Back to bathroom remodel contractors
Grey Gates Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Mar 2013
- Last 24 months
- 0 permits filed
29 permits since 2000: 19 completed, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2012 | Completed final sign-off May 2012 | 208 States St | unit #3: bathroom remodel: replace exsiting sink, toilet, bathtub and tile with new. location to remain the same. no wall relocation, no electrical & lighting work.Details
unit #3: bathroom remodel: replace exsiting sink, toilet, bathtub and tile with new. location to remain the same. no wall relocation, no electrical & lighting work. | $5,000 |
| May 18, 2011 | Completed final sign-off Jan 2012 | 1311 06th Av | unit #1311 - remodel (e) bathroom & make water closet room into powder roomDetails
unit #1311 - remodel (e) bathroom & make water closet room into powder room | $11,000 |
| Apr 25, 2008 | Expired or cancelled expired Apr 2009 | 1450 Greenwich St | bathroom remodel - new fixtures back in existing fixture locatins. remove tub, new shower in old tub locatin. new tile.Details
bathroom remodel - new fixtures back in existing fixture locatins. remove tub, new shower in old tub locatin. new tile. | $5,000 |