Gregory T Malley
- Based in
- Los Altos Hills
- On San Francisco permits
- Dec 2017 to Apr 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 5 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 14 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2019 | Expired or cancelled expired Jun 2022 | 536 Laidley St | revision to foundation only 201806262966 at foundation. 1. new footing at backwall, 2. fill w/ cms con slab under e front stairs 3. conc slab at right rear side 4. framing to remain at rear crawl space, 5. n conc retaining wall at front left side 6. replace 4" topping with traffic topping. n/a maherDetails
revision to foundation only 201806262966 at foundation. 1. new footing at backwall, 2. fill w/ cms con slab under e front stairs 3. conc slab at right rear side 4. framing to remain at rear crawl space, 5. n conc retaining wall at front left side 6. replace 4" topping with traffic topping. n/a maher | $10,000 |