Halyard Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Aug 2026
- Last 24 months
- 40 permits filed
286 permits since 2000: 154 completed, 27 in progress, 85 never finaled, 20 expired or cancelled.
Of the 85 never-finaled permits, 25 are 3 to 5 years old, 60 are 5 to 10 years old. 11 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 126 days from filing to permit and 31 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2021 | Never finaled issued Oct 2021, no final | 753 Larkin St | replace interior guardrails & interior stair in kind per current codel repair area of flooring & joist in kind where needed. (work in retail space #749).Details
replace interior guardrails & interior stair in kind per current codel repair area of flooring & joist in kind where needed. (work in retail space #749). | $35,000 |
| Sep 14, 2020 | Completed final sign-off Mar 2021 | 748 Page St | revision to pa 201805108844. revision to proposed units to accommodate stair landing & circulation. changes made to unit 11 to revise layout & bedroom count. reduction in sq ft at unit 10 & revised path of travel. structural has been revised with layout changes.Details
revision to pa 201805108844. revision to proposed units to accommodate stair landing & circulation. changes made to unit 11 to revise layout & bedroom count. reduction in sq ft at unit 10 & revised path of travel. structural has been revised with layout changes. | |
| Oct 15, 2019 | Completed final sign-off Nov 2019 | 756 Page St | replace 11 windows in kind to comply with nov 20192392. repair stairs @ roof and bring to code compliance to comply with nov 201970971. work is not visible from street. less than 50% of stairs worked onDetails
replace 11 windows in kind to comply with nov 20192392. repair stairs @ roof and bring to code compliance to comply with nov 201970971. work is not visible from street. less than 50% of stairs worked on | $5,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2022 | 675 Ofarrell St | provide 2 nd means of egress per nov 201718182 and 200714151. provide documentation of e fire escapes. remove existing sidewalk hatch. add new guardrails and handrail to existing stair from basement to sidewalk. add permanent ladder to grade from existing rear fire escape. remove hatch.Details
provide 2 nd means of egress per nov 201718182 and 200714151. provide documentation of e fire escapes. remove existing sidewalk hatch. add new guardrails and handrail to existing stair from basement to sidewalk. add permanent ladder to grade from existing rear fire escape. remove hatch. | $25,000 |