Back to kitchen remodel contractors
Haakon Leiro Construction
- Based in
- San Mateo
- On San Francisco permits
- Sep 2000 to Aug 2007
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2007 | Completed final sign-off Apr 2007 | 73 Castle St | new kitchen cabinets. paint. remove existing fireplace at top level. 50% of wattage of kitchen lighting to be fluorescent.Details
new kitchen cabinets. paint. remove existing fireplace at top level. 50% of wattage of kitchen lighting to be fluorescent. | $8,000 |
| Nov 29, 2001 | Completed final sign-off Jan 2002 | 2090 Pacific Av | take out kitchen cabinets & counter tops. replace w/ new. replace dishwasher,sink & garbage disposalDetails
take out kitchen cabinets & counter tops. replace w/ new. replace dishwasher,sink & garbage disposal | $20,000 |