Back to bathroom remodel contractors
Hang C Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Feb 2026
- Last 24 months
- 6 permits filed
124 permits since 2000: 107 completed, 5 in progress, 3 never finaled, 9 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 35 completed, 2 in progress. Typically 14 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2025 | In progress issued Oct 2026 | 3114 Franklin St | demolition of interior partitions at kitchen, bedroom, lvg rm. new interior layout for kitchen, bath, including garage space for enlarge liviing rm. replace 3 windows facing the backyard. upgrade electrical, heating, plumbing. structural upgrade. no new horizontal additon.Details
demolition of interior partitions at kitchen, bedroom, lvg rm. new interior layout for kitchen, bath, including garage space for enlarge liviing rm. replace 3 windows facing the backyard. upgrade electrical, heating, plumbing. structural upgrade. no new horizontal additon. | $150,000 |
| May 14, 2025 | In progress issued Jul 2025 | 626 40th Av | remodel 2 kitchens; open up 1 wall partially, remove column and add a beam in existing kitchen; remodel 4 bathroom (2 per floor/unit); general window replacements; repair siding @ existing lightwell; front & rear cades, typ. general mep upgradesDetails
remodel 2 kitchens; open up 1 wall partially, remove column and add a beam in existing kitchen; remodel 4 bathroom (2 per floor/unit); general window replacements; repair siding @ existing lightwell; front & rear cades, typ. general mep upgrades | $185,000 |
| Feb 11, 2025 | Completed final sign-off May 2025 | 1538 Clay St | repair fire damaged sheeetrock at units #3,4's living rm, bedrm, hallway and unit 8's hallway w/ 5/8"type x sheetrock. replace unit #3-4 windows. unit #4-6 windows (u=0.3max). bathroom remodel units #4 & 8. replace existing wall heater for unit #3 & 4. total of 4 fixed,7 double-hung,wood/alum.clad wDetails
repair fire damaged sheeetrock at units #3,4's living rm, bedrm, hallway and unit 8's hallway w/ 5/8"type x sheetrock. replace unit #3-4 windows. unit #4-6 windows (u=0.3max). bathroom remodel units #4 & 8. replace existing wall heater for unit #3 & 4. total of 4 fixed,7 double-hung,wood/alum.clad w | $50,000 |
| Aug 22, 2023 | Completed final sign-off Nov 2023 | 7750 Geary Bl | add non-bearing partitions to living room to create new office @ unit 2. relocate closet. no structural work. close off doorway to kitchen from hall. widen (e) doorway between kitchen and dining rm. no exterior work. kitchen & bath remodel under separate pa 202305268694.Details
add non-bearing partitions to living room to create new office @ unit 2. relocate closet. no structural work. close off doorway to kitchen from hall. widen (e) doorway between kitchen and dining rm. no exterior work. kitchen & bath remodel under separate pa 202305268694. | $1,500 |
| Jun 8, 2023 | Completed final sign-off Aug 2024 | 121 06th Av | renovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms.Details
renovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms. | $250,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 7750 Geary Bl | unit#2 (second floor unit): remodel kitchen in kind. remodel bathroom in kind. replace (6) rear and side windows, not street-visible.Details
unit#2 (second floor unit): remodel kitchen in kind. remodel bathroom in kind. replace (6) rear and side windows, not street-visible. | $45,000 |
| Jan 20, 2022 | Completed final sign-off Jan 2022 | 238 Harold Av | replace kitchen & (2) bathroom cabinets on 2/f, no change to fixturesDetails
replace kitchen & (2) bathroom cabinets on 2/f, no change to fixtures | $7,800 |
| Jan 26, 2021 | Completed final sign-off Nov 2021 | 115 06th Av | remodel 3rd fl master bath. remove non-bearing walls at closet alcove to expand bath. replace bath fixtures. general m.e.p. upgrades.Details
remodel 3rd fl master bath. remove non-bearing walls at closet alcove to expand bath. replace bath fixtures. general m.e.p. upgrades. | $14,990 |
| Jan 5, 2021 | Completed final sign-off May 2021 | 1859 Page St | unit 1: remodel kitchen, install new cabinets; remodel bathroom, new tile/new bath tub; 1 bedroom new dry wall/paintDetails
unit 1: remodel kitchen, install new cabinets; remodel bathroom, new tile/new bath tub; 1 bedroom new dry wall/paint | $30,000 |
| Nov 9, 2020 | Completed final sign-off Sep 2022 | 665 20th Av | rear horizontal addition 2-story. upstairs: convert from (2)bed(1)bath to (2)bed,(1)office,(2)bath. add 2nd legal unit on ground fl (2bed 2bath), changing property from single family house to 2-unit house. general mech/elec/plumb upgrades. (n)2nd fl ground entry/stairs; (n)1st fl unitDetails
rear horizontal addition 2-story. upstairs: convert from (2)bed(1)bath to (2)bed,(1)office,(2)bath. add 2nd legal unit on ground fl (2bed 2bath), changing property from single family house to 2-unit house. general mech/elec/plumb upgrades. (n)2nd fl ground entry/stairs; (n)1st fl unit | $150,000 |
| Oct 1, 2020 | Completed final sign-off Oct 2021 | 626 03rd Av | remodel (e) kitchen & (e) baths, no wall movements.Details
remodel (e) kitchen & (e) baths, no wall movements. | $30,000 |
| Jan 24, 2020 | Completed final sign-off Aug 2020 | 665 20th Av | remodel 2nd fl kitchen, open 2 walls and reinforce e with plywood panels. add 2 beams, 3 cols, 3 footings in garage. add laundry at 2nd fl. remodel 2nd fl bath, change 6 windows not visible from street. add 3 skylights, general mep upgradesDetails
remodel 2nd fl kitchen, open 2 walls and reinforce e with plywood panels. add 2 beams, 3 cols, 3 footings in garage. add laundry at 2nd fl. remodel 2nd fl bath, change 6 windows not visible from street. add 3 skylights, general mep upgrades | $66,000 |
| Nov 20, 2018 | Completed final sign-off Jun 2019 | 2273 Mission St | convert (e) closet & pantry into 2 new full bathrooms (plus 1 existing full bath) to have totla of 3 full bathrooms. remodel kitchen & 3 bathrooms entirely with (n) fixtures & finishes on 2nd floorDetails
convert (e) closet & pantry into 2 new full bathrooms (plus 1 existing full bath) to have totla of 3 full bathrooms. remodel kitchen & 3 bathrooms entirely with (n) fixtures & finishes on 2nd floor | $48,000 |
| Oct 25, 2018 | Completed final sign-off Jun 2020 | 55 Salmon St | remodel unit 1 & 2 kit & baths fill in (e) interior lightwell not visible from street or neighbors. reconfigure (e) rear stairs connecting all flrs and garafge and roof. voluntary add plywoof & holddowns. replace winds & doors, add window and skylt general mep upgrgades as needed. foundarion work voDetails
remodel unit 1 & 2 kit & baths fill in (e) interior lightwell not visible from street or neighbors. reconfigure (e) rear stairs connecting all flrs and garafge and roof. voluntary add plywoof & holddowns. replace winds & doors, add window and skylt general mep upgrgades as needed. foundarion work vo | $95,000 |
| Oct 3, 2018 | Completed final sign-off Feb 2019 | 736 34th Av | unit #736: replace some dry rot at bedroom, remove (e) plaster on bedrooms & reinstall 5/8" drywall type "x". remodel kitchen, one full bathroom, one half bath. replace w/new furnace. kitchen ~120sf, full bath 60sf, half bath 22sf.Details
unit #736: replace some dry rot at bedroom, remove (e) plaster on bedrooms & reinstall 5/8" drywall type "x". remodel kitchen, one full bathroom, one half bath. replace w/new furnace. kitchen ~120sf, full bath 60sf, half bath 22sf. | $40,000 |
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 1859 Page St | kitchen remodel - new cabinets. bathroom remodel - new tile and bathtub. remodel living and bedrooms plaster and refinsih dry wall w/ 5/8" type 'x'. repaintDetails
kitchen remodel - new cabinets. bathroom remodel - new tile and bathtub. remodel living and bedrooms plaster and refinsih dry wall w/ 5/8" type 'x'. repaint | $28,000 |
| Apr 27, 2018 | Completed final sign-off Apr 2021 | 129 18th Av | convert grd fl storage & garage area to one 2-bedrm adu per ordinance 162-16. (n) conditioned area 947sf. soft story under pa#201803123403. 1 kitchens, two baths, one car garage to remain. change wins & doors @ grd fl. not visible from street. add bike parking as reqd. insolate thruou mep upgrade.Details
convert grd fl storage & garage area to one 2-bedrm adu per ordinance 162-16. (n) conditioned area 947sf. soft story under pa#201803123403. 1 kitchens, two baths, one car garage to remain. change wins & doors @ grd fl. not visible from street. add bike parking as reqd. insolate thruou mep upgrade. | $90,000 |
| Feb 15, 2018 | Completed final sign-off Sep 2018 | 2186 36th Av | infill center patio on 2nd fl, reframe roof, add skylights. remodel kitchen, add half bath 2nd f. reconfigure stair to 3rd fl. add privacy door at bottom of stair. remodel 3rd fl, e bath, add closets. change windows not visible street. add plywood wall. holdowns ond 2nd fl. insulate bolt foundationDetails
infill center patio on 2nd fl, reframe roof, add skylights. remodel kitchen, add half bath 2nd f. reconfigure stair to 3rd fl. add privacy door at bottom of stair. remodel 3rd fl, e bath, add closets. change windows not visible street. add plywood wall. holdowns ond 2nd fl. insulate bolt foundation | $102,487 |
| May 19, 2017 | Completed final sign-off Jul 2017 | 1895 08th Av | work in unit #5: remodel a kitchen, replace and countertop only. remodel a full bathroom, replace a 5' shower pan and finishesDetails
work in unit #5: remodel a kitchen, replace and countertop only. remodel a full bathroom, replace a 5' shower pan and finishes | $7,000 |
| Jan 26, 2017 | Completed final sign-off Jul 2017 | 30 San Leandro Wy | reconfigure 2nd flr only: add third bedroom, remodel 2 (e) bathrooms add office. family room to remain. add plywood panels to 4 walls. no window changes. no work on other floors. general mep upgrades. no change to exterior.Details
reconfigure 2nd flr only: add third bedroom, remodel 2 (e) bathrooms add office. family room to remain. add plywood panels to 4 walls. no window changes. no work on other floors. general mep upgrades. no change to exterior. | $41,000 |
| Jun 9, 2016 | Completed final sign-off Mar 2017 | 2455 14th Av | add new den/office @ grd fl. remodel (e) bedrm, living rm/family rm, full bath, laundry area & add new stairs (to replace old stairs). open between floors. add shear walls bolt foundations. remodel kitchen and 2 baths on 2nd floor. replace 27 windows, not visible from street. plywood, panels on 2/fDetails
add new den/office @ grd fl. remodel (e) bedrm, living rm/family rm, full bath, laundry area & add new stairs (to replace old stairs). open between floors. add shear walls bolt foundations. remodel kitchen and 2 baths on 2nd floor. replace 27 windows, not visible from street. plywood, panels on 2/f | $100,780 |
| Mar 14, 2016 | Completed final sign-off Aug 2016 | 333 01st St | unit 1503: bathroom work: remove/replace tile floor, vanity, tile wall, gypsum boards around bathtub. tub to remain. replace (e) toilet.Details
unit 1503: bathroom work: remove/replace tile floor, vanity, tile wall, gypsum boards around bathtub. tub to remain. replace (e) toilet. | $1,200 |
| Oct 5, 2015 | Completed final sign-off May 2016 | 1751 20th Av | fill in under (e) 2/f bedroom at back yard, excavate <50 cu.yard, new footings, add family room, bedroom, full bath @ g/f; remodel (e) kitchen & (e) bath @ 2/f; replace all windows, not visible from street; add plywood panels & holdowns; add site retaining walls <48" high for sunken patios,Details
fill in under (e) 2/f bedroom at back yard, excavate <50 cu.yard, new footings, add family room, bedroom, full bath @ g/f; remodel (e) kitchen & (e) bath @ 2/f; replace all windows, not visible from street; add plywood panels & holdowns; add site retaining walls <48" high for sunken patios, | $88,195 |
| Feb 11, 2015 | Completed final sign-off Aug 2015 | 1910 22nd Av | 1) add 1 bedroom, one bath, and one family room on 1st floor per plan. 2)add deck in rear per plan.Details
1) add 1 bedroom, one bath, and one family room on 1st floor per plan. 2)add deck in rear per plan. | $30,000 |
| Jun 9, 2014 | Completed final sign-off Sep 2015 | 1215 Silver Av | add a 2nd unit on the ground floor: 1 bedrm, 1 bath, kitchen, excavate 16 1/2" for sub floor and headroom, new slab, new footings, add 2nd furnace and water heater, relocate laundry, general mep upgradesDetails
add a 2nd unit on the ground floor: 1 bedrm, 1 bath, kitchen, excavate 16 1/2" for sub floor and headroom, new slab, new footings, add 2nd furnace and water heater, relocate laundry, general mep upgrades | $65,000 |
| May 2, 2014 | Completed final sign-off Jun 2016 | 587 18th Av | remodel existing bath, add master bath, add washer/dryer on 3rd fl. general mep uprades. replace 3 windows in-kind not visible from street. enlarge master bedroom closet. no structural workDetails
remodel existing bath, add master bath, add washer/dryer on 3rd fl. general mep uprades. replace 3 windows in-kind not visible from street. enlarge master bedroom closet. no structural work | $20,000 |
| Mar 10, 2014 | Completed final sign-off Dec 2014 | 15 Forest Side Av | develop ground flr accessory rooms: add 1 bedroom, 1 bath, 1 half bath, family room. reconfig interior stairs open to above. remodel 2nd floor kitchen, open walls to dining room. replace doors and windows not visible from street, add site decks < 36" from grade. mep upgrades. struc reinf as neededDetails
develop ground flr accessory rooms: add 1 bedroom, 1 bath, 1 half bath, family room. reconfig interior stairs open to above. remodel 2nd floor kitchen, open walls to dining room. replace doors and windows not visible from street, add site decks < 36" from grade. mep upgrades. struc reinf as needed | $120,000 |
| Jan 10, 2014 | Completed final sign-off Jan 2015 | 2427 32nd Av | legalize 1 bathroom and storage on 1st fl per plan to comply with complaint 201343295Details
legalize 1 bathroom and storage on 1st fl per plan to comply with complaint 201343295 | $10,000 |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 1775 46th Av | add one bedroom, one bathroom, one powder room, laundry room and mudroom on 1st floor per plan. repair dry rot.Details
add one bedroom, one bathroom, one powder room, laundry room and mudroom on 1st floor per plan. repair dry rot. | $42,000 |
| Mar 20, 2013 | Completed final sign-off Jul 2013 | 3125 Noriega St | convert e storage to utility room, laundry room, and bath per plan. upgrde e panel and add sub panel for house meter for use of common areaDetails
convert e storage to utility room, laundry room, and bath per plan. upgrde e panel and add sub panel for house meter for use of common area | $32,000 |
| Jul 12, 2012 | Completed final sign-off Aug 2013 | 2270 15th Av | develop ground floor rooms: add bedroom, family room & full bath. excavate 18" for headroom @ rooms. replace partial footings as necessary. bolt foundations typ. new and existing per owner. replace 2 existing windows, add 4 new windows, replace patio door. relocate laundry. general mep upgrades.Details
develop ground floor rooms: add bedroom, family room & full bath. excavate 18" for headroom @ rooms. replace partial footings as necessary. bolt foundations typ. new and existing per owner. replace 2 existing windows, add 4 new windows, replace patio door. relocate laundry. general mep upgrades. | $58,376 |
| Apr 5, 2012 | Completed final sign-off Oct 2013 | 1961 20th Av | remodel extg kitchen open wall btw. dining room and kitchen. add header beam, cols, reinforce joist below. replace extg stairs to basemsent in kind. replace 2 windows with 1 window at kitchen. remodel one bath. remove and relocate one column in garage. add parallam beam. column and ftg in garage.Details
remodel extg kitchen open wall btw. dining room and kitchen. add header beam, cols, reinforce joist below. replace extg stairs to basemsent in kind. replace 2 windows with 1 window at kitchen. remodel one bath. remove and relocate one column in garage. add parallam beam. column and ftg in garage. | $18,000 |
| Sep 26, 2008 | Completed final sign-off Dec 2008 | 390 Capistrano Av | as builts with revisions to pa# 2007-0509-0766 per field inspector instructions. reduce 2 bedrooms to 1 bedroom due to lack of space. relocate (e) bathrooms. upstairs: move master bathroom and master closet to other side of room. minor kitchen and bathroom fixture changesDetails
as builts with revisions to pa# 2007-0509-0766 per field inspector instructions. reduce 2 bedrooms to 1 bedroom due to lack of space. relocate (e) bathrooms. upstairs: move master bathroom and master closet to other side of room. minor kitchen and bathroom fixture changes | |
| Sep 16, 2008 | Completed final sign-off Feb 2009 | 263 Capistrano Av | minor revisions to interior layout for upper & ground level, relocate 1 (e) bathroom on upper floor, relocate new window on ground floor restroom, modify (e) bathroom on ground floor. revision to pa# 2008-0722-7326-correct stair layout to match (e) at upper and ground floorDetails
minor revisions to interior layout for upper & ground level, relocate 1 (e) bathroom on upper floor, relocate new window on ground floor restroom, modify (e) bathroom on ground floor. revision to pa# 2008-0722-7326-correct stair layout to match (e) at upper and ground floor | $1,000 |
| Jun 4, 2007 | Completed final sign-off Jun 2007 | 75 Encanto Av | demo inside sheetrock ceilings and walls (2 bedroom) and 2 bathrooms. demo(e) kitchen, dining room, living room sheetrock walls and ceilings. co comply w/ nov #200706147.Details
demo inside sheetrock ceilings and walls (2 bedroom) and 2 bathrooms. demo(e) kitchen, dining room, living room sheetrock walls and ceilings. co comply w/ nov #200706147. | $5,000 |
| May 9, 2007 | Completed final sign-off Dec 2008 | 390 Capistrano Av | horizontal addition to rear yard approx 441 sf lower level, approx 389 sf upper level. downstairs add 2 bedroom, 2 baths, upstairs is a master bedroom suite. remodel kitchen.Details
horizontal addition to rear yard approx 441 sf lower level, approx 389 sf upper level. downstairs add 2 bedroom, 2 baths, upstairs is a master bedroom suite. remodel kitchen. | $140,000 |
| Feb 23, 2004 | Completed final sign-off Mar 2004 | 2230 15th Av | revise existing app 200304081737 permit 991608- to reflect - we did not relocate kitchen & bath on 2Details
revise existing app 200304081737 permit 991608- to reflect - we did not relocate kitchen & bath on 2 |