Back to kitchen remodel contractors
H And B Construction Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to Jun 2026
- Last 24 months
- 5 permits filed
23 permits since 2000: 17 completed, 3 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 792 32nd Av | kitchen and laundry room remodel in kind. replace existing washer and dryer with new appliances.Details
kitchen and laundry room remodel in kind. replace existing washer and dryer with new appliances. | $18,000 |
| Aug 8, 2024 | Completed final sign-off Sep 2025 | 1547 Revere Av | to comply with nov# 202057513. convert 1st floor habitable space into a new residential unit with new kitchen.Details
to comply with nov# 202057513. convert 1st floor habitable space into a new residential unit with new kitchen. | $30,000 |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 1519 Palou Av | remodel kitchen (10'x10') and replace drywall 1500 sq ft 5/8" type "x" with 5d cooler nails.Details
remodel kitchen (10'x10') and replace drywall 1500 sq ft 5/8" type "x" with 5d cooler nails. | $200 |
| Nov 30, 2018 | Completed final sign-off Feb 2019 | 686 Hayes St | work on 1st floor. kitchen area = 160 sqft. kitchen remodel. flooring, cabinets, ceiling (partial), adding led overhead lights. all work within one unit. no work in common areas. no impact to egress. no increase in square footage. no change to occupancy.Details
work on 1st floor. kitchen area = 160 sqft. kitchen remodel. flooring, cabinets, ceiling (partial), adding led overhead lights. all work within one unit. no work in common areas. no impact to egress. no increase in square footage. no change to occupancy. | $10,000 |
| Jun 4, 2018 | Completed final sign-off Jul 2024 | 4 Card Al | 2nd floor - kitchen remodel, add new 3-fixture full bath, remodel 1 bathroom, remove (e) powder room. 3rd floor - add 3-fiixture full bath, remodel 1 bathroom, kitchen remodel, convert (e) office into bedroomDetails
2nd floor - kitchen remodel, add new 3-fixture full bath, remodel 1 bathroom, remove (e) powder room. 3rd floor - add 3-fiixture full bath, remodel 1 bathroom, kitchen remodel, convert (e) office into bedroom | $40,000 |
| Sep 8, 2017 | Expired or cancelled expired May 2026 | 5115 Anza St | per ordinance# 162-16. convert basement garage to additional dwelling unit, two new bathrooms, 3 new bedrooms, 1 kitchen.Details
per ordinance# 162-16. convert basement garage to additional dwelling unit, two new bathrooms, 3 new bedrooms, 1 kitchen. | $72,000 |
| Mar 22, 2017 | Completed final sign-off Sep 2017 | 611 03rd Av | remodel kitchen and 2 baths, upgrade elec. install new furnaceDetails
remodel kitchen and 2 baths, upgrade elec. install new furnace | $30,000 |