Block 2620, lot 014
208 States St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 21, 2013 | Completed final sign-off Nov 2013 | 208 States St | Grey Gates Construction | replace extg balcony in kind. same size and same envelope.Details
replace extg balcony in kind. same size and same envelope. | $3,500 |
| Mar 22, 2012 | Completed final sign-off May 2012 | 208 States St | Grey Gates Construction | unit #3: bathroom remodel: replace exsiting sink, toilet, bathtub and tile with new. location to remain the same. no wall relocation, no electrical & lighting work.Details
unit #3: bathroom remodel: replace exsiting sink, toilet, bathtub and tile with new. location to remain the same. no wall relocation, no electrical & lighting work. | $5,000 |
| Feb 24, 2012 | Completed final sign-off May 2012 | 208 States St | Bay Area Window Pros/Quality Constru | 28 windows, 22 new construction, 6 retrofit, aluminum to milgard fiberglalss, like for like, max u-factor =0.40.Details
28 windows, 22 new construction, 6 retrofit, aluminum to milgard fiberglalss, like for like, max u-factor =0.40. | $30,000 |
| Feb 22, 2011 | Completed final sign-off Mar 2011 | 208 States St | Kenneth Smith | per physical inspection: cc-5779; provide approved handrail for stairs @ rear of unit. guardrail if needed, handrail between 34" to 38" above tread nosing.Details
per physical inspection: cc-5779; provide approved handrail for stairs @ rear of unit. guardrail if needed, handrail between 34" to 38" above tread nosing. | $1,000 |
| Aug 25, 2010 | Completed final sign-off Jun 2011 | 208 States St | Ryan And Ryan Construction Inc | replace e exterior stair in kind. same size and same envelopeDetails
replace e exterior stair in kind. same size and same envelope | $10,000 |
| Dec 1, 2008 | Completed final sign-off Mar 2009 | 208 States St | work on unit#3 (rear building).kitchen remodeling that includes repositioning stove (gas) . replacing wall furnace-( face hallway).Details
work on unit#3 (rear building).kitchen remodeling that includes repositioning stove (gas) . replacing wall furnace-( face hallway). | $8,350 | |
| Apr 2, 2008 | Expired or cancelled cancelled Feb 2009 | 208 States St | demolition of existing wood stairs & replace it with new wood deck & stairs, front of building access stairs only (unit 1 & 2). replace 12 existing aluminum windows with new double pane wood windows.Details
demolition of existing wood stairs & replace it with new wood deck & stairs, front of building access stairs only (unit 1 & 2). replace 12 existing aluminum windows with new double pane wood windows. | $18,000 | |
| May 17, 2005 | Completed final sign-off Jun 2005 | 208 States St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $21,500 |
| Apr 24, 2001 | Completed final sign-off Oct 2001 | 208 States St | Olympic Restoration | drywall, framing, plumbing, electrical, painting. repair fire damaged bedrm & bathrm.Details
drywall, framing, plumbing, electrical, painting. repair fire damaged bedrm & bathrm. | $30,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.