Back to kitchen remodel contractors
Greg Livy, Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jun 2018
- Last 24 months
- 0 permits filed
37 permits since 2000: 35 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 17 completed. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2018 | Completed final sign-off Sep 2018 | 594 10th Av | kitchen remodel: new cabinets, countertops, re-use (e) appliances, new lightingDetails
kitchen remodel: new cabinets, countertops, re-use (e) appliances, new lighting | $40,000 |
| Jul 18, 2017 | Completed final sign-off May 2018 | 227 Panorama Dr | revision to #201705015359.remodel of (e) kitchen & bathroom, of the top floor. conversion of unconditioned space at rear 1st flr to habitable master bedroom suite, conversion of uninhabitable space below (e) 1st floor to habitable family room, bedroom full bath & wine storageDetails
revision to #201705015359.remodel of (e) kitchen & bathroom, of the top floor. conversion of unconditioned space at rear 1st flr to habitable master bedroom suite, conversion of uninhabitable space below (e) 1st floor to habitable family room, bedroom full bath & wine storage | $61,000 |
| May 1, 2017 | Completed final sign-off May 2018 | 227 Panorama Dr | kitchen & bath remodel in like kind, in same location, no moving of doors, walls, or windows.Details
kitchen & bath remodel in like kind, in same location, no moving of doors, walls, or windows. | $15,000 |
| Feb 16, 2016 | Completed final sign-off Dec 2016 | 180 Saint Elmo Wy | remodel within bldg envelope. remodel kitchen and reconfigure den/office and powder room lower extg floor joists for code compliant ceiling height. add new bathroom on 2nd floor and reconfigured master bath. new laundry 2nd floor, 5 new windows back and side (not visible to front)Details
remodel within bldg envelope. remodel kitchen and reconfigure den/office and powder room lower extg floor joists for code compliant ceiling height. add new bathroom on 2nd floor and reconfigured master bath. new laundry 2nd floor, 5 new windows back and side (not visible to front) | $125,000 |
| Sep 28, 2015 | Completed final sign-off Mar 2016 | 55 Newton St | interior remodel of s.f.d. remodel kitchen and bath on 2nd floor, provide new bath on 2nd floor, replace ext substandard interior stairs. legalize rooms down , 2 bedrooms, one bath and family room. replace all windows in kind at 2nd floor except window at front. not visible from street.Details
interior remodel of s.f.d. remodel kitchen and bath on 2nd floor, provide new bath on 2nd floor, replace ext substandard interior stairs. legalize rooms down , 2 bedrooms, one bath and family room. replace all windows in kind at 2nd floor except window at front. not visible from street. | $85,000 |
| Apr 16, 2014 | Completed final sign-off Sep 2014 | 2821 Buchanan St | unit #1: kitchen remodel. remove existing non bearing wall. new cabinets, countertop, floor, lightingDetails
unit #1: kitchen remodel. remove existing non bearing wall. new cabinets, countertop, floor, lighting | $45,000 |
| Nov 20, 2012 | Completed final sign-off Feb 2014 | 906 Rhode Island St | interior alteration throughout (kitchens & baths). remove (e) rear stairs & install new cantilevered decks & spiral stair. new skylights in (e) roof. 2 dormers (less than 20% roof area).Details
interior alteration throughout (kitchens & baths). remove (e) rear stairs & install new cantilevered decks & spiral stair. new skylights in (e) roof. 2 dormers (less than 20% roof area). | $100,000 |
| Sep 17, 2012 | Completed final sign-off Jan 2013 | 345 Locust St | remodel 2 bathrooms retile shower stalls and floor. new vanity and countertop.reface kitchen cabinets, new doors to cabinets, new countertop, new appliances. refinish hardwood floors, repaint walls and trim. no lighting change. plmg on seperate permit.Details
remodel 2 bathrooms retile shower stalls and floor. new vanity and countertop.reface kitchen cabinets, new doors to cabinets, new countertop, new appliances. refinish hardwood floors, repaint walls and trim. no lighting change. plmg on seperate permit. | $75,000 |
| Jan 21, 2010 | Completed final sign-off Mar 2010 | 65 Chaves Av | kitchen remodel. new cabinets and countertopsDetails
kitchen remodel. new cabinets and countertops | $15,000 |
| Sep 24, 2009 | Completed final sign-off Nov 2009 | 2871 Union St | kitchen remodel - new cabients, coutnertop in existing space, no removal of any walls, ceiling lighting to stay same.Details
kitchen remodel - new cabients, coutnertop in existing space, no removal of any walls, ceiling lighting to stay same. | $15,000 |
| Aug 18, 2009 | Completed final sign-off Oct 2009 | 448 Laidley St | replace existing windows in front of house. replace existing cabinet doors on existing kitchen cabinets. replace countertops with new. min 50 % of kitchen light watts shall be of he lights. replace windows in kind, same size config.Details
replace existing windows in front of house. replace existing cabinet doors on existing kitchen cabinets. replace countertops with new. min 50 % of kitchen light watts shall be of he lights. replace windows in kind, same size config. | $9,000 |
| May 5, 2009 | Completed final sign-off Jun 2009 | 131 Congo St | take out 1 kitchen sink cabinet, replace with new. new sink, faucet. no structural changes.Details
take out 1 kitchen sink cabinet, replace with new. new sink, faucet. no structural changes. | $3,000 |
| Apr 27, 2009 | Completed final sign-off Jun 2009 | 327 Day St | kitchen remodel. replace cabinets. re-use existing appliances. no structural changes.Details
kitchen remodel. replace cabinets. re-use existing appliances. no structural changes. | $12,000 |
| Mar 23, 2004 | Completed final sign-off Jun 2004 | 19 Tuscany Al | kitchen and bathrm remodel, remove wll and add (n) beam between dining/living rms in top levelDetails
kitchen and bathrm remodel, remove wll and add (n) beam between dining/living rms in top level | $20,000 |
| Oct 29, 2003 | Completed final sign-off Jan 2004 | 140 Shawnee Av | kitchen remodel within existing kitchen walls. no structural.Details
kitchen remodel within existing kitchen walls. no structural. | $14,000 |
| Nov 7, 2000 | Completed final sign-off Feb 2001 | 21 Tuscany Al | kitchen & bath re-model wall between living & dining . replace with beamDetails
kitchen & bath re-model wall between living & dining . replace with beam | $15,000 |
| May 23, 2000 | Completed final sign-off Sep 2000 | 65 05th Av | remodel kitchen , repalce cabients,appliances, countertopDetails
remodel kitchen , repalce cabients,appliances, countertop | $30,000 |