Greentech Industry Inc
- Based in
- Concord
- On San Francisco permits
- Dec 2011 to Oct 2018
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2013 | Completed final sign-off Mar 2014 | 1941 Mission St | install 2 new aluminum windows in back of the bldg. same opening, same type. u-factor 0.40 max. repair interior stairs from top floor to roof less than 50%. to comply with items #2 and #4. nov #201332531Details
install 2 new aluminum windows in back of the bldg. same opening, same type. u-factor 0.40 max. repair interior stairs from top floor to roof less than 50%. to comply with items #2 and #4. nov #201332531 | $1,800 |