Back to kitchen remodel contractors
Gus Garza Construction
- Based in
- Fremont
- On San Francisco permits
- Sep 2021 to Sep 2021
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 158 days from filing to permit and 1435 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2021 | Completed final sign-off Feb 2026 | 7 Aquavista Wy | new 385 sq. ft. adu in existing garage/storage space, remodel existing kitchen, new balcony on 2nd floor (4'-0" deep and less than 10'-0" above grade).Details
new 385 sq. ft. adu in existing garage/storage space, remodel existing kitchen, new balcony on 2nd floor (4'-0" deep and less than 10'-0" above grade). | $74,000 |