Back to kitchen remodel contractors
Hammerhead General Contractors Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2012 to Jul 2015
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 4 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2015 | Completed final sign-off Oct 2015 | 633 34th Av | removal wall between hallway (e) dinning area. convert (e) dining area to (n) kitchen. convert (e) kitchen into a study room. construct 1 new bathromm w/small window to create a master suite. removel (e) bath & laundry room, add one 30"x48" skylt @ new kitchen. int. remodel 3rd fl only.Details
removal wall between hallway (e) dinning area. convert (e) dining area to (n) kitchen. convert (e) kitchen into a study room. construct 1 new bathromm w/small window to create a master suite. removel (e) bath & laundry room, add one 30"x48" skylt @ new kitchen. int. remodel 3rd fl only. | $60,000 |
| Dec 11, 2014 | Completed final sign-off Oct 2015 | 2145 California St | #1 interior remodel: replace all wood windows in kind, remove (e) int plaster & lath & replace with 5/8 type"x" gyp board. enlarge shower location @ bathroom #2, relayout fixtures @ bath #1, kitchen remodel, update (e) elec lines & fixtures.Details
#1 interior remodel: replace all wood windows in kind, remove (e) int plaster & lath & replace with 5/8 type"x" gyp board. enlarge shower location @ bathroom #2, relayout fixtures @ bath #1, kitchen remodel, update (e) elec lines & fixtures. | $30,000 |
| Sep 22, 2014 | Completed final sign-off Nov 2016 | 75 Country Club Dr | reconfigure/remodel kitchen, combine (2) rear bedrms to become master suite; relocate/remodel bath #2, replace 5 windows @ 2nd flr. add fam rm, 2 bedrms, full bath, replace 5 windows, relocate & replace water heater w/tankless, relocate & replace furnace,install lights,switches,outl @ ground floorDetails
reconfigure/remodel kitchen, combine (2) rear bedrms to become master suite; relocate/remodel bath #2, replace 5 windows @ 2nd flr. add fam rm, 2 bedrms, full bath, replace 5 windows, relocate & replace water heater w/tankless, relocate & replace furnace,install lights,switches,outl @ ground floor | $75,000 |
| Jun 27, 2012 | Never finaled issued Jun 2012, no final | 2659 Alemany Bl | kitchen and bathroom upgrades, new floor and paint. recessed lights.Details
kitchen and bathroom upgrades, new floor and paint. recessed lights. | $10,500 |