Green Street Construction
- Based in
- Pacifica
- On San Francisco permits
- Mar 2001 to Sep 2026
- Last 24 months
- 3 permits filed
74 permits since 2000: 49 completed, 1 in progress, 8 never finaled, 16 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
7 stairs permits: 4 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 44 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 1274 Vallejo St | repairs to (e) deck, stairs, handrails, repair of concrete steps and handrail at side of house. new railing and handrail to eliminate gaps where needed. repalce rotten deck boards and treads. all work to be less than 50% of existing. not visible from streetDetails
repairs to (e) deck, stairs, handrails, repair of concrete steps and handrail at side of house. new railing and handrail to eliminate gaps where needed. repalce rotten deck boards and treads. all work to be less than 50% of existing. not visible from street | $15,000 |
| Mar 8, 2016 | Expired or cancelled expired Oct 2025 | 1560 08th Av | repair (e) stairwell in-kind. replace broken handrails, partial broken/dryrotten stringer, reinforce/replace 4x4 posting. total of work is less than 50% of (e). side stair. not visible on the street.Details
repair (e) stairwell in-kind. replace broken handrails, partial broken/dryrotten stringer, reinforce/replace 4x4 posting. total of work is less than 50% of (e). side stair. not visible on the street. | $12,000 |
| Nov 9, 2007 | Completed final sign-off Nov 2007 | 1063 Pacific Av | comply w/ nov 200728210: correct illegal conversion of 2 units into 1 unit by reinstalling dividing wall at first floor stairway. the legal use is two units.Details
comply w/ nov 200728210: correct illegal conversion of 2 units into 1 unit by reinstalling dividing wall at first floor stairway. the legal use is two units. | $2,000 |
| Jan 10, 2005 | Completed final sign-off Jan 2005 | 256 Miramar Av | horizontal addition- add siding to stairs & change treads to slate. revision to 200304162425Details
horizontal addition- add siding to stairs & change treads to slate. revision to 200304162425 | $1,000 |
| Nov 17, 2003 | Completed final sign-off Feb 2004 | 1278 03rd Av | dry rot replacemlent of trim boards, siding at side, lightwalls stair landing & rear of house, totalDetails
dry rot replacemlent of trim boards, siding at side, lightwalls stair landing & rear of house, total | $6,000 |
| Apr 16, 2003 | Expired or cancelled expired Jan 2005 | 256 Miramar Av | refurnish exist front stair & landing replace in kind. see 2002/09/12/9318.Details
refurnish exist front stair & landing replace in kind. see 2002/09/12/9318. | $5,000 |
| Nov 13, 2001 | Completed final sign-off Jan 2002 | 311 Mullen Av | repair front stairs where rotten repair in kind (4 steps total, no chnge in stringers)Details
repair front stairs where rotten repair in kind (4 steps total, no chnge in stringers) | $500 |