Back to bathroom remodel contractors
H L Defelice/C R I Const
- Based in
- Elk Grove
- On San Francisco permits
- Feb 2001 to Dec 2011
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2011 | Completed final sign-off Jan 2012 | 2850 Cabrillo St | comply with nov# 201068147-demolition of non permitted unit on ground level-demo shower, sink, toilet, bathroom walls, cabinets, counter & range & fireplace.Details
comply with nov# 201068147-demolition of non permitted unit on ground level-demo shower, sink, toilet, bathroom walls, cabinets, counter & range & fireplace. | $12,480 |
| Dec 6, 2010 | Completed final sign-off Jun 2011 | 580 Washington St | remodel of extg 1st floor(street level) and basement commercial space into a dentist office compresed of 7 work station x-ray room, sterilization room, 2 labs, 2 offices employee locker and lounge area, reception dest and area includes mechanical. 2 new bathrooms.Details
remodel of extg 1st floor(street level) and basement commercial space into a dentist office compresed of 7 work station x-ray room, sterilization room, 2 labs, 2 offices employee locker and lounge area, reception dest and area includes mechanical. 2 new bathrooms. | $150,000 |
| Apr 20, 2006 | Completed final sign-off Jun 2006 | 444 Presidio Av | reconfigure bathroom in room 102 & 106, revision to appl #200603318046.Details
reconfigure bathroom in room 102 & 106, revision to appl #200603318046. | |
| Mar 31, 2006 | Completed final sign-off Jun 2006 | 444 Presidio Av | barrier removal work including 2 bathrooms, door closets, parking stripping, modifications to elevator & elevator call buttons. unit# 102 & # 106.Details
barrier removal work including 2 bathrooms, door closets, parking stripping, modifications to elevator & elevator call buttons. unit# 102 & # 106. | $40,000 |