Back to kitchen remodel contractors
Greenforest Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Sep 2025
- Last 24 months
- 1 permit filed
20 permits since 2000: 16 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2013 | Completed final sign-off Jan 2014 | 64 Navajo Av | repair fire and water damage to kitchen. scope of work similar to modest kitchen remodel, replace sheetrock in kitchen and nook area, reinstall existing cabinets, and appliances, bring kitchen electrical up to codeDetails
repair fire and water damage to kitchen. scope of work similar to modest kitchen remodel, replace sheetrock in kitchen and nook area, reinstall existing cabinets, and appliances, bring kitchen electrical up to code | $15,000 |
| Jan 11, 2012 | Completed final sign-off Jul 2012 | 4664 19th St | remodel kitchen and bath at 2nd floor unitDetails
remodel kitchen and bath at 2nd floor unit | $16,000 |
| Nov 23, 2009 | Completed final sign-off Jun 2010 | 2124 Hyde St | 2nd fl unit 2. interior remodel of kitchen and bathroom, create new bedroom by construction of new wall. new doors at bedroom closet. door to new bedroom not to be locked.Details
2nd fl unit 2. interior remodel of kitchen and bathroom, create new bedroom by construction of new wall. new doors at bedroom closet. door to new bedroom not to be locked. | $27,000 |
| Mar 30, 2009 | Completed final sign-off Apr 2009 | 3325 Steiner St | repair work in commercial kitchen (contry sky restaurant) to correct nov# 200996780. 6 x 2' subfloor wood support deteriorated underneath refridgerator. no structural work noted in complaint. maintenance work only to be made with like materials.Details
repair work in commercial kitchen (contry sky restaurant) to correct nov# 200996780. 6 x 2' subfloor wood support deteriorated underneath refridgerator. no structural work noted in complaint. maintenance work only to be made with like materials. | $400 |
| Aug 14, 2008 | Completed final sign-off Nov 2009 | 1250 Sacramento St | remodel of seven existing units, updating elect, plumb, bathrooms & kitchens, new floor plan @ unit, install new vinl windows in rear & side, wood at front. repair or replace 24 electric heaters. add 12 new electric heaters.Details
remodel of seven existing units, updating elect, plumb, bathrooms & kitchens, new floor plan @ unit, install new vinl windows in rear & side, wood at front. repair or replace 24 electric heaters. add 12 new electric heaters. | $100,000 |
| Apr 21, 2008 | Completed final sign-off May 2008 | 1232 07th Av | bring kitchen electrical up to code: replace exist incandescent canister lighting w/ flourescent cans, add req countertop receptacles & samll applicance circuit. dedicated circuits for dishwasher,disposal,microwave.general work req opening ceiling & select areas of wall.Details
bring kitchen electrical up to code: replace exist incandescent canister lighting w/ flourescent cans, add req countertop receptacles & samll applicance circuit. dedicated circuits for dishwasher,disposal,microwave.general work req opening ceiling & select areas of wall. | $9,000 |
| Jan 22, 2008 | Completed final sign-off Apr 2008 | 2124 Hyde St | unit #3- remodel kitchen and bathroom on 3rd floor. remove non-bearing walls at living room, dining room and kitchen. new wall in living room to create new study.Details
unit #3- remodel kitchen and bathroom on 3rd floor. remove non-bearing walls at living room, dining room and kitchen. new wall in living room to create new study. | $35,000 |
| Jul 26, 2006 | Expired or cancelled expired Jan 2010 | 2124 Hyde St | remodel entire studio #a (240 sq ft) on ground floor. new kitchen cabinets & appliances, new bathroom fixtures, new finishes on floor & walls. no structural work. new lighting.Details
remodel entire studio #a (240 sq ft) on ground floor. new kitchen cabinets & appliances, new bathroom fixtures, new finishes on floor & walls. no structural work. new lighting. | $25,000 |
| May 8, 2006 | Expired or cancelled expired Jan 2010 | 2124 Hyde St | revise 200512099928- (kitchen remodel units #1,4,5,6) add bathroom remodel units #1,4,5,6 - new tile, new sink & fixture, new medicine cabinet. add drywall repairs in bedrooms #5, living room #4 & 5.Details
revise 200512099928- (kitchen remodel units #1,4,5,6) add bathroom remodel units #1,4,5,6 - new tile, new sink & fixture, new medicine cabinet. add drywall repairs in bedrooms #5, living room #4 & 5. | $25,000 |