Back to kitchen remodel contractors
Greenport Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Sep 2021 to Sep 2026
- Last 24 months
- 6 permits filed
9 permits since 2000: 8 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 52 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2025 | Completed final sign-off Jan 2026 | 638 19th St | remove (e) gas fireplace: install 9 can lights throughout, remodel primary bathrm with new tile shower, (n) double sink vanity; remodel main bathrm with tile shower, new vaninty with sink all new plumbimg fixtures add new sink basin with new faucet, replace kitchen counter tops and (2) window casingDetails
remove (e) gas fireplace: install 9 can lights throughout, remodel primary bathrm with new tile shower, (n) double sink vanity; remodel main bathrm with tile shower, new vaninty with sink all new plumbimg fixtures add new sink basin with new faucet, replace kitchen counter tops and (2) window casing | $150,000 |
| Jul 6, 2022 | Completed final sign-off Feb 2023 | 3245 Cabrillo St | minor kitchen remodel (in kind) including removal and replacement of: cabinets, fixtures, finishes. no changes to walls, windows, doors, or architectural elements.Details
minor kitchen remodel (in kind) including removal and replacement of: cabinets, fixtures, finishes. no changes to walls, windows, doors, or architectural elements. | $60,000 |
| Jun 14, 2022 | Completed final sign-off Sep 2022 | 2860 Washington St | interior kitchen remodel including replacing all kitchen cabinets, plumbing fixtures and appliances, and the demolition of a portion of an interior non-bearing wall and some ceiling soffits.Details
interior kitchen remodel including replacing all kitchen cabinets, plumbing fixtures and appliances, and the demolition of a portion of an interior non-bearing wall and some ceiling soffits. | $100,000 |