Back to kitchen remodel contractors
Guos Construction Co
- Based in
- San Francisco
- On San Francisco permits
- May 2003 to Feb 2011
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2011 | Completed final sign-off May 2011 | 3232 Taraval St | comply with nov #201084546 & 201082609. change switch and panel. remove kitchen and bath room.Details
comply with nov #201084546 & 201082609. change switch and panel. remove kitchen and bath room. | $18,000 |
| Dec 6, 2010 | Completed final sign-off Apr 2011 | 2117 32nd Av | remodel grd fl to have 2 bedrms, 2 full bathrms, family rm, storage rm. install new gas furnace, water heater & laundry in garage. enclose space under (e) sunrm. modify space into new bedrm. remodel 2nd fl kitchen & 1 bathrm & add 1 1/2 bathrms with new finishesDetails
remodel grd fl to have 2 bedrms, 2 full bathrms, family rm, storage rm. install new gas furnace, water heater & laundry in garage. enclose space under (e) sunrm. modify space into new bedrm. remodel 2nd fl kitchen & 1 bathrm & add 1 1/2 bathrms with new finishes | $78,000 |
| Jul 10, 2006 | Completed final sign-off Dec 2006 | 2713 22nd St | (unit# 2721) replace kitchen cabinet, tile & window. replace window same size & opening. rear window. not visible from street.Details
(unit# 2721) replace kitchen cabinet, tile & window. replace window same size & opening. rear window. not visible from street. | $5,500 |
| Nov 30, 2005 | Completed final sign-off Jan 2006 | 2729 22nd St | replace kitchen cabinetsDetails
replace kitchen cabinets | $3,800 |
| May 19, 2003 | Expired or cancelled revoked Jun 2005 | 155 Westwood Dr | to remodel existing kitchen and bath room. dry rot repair, mostly in the room above garage.Details
to remodel existing kitchen and bath room. dry rot repair, mostly in the room above garage. | $46,000 |