Greenscape Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- May 2015 to Feb 2026
- Last 24 months
- 1 permit filed
11 permits since 2000: 9 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2026 | In progress issued Feb 2026 | 225 Ankeny St | at back of the building: repair approximately 500 sq ft of siding and replace 4 windows, not facing street, same size, same location, same opening, same material.u< 0.30Details
at back of the building: repair approximately 500 sq ft of siding and replace 4 windows, not facing street, same size, same location, same opening, same material.u< 0.30 | $20,000 |
| Mar 28, 2024 | Completed final sign-off Apr 2024 | 1545 Lake St | owner had window company replace back windows and found rot around windows at back on the 2nd floor, need minor repair in kind (as-build). dry rot repair approx. 50sq.ft. ref bpa# 202311211223Details
owner had window company replace back windows and found rot around windows at back on the 2nd floor, need minor repair in kind (as-build). dry rot repair approx. 50sq.ft. ref bpa# 202311211223 | $8,000 |
| Jun 30, 2023 | Completed final sign-off Jun 2024 | 1238 Page St | dry rot repair inside the common area and drywall repair leak coming from the roof. approx 100 sfDetails
dry rot repair inside the common area and drywall repair leak coming from the roof. approx 100 sf | $5,000 |
| Dec 30, 2020 | Completed final sign-off Jan 2021 | 65 Manor Dr | dry rot repair - demo stucoo 4x16ft at right side of house & wrap corner & repair plywood and restucoo patch, in-kind repair & color match.Details
dry rot repair - demo stucoo 4x16ft at right side of house & wrap corner & repair plywood and restucoo patch, in-kind repair & color match. | $5,000 |
| Aug 15, 2020 | Completed final sign-off Jan 2021 | 526 23rd Av | water damage fom 3rd floor deck to 2nd floor bedrooms, found dry root. drywall removal on 2nd floor ceiling to repair damaged areas and rotted siding removal on 3rd floor rear deck. 300 sq ft drywall in bedroom, 200 linear ft siding, replace sliding doors at rearDetails
water damage fom 3rd floor deck to 2nd floor bedrooms, found dry root. drywall removal on 2nd floor ceiling to repair damaged areas and rotted siding removal on 3rd floor rear deck. 300 sq ft drywall in bedroom, 200 linear ft siding, replace sliding doors at rear | $12,000 |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 445 Burnett Av | unit#102 dry rot repair in bathroom exterior wall, kitchen & bathroom remodel. drywall and kitchen cabinets.Details
unit#102 dry rot repair in bathroom exterior wall, kitchen & bathroom remodel. drywall and kitchen cabinets. | $36,800 |
| Jun 11, 2018 | Completed final sign-off Jul 2021 | 1578 Shafter Av | revision to permit #201504244562. reduction in scope to reduce 3 story to 2 story structure at rear within required rear year. 2 bedroomds, 1 bathroom. 293 sf.Details
revision to permit #201504244562. reduction in scope to reduce 3 story to 2 story structure at rear within required rear year. 2 bedroomds, 1 bathroom. 293 sf. | |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 650 Kirkham St | reroofingDetails
reroofing | $12,000 |
| Sep 12, 2017 | Completed final sign-off Oct 2017 | 1366 17th Av | dry rot repair court area not visible to the street. replace framing and stucco in like kind.Details
dry rot repair court area not visible to the street. replace framing and stucco in like kind. | $10,000 |
| Sep 6, 2016 | Completed final sign-off Oct 2016 | 1366 17th Av | remove portions of the existing stucco at the front of the building and repair dry rot and reconstruct to match existing (same design and details).Details
remove portions of the existing stucco at the front of the building and repair dry rot and reconstruct to match existing (same design and details). | $14,630 |
| May 15, 2015 | Completed final sign-off Oct 2015 | 407 Missouri St | replace in kind stucco, windows, doors @ facadeDetails
replace in kind stucco, windows, doors @ facade | $20,000 |