Back to kitchen remodel contractors
Gregory Davis Construction Incgregory Da
- Based in
- Novato
- On San Francisco permits
- Apr 2024 to Jul 2026
- Last 24 months
- 4 permits filed
5 permits since 2000: 1 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 in progress. Typically 50 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Aug 2026 | 1761 Fillmore St | ti to renovate (e) ground level tenant space. no changes to existing building footprint, structure, area or height. reconfigure layout that will accomodate the korean noodle restaurant. kitchen remodel with (n) kitchen equipment and fixtures. (n) interior and patio millwork and finishes. remodel theDetails
ti to renovate (e) ground level tenant space. no changes to existing building footprint, structure, area or height. reconfigure layout that will accomodate the korean noodle restaurant. kitchen remodel with (n) kitchen equipment and fixtures. (n) interior and patio millwork and finishes. remodel the | $400,000 |