H L Defelice/C R I Const
- Based in
- Elk Grove
- On San Francisco permits
- Feb 2001 to Dec 2011
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2011 | Completed final sign-off Jan 2012 | 2850 Cabrillo St | revision to app# 201109144574 fire place to remain. space to restored to stroage space.Details
revision to app# 201109144574 fire place to remain. space to restored to stroage space. | |
| Sep 14, 2011 | Completed final sign-off Jan 2012 | 2850 Cabrillo St | comply with nov# 201068147-demolition of non permitted unit on ground level-demo shower, sink, toilet, bathroom walls, cabinets, counter & range & fireplace.Details
comply with nov# 201068147-demolition of non permitted unit on ground level-demo shower, sink, toilet, bathroom walls, cabinets, counter & range & fireplace. | $12,480 |
| Dec 6, 2010 | Completed final sign-off Jun 2011 | 580 Washington St | remodel of extg 1st floor(street level) and basement commercial space into a dentist office compresed of 7 work station x-ray room, sterilization room, 2 labs, 2 offices employee locker and lounge area, reception dest and area includes mechanical. 2 new bathrooms.Details
remodel of extg 1st floor(street level) and basement commercial space into a dentist office compresed of 7 work station x-ray room, sterilization room, 2 labs, 2 offices employee locker and lounge area, reception dest and area includes mechanical. 2 new bathrooms. | $150,000 |
| Apr 14, 2009 | Completed final sign-off Apr 2009 | 444 Presidio Av | final building sign off on expired 200605020396; all work is completedDetails
final building sign off on expired 200605020396; all work is completed | |
| Apr 20, 2006 | Completed final sign-off Jun 2006 | 444 Presidio Av | reconfigure bathroom in room 102 & 106, revision to appl #200603318046.Details
reconfigure bathroom in room 102 & 106, revision to appl #200603318046. | |
| Mar 31, 2006 | Completed final sign-off Jun 2006 | 444 Presidio Av | barrier removal work including 2 bathrooms, door closets, parking stripping, modifications to elevator & elevator call buttons. unit# 102 & # 106.Details
barrier removal work including 2 bathrooms, door closets, parking stripping, modifications to elevator & elevator call buttons. unit# 102 & # 106. | $40,000 |
| Nov 14, 2002 | Completed final sign-off Mar 2003 | 601 Van Ness Av | remove bedrm door close in wall to separate into 2 units,build interior wall to make bedrm ;repl kitDetails
remove bedrm door close in wall to separate into 2 units,build interior wall to make bedrm ;repl kit | $8,500 |
| Sep 19, 2002 | Expired or cancelled expired Mar 2007 | 601 Van Ness Av | remove (e) awning & install new awning change light fixturesDetails
remove (e) awning & install new awning change light fixtures | $4,500 |
| Jan 4, 2002 | Completed final sign-off Mar 2002 | 601 Van Ness Av | p-1 level: build 26' 1 hr. rated wall w/1 hr. rated door to seperate elec. room fm engineers shopDetails
p-1 level: build 26' 1 hr. rated wall w/1 hr. rated door to seperate elec. room fm engineers shop | $2,211 |
| Aug 9, 2001 | Completed final sign-off Sep 2001 | 601 Van Ness Av | oti-3 ground floor, el, & l/sDetails
oti-3 ground floor, el, & l/s | $2,500 |
| Jul 9, 2001 | Completed final sign-off Nov 2001 | 601 Van Ness Av | oti-2 ground floor mech onlyDetails
oti-2 ground floor mech only | $33,000 |
| Jun 28, 2001 | Completed final sign-off Nov 2001 | 601 Van Ness Av | oti-1 rev grd fl,ltg,mech,ls,sprDetails
oti-1 rev grd fl,ltg,mech,ls,spr | $500 |
| Apr 25, 2001 | Completed final sign-off Nov 2001 | 601 Van Ness Av | oti-1 1st floor, el, me, ls, spDetails
oti-1 1st floor, el, me, ls, sp | $220,000 |
| Mar 1, 2001 | Completed final sign-off Nov 2001 | 601 Van Ness Av | remove interior none structural partitions, drop ceilings,2x4 drop in light fixtured, plumbing pipesDetails
remove interior none structural partitions, drop ceilings,2x4 drop in light fixtured, plumbing pipes | $17,000 |
| Feb 8, 2001 | Completed final sign-off May 2001 | 601 Van Ness Av | replace existing kitchen cabinets w/new,new oven, refrig, under cabinet lights, wall sconcesDetails
replace existing kitchen cabinets w/new,new oven, refrig, under cabinet lights, wall sconces | $15,000 |