Back to kitchen remodel contractors
Hagenbach Construction
- Based in
- Brentwood
- On San Francisco permits
- May 2020 to Jun 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 23 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2020 | Completed final sign-off Sep 2020 | 1326 48th Av | remove and replace kitchen cabinets, floor, & plumbing. remove and replace master bath vanity, sink, water closet, shower valve and flooring. remove and replace vanity & toilet in guest bath & bath #2.Details
remove and replace kitchen cabinets, floor, & plumbing. remove and replace master bath vanity, sink, water closet, shower valve and flooring. remove and replace vanity & toilet in guest bath & bath #2. | $60,000 |