Greenscape Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- May 2015 to Feb 2026
- Last 24 months
- 1 permit filed
11 permits since 2000: 9 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 3 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2020 | Completed final sign-off Jan 2021 | 526 23rd Av | water damage fom 3rd floor deck to 2nd floor bedrooms, found dry root. drywall removal on 2nd floor ceiling to repair damaged areas and rotted siding removal on 3rd floor rear deck. 300 sq ft drywall in bedroom, 200 linear ft siding, replace sliding doors at rearDetails
water damage fom 3rd floor deck to 2nd floor bedrooms, found dry root. drywall removal on 2nd floor ceiling to repair damaged areas and rotted siding removal on 3rd floor rear deck. 300 sq ft drywall in bedroom, 200 linear ft siding, replace sliding doors at rear | $12,000 |