replace 12 windows with fiberglass/wood clad either andersen 200/400 series or integrity by marvin. front: 5 casements, living room: 2 awning, kitchen/nook: 3 double-hung, kitchen/dining room: 2 gliders.Details
replace 12 windows with fiberglass/wood clad either andersen 200/400 series or integrity by marvin. front: 5 casements, living room: 2 awning, kitchen/nook: 3 double-hung, kitchen/dining room: 2 gliders. | $4,800 |
| Mar 10, 2014 | Completed final sign-off Dec 2014 | 15 Forest Side Av | Hang C Construction Inc | develop ground flr accessory rooms: add 1 bedroom, 1 bath, 1 half bath, family room. reconfig interior stairs open to above. remodel 2nd floor kitchen, open walls to dining room. replace doors and windows not visible from street, add site decks < 36" from grade. mep upgrades. struc reinf as neededDetails
develop ground flr accessory rooms: add 1 bedroom, 1 bath, 1 half bath, family room. reconfig interior stairs open to above. remodel 2nd floor kitchen, open walls to dining room. replace doors and windows not visible from street, add site decks < 36" from grade. mep upgrades. struc reinf as needed | $120,000 |
| Jul 25, 2012 | Completed final sign-off Sep 2012 | 15 Forest Side Av | Bay Counties Electric & Const. | bathroom remodel in-kind, remove & replace plaster @ 2-bedrooms w/ gypsum board. remodel closet by bathroom.Details
bathroom remodel in-kind, remove & replace plaster @ 2-bedrooms w/ gypsum board. remodel closet by bathroom. | $12,000 |
| Aug 17, 2005 | Never finaled issued Aug 2005, no final | 15 Forest Side Av | San Francisco Summit Roofing | reroofingDetails
reroofing | $16,430 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hang C Construction Inc (2), Bay Counties Electric & Const., San Francisco Summit Roofing
- Architects
- Lisa Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.