Back to kitchen remodel contractors
Gregory Daigian Painting & Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to May 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2022 | Completed final sign-off Sep 2022 | 765 02nd Av | remove kitchen cabinets and replace in-kind. install new sink and dishwasher. extend gas line for new range. install new subpanel with 120/240 volts/60a feeder, rewire receptacles, switches, lights in bedrooms, living room, dining room, bath + hall. new wiring for kitchen.Details
remove kitchen cabinets and replace in-kind. install new sink and dishwasher. extend gas line for new range. install new subpanel with 120/240 volts/60a feeder, rewire receptacles, switches, lights in bedrooms, living room, dining room, bath + hall. new wiring for kitchen. | $32,000 |
| Jan 24, 2022 | Completed final sign-off Jun 2022 | 795 21st Av | unit 797: install (n) sink & dishwasher. unit 795: remove (e) kitchen cabinets & replace in-kind. install (n) sink & dishwasher. (n) subpanel with 120/240 volts/ 50a feeder. rewire receptacles, switches, lights in bedrooms, living room, bathroom & hallway. new wiring for kitchen.Details
unit 797: install (n) sink & dishwasher. unit 795: remove (e) kitchen cabinets & replace in-kind. install (n) sink & dishwasher. (n) subpanel with 120/240 volts/ 50a feeder. rewire receptacles, switches, lights in bedrooms, living room, bathroom & hallway. new wiring for kitchen. | $32,000 |
| Sep 10, 2021 | Completed final sign-off Mar 2022 | 797 21st Av | remove (e) kitchen cabinets and replace in kind.Details
remove (e) kitchen cabinets and replace in kind. | $14,000 |
| Jan 30, 2014 | Completed final sign-off Apr 2014 | 745 21st Av | unit #1. remodel kitchen & bathroom. replace cabinets in kind. reduce size of window in bath.Details
unit #1. remodel kitchen & bathroom. replace cabinets in kind. reduce size of window in bath. | $21,500 |
| Sep 20, 2012 | Completed final sign-off Nov 2013 | 828 26th Av | kitchen remodel: remove non load bearing wall between kitchen & dining room. replace cabinets in kind. kitchen remodel.Details
kitchen remodel: remove non load bearing wall between kitchen & dining room. replace cabinets in kind. kitchen remodel. | $6,000 |