Back to kitchen remodel contractors
H A Bowen Electric Inc
- Based in
- San Leandro
- On San Francisco permits
- Feb 2004 to Oct 2020
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 62 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2007 | Completed final sign-off Nov 2007 | 450 Rhode Island St | as built revision drawings to app 200705100949 r1. additional monitored contact points. fire alarm system 1st floor. elevator- shunt trip roof duct detector. monitor kitchen hood system.Details
as built revision drawings to app 200705100949 r1. additional monitored contact points. fire alarm system 1st floor. elevator- shunt trip roof duct detector. monitor kitchen hood system. | $15,000 |