Back to kitchen remodel contractors
Halpin Construction Llc Dba Britannia Re
- Based in
- San Carlos
- On San Francisco permits
- Nov 2017 to Jan 2023
- Last 24 months
- 0 permits filed
25 permits since 2000: 22 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2022 | Completed final sign-off Oct 2022 | 600 Capp St | remodel one existing kitchen (like for like) no structural changes or modificationsDetails
remodel one existing kitchen (like for like) no structural changes or modifications | $20,000 |
| Dec 7, 2021 | Completed final sign-off Jul 2022 | 112 30th St | repair 3 units for smoke damage, new insulation and drywall, new kitchen cabinets, new bathroom fixturs. no structural or framing modifcations. no layout changes.Details
repair 3 units for smoke damage, new insulation and drywall, new kitchen cabinets, new bathroom fixturs. no structural or framing modifcations. no layout changes. | $150,000 |
| Oct 13, 2021 | Completed final sign-off Jun 2022 | 1483 Newcomb Av | remodel 2nd fl. relocate kitchen, new w/d closet, new full bathDetails
remodel 2nd fl. relocate kitchen, new w/d closet, new full bath | $27,000 |
| Jun 9, 2021 | Completed final sign-off Nov 2021 | 1475 Thomas Av | kitchen remodel w/minor framing (no structural changes), like for like to exterior wallDetails
kitchen remodel w/minor framing (no structural changes), like for like to exterior wall | $35,000 |
| Jul 30, 2020 | Completed final sign-off Jul 2021 | 230 Casitas Av | kitchen cabinet replacement (50sf)Details
kitchen cabinet replacement (50sf) | $15,000 |
| Feb 22, 2019 | Completed final sign-off Sep 2019 | 250 King St | replace e kitchen cabinets w/new kitchen cabinets & countertop. no change to floorplan, new material in like kind.Details
replace e kitchen cabinets w/new kitchen cabinets & countertop. no change to floorplan, new material in like kind. | $20,000 |